Case study:Philips Park: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 33: Line 33:
*Monitoring programme established
*Monitoring programme established
}}
}}
{{Image gallery}}
{{Image gallery end}}
{{Toggle button}}
{{Toggle content start}}
{{Case study subcatchment
{{Case study subcatchment
|Subcatchment=River Medlock
|Subcatchment=River Medlock
Line 50: Line 54:
{{Monitoring documents}}
{{Monitoring documents}}
{{Monitoring documents end}}
{{Monitoring documents end}}
{{Image gallery}}
{{Image gallery end}}
{{Additional Documents}}
{{Additional Documents}}
{{Additional Documents end}}
{{Additional Documents end}}
Line 57: Line 59:
{{Additional links and references footer}}
{{Additional links and references footer}}
{{Supplementary Information}}
{{Supplementary Information}}
{{Toggle content end}}

Revision as of 08:43, 6 September 2013

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 53° 29' 22.57" N, 2° 11' 39.50" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Planned
Project web site
Themes Flood risk management, Hydromorphology
Country England
Main contact forename Oliver
Main contact surname Southgate
Main contact user ID
Contact organisation
Contact organisation web site
Partner organisations
Parent multi-site project

Case_study:River Irwell Restoration Project

This is a parent project
encompassing the following
projects
No
Brick lined channel through the park

Project summary

Edit project overview to modify the project summary.


One of the most heavily modified and constrained sections of river corridor in the UK. Failing for WFD (Fish, Hydromorphology and Invertebrates)

  • In it’s current condition presents a flood risk downstream
  • Has no natural connectivity with Clayton Vale and Philips Parks
  • No formal access for public
  • No recreational activities undertaken

feasibility

  • Completed flood risk assessment
  • Completed a full contaminated land assessment
  • Engaged with the community via the River Restoration in Schools project
  • Surrounding Ecology and Biodiversity surveys complete
  • Community and partner engagement
  • Partnerships secured
  • Full designs complete
  • Monitoring programme established

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Subcatchment:River Medlock


Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information