Case study:County Gardens, Mayes Brook: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 18: Line 18:
|Main contact surname=O’Shea
|Main contact surname=O’Shea
|Contact organisation=Environment Agency
|Contact organisation=Environment Agency
|Contact organisation url=www.gov.uk/government/organisations/environment-agency
|Multi-site=No
|Multi-site=No
|Project summary=Proposals should aim to enhance the area for nature conservation whilst increasing flood storage capacity. Such measures could include the reinstatement of a natural right bank and the incorporation of backwaters and other wetland habitats. The potential for contaminated arising are unknown, however there is scope for the re-use of materials in bund creation.  The site identified is a side-spill flood alleviation area situated on the right bank 2400m².  The channel is largely linear and has been modified in the past with a reinforced artificial bank and sluice situated centrally on the right bank.  The earth-bunded flood storage area comprises well maintained grassland, which is cut 4-6 times a year during the growing season. The area is inundated 3-4 times a year and requires dredging every 5-10years
|Project summary=Proposals should aim to enhance the area for nature conservation whilst increasing flood storage capacity. Such measures could include the reinstatement of a natural right bank and the incorporation of backwaters and other wetland habitats. The potential for contaminated arising are unknown, however there is scope for the re-use of materials in bund creation.  The site identified is a side-spill flood alleviation area situated on the right bank 2400m².  The channel is largely linear and has been modified in the past with a reinforced artificial bank and sluice situated centrally on the right bank.  The earth-bunded flood storage area comprises well maintained grassland, which is cut 4-6 times a year during the growing season. The area is inundated 3-4 times a year and requires dredging every 5-10years

Revision as of 12:22, 9 April 2014

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 51° 31' 47.28" N, 0° 5' 39.90" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes
Country England
Main contact forename Becca
Main contact surname O’Shea
Main contact user ID
Contact organisation Environment Agency
Contact organisation web site http://www.gov.uk/government/organisations/environment-agency
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


Proposals should aim to enhance the area for nature conservation whilst increasing flood storage capacity. Such measures could include the reinstatement of a natural right bank and the incorporation of backwaters and other wetland habitats. The potential for contaminated arising are unknown, however there is scope for the re-use of materials in bund creation. The site identified is a side-spill flood alleviation area situated on the right bank 2400m². The channel is largely linear and has been modified in the past with a reinforced artificial bank and sluice situated centrally on the right bank. The earth-bunded flood storage area comprises well maintained grassland, which is cut 4-6 times a year during the growing season. The area is inundated 3-4 times a year and requires dredging every 5-10years

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information