Case study:River Skerne- Life project: Difference between revisions
No edit summary |
No edit summary |
||
Line 33: | Line 33: | ||
{{Toggle content start}} | {{Toggle content start}} | ||
{{ | {{Case study subcatchment | ||
|Subcatchment= | |Subcatchment=Tees US Low Worsall | ||
}} | }} | ||
{{Site | {{Site |
Revision as of 12:19, 26 September 2013
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Economic aspects, Habitat and biodiversity, Social benefits, Water quality |
Country | England |
Main contact forename | RRC |
Main contact surname | River Restoration Centre |
Main contact user ID | User:NickRRC |
Contact organisation | Life Project |
Contact organisation web site | http://www.therrc.co.uk |
Partner organisations | River Restoration Centre, Darlington Borough Council, Environment Agency, Natural England |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The Skerne demonstration site is located in the town of Darlington, County Durham and demonstrates what can be achieved in an urban environment. The Skerne has been straightened and enlarged to reduce flooding and to drain the surrounding urban area. Much of the floodplain has been raised by old industrial waste tipping, with gas and sewer pipes running alongside the river. As a result of these constraints, restoration opportunities were severely limited - typical of urban rivers elsewhere.
A 2km length of the river has been restored. Four new meanders have been formed in a remaining section of floodplain used as open parkland. The excess soil was used to landscape nearby steep slopes. Riverbanks have been strengthened with willow and reeds to prevent erosion. Thirteen ugly surface water outfalls have been replaced with underground inspection /collection chambers that firstly intercept pollution and then discharge the water into the river below water level.
Elsewhere, where the river could not be re-meandered, it has been enhanced by reshaping and narrowing the bed to vary the flow and to allow riverside plants to flourish. New footpaths and planting schemes complete the theme of "bringing the countryside into town", which locally has been greatly appreciated.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|