Case study:Moreton Channel Gravel Reprofiling: Difference between revisions
Jump to navigation
Jump to search
Mattleeson (talk | contribs) No edit summary |
Mattleeson (talk | contribs) No edit summary |
||
Line 42: | Line 42: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure=Reprofiling of channel bed to create more diverse habitat for aquatic organisms - eg. habitat suitable for fish throughout their lifecycle (spawning to adult). | |Bank and bed modifications measure=Reprofiling of channel bed to create more diverse habitat for aquatic organisms - eg. habitat suitable for fish throughout their lifecycle (spawning to adult). Some LWD dams placed to further improve habitat diversity. | ||
}} | }} | ||
{{Hydromorphological quality elements header}} | {{Hydromorphological quality elements header}} |
Revision as of 15:55, 20 August 2012
This case study is pending approval by a RiverWiki administrator.
Location: 50° 42' 27.12" N, 2° 16' 49.41" W
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Habitat and biodiversity |
Country | England |
Main contact forename | Alasdair |
Main contact surname | Maxwell |
Main contact user ID | |
Contact organisation | Environment Agency |
Contact organisation web site | http://www.environment-agency.gov.uk |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Site
Name | Moreton Channel |
---|---|
WFD water body codes | GB108044009690 |
WFD (national) typology | Low, Medium, Calcareous |
WFD water body name | Frome Dorset (Lower) & Furzebrook Stream |
Pre-project morphology | Very little geomorphological diversity or in channel features. |
Reference morphology | Increased channel complexity, supporting greater ecological diversity. |
Desired post project morphology | |
Heavily modified water body | No |
National/international site designation | |
Local/regional site designations | |
Protected species present | No |
Invasive species present | No |
Species of interest | Brown trout, salmon, grayling, bullhead, minnow, brook-lamprey & stoneloach |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | Rural - mixed land use. |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 500500 m <br />0.5 km <br />50,000 cm <br /> |
---|---|
Project started | |
Works started | 2010/09/01 |
Works completed | 2010/09/05 |
Project completed | |
Total cost category | 1 - 10 k€ |
Total cost (k€) | 72007,200 k€ <br />7,200,000 € <br /> |
Benefit to cost ratio | |
Funding sources | Environment Agency and Frome, Piddle and West Dorset Fishery Association |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Reprofiling of channel bed to create more diverse habitat for aquatic organisms - eg. habitat suitable for fish throughout their lifecycle (spawning to adult). Some LWD dams placed to further improve habitat diversity. |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Fish | Yes | Yes | No | Yes | No | Improvement |
Macrophytes | Yes | Yes | No | Yes | No | Improvement |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|
Supplementary Information
Edit Supplementary Information