Case study:Salmons Brook Urban Diffuse Pollution Project: Difference between revisions
No edit summary |
No edit summary |
||
Line 17: | Line 17: | ||
}} | }} | ||
{{Case study subcatchment}} | {{Case study subcatchment}} | ||
{{Site}} | {{Site | ||
|Name=Lower Lee | |||
|Heavily modified water body=No | |||
|Protected species present=No | |||
|Invasive species present=No | |||
}} | |||
{{Project background}} | {{Project background}} | ||
{{Motivations}} | {{Motivations}} |
Revision as of 06:10, 12 August 2013
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | In progress |
---|---|
Project web site | |
Themes | Habitat and biodiversity, Hydromorphology, Social benefits, Water quality |
Country | England |
Main contact forename | Aimee |
Main contact surname | Felus |
Main contact user ID | |
Contact organisation | |
Contact organisation web site | |
Partner organisations | Environment Agency, LB Enfield, University College London, Friends of groups, Thames Water |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The Lower Lee Valley waterways are profoundly polluted. The problem of urban diffuse pollution is chronic and highly visible. It blights the potential of East London’s rivers, reducing them as an amenity for people, damaging them for wildlife and turning them into open sewers. These problems have existed for many years now, but increasing population density and climate change are seeing them intensify. What has been missing from efforts to tackle the problems is properly involving people. Awareness of the pollution is very low, evidenced by the proportionately small number of calls to the Environment Agency’s Pollution Hotline. East London’s communities are fundamental to any long lasting improvement in the Lower Lee Valley’s water quality. While strategic efforts will aim to address the problems truly sustainable solutions have to happen at the household and street level too.
The issue of diffuse pollution must be addressed as a priority in improvement works to rivers, oth-erwise rivers in East London will still run with wastewater and road run-off.
Thames21 has secured funding from DEFRA for the Salmon’s Brook Healthy River Challenge – a project to reduce diffuse urban pollution in the Salmon’s Brook, a main tributary of the River Lea in Enfield. The project will see the creation of six community centred bio-retention and sustainable urban drainage systems (SuDS) along the Salmons Brook. These SuDS will intercept diffuse urban pollution, provide attenuation for flooding, and create new areas of biodiverse habitat and new amenities for local people.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Site
Name | Lower Lee |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | No |
National/international site designation | |
Local/regional site designations | |
Protected species present | No |
Invasive species present | No |
Species of interest | |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | |
Works started | |
Works completed | |
Project completed | |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | |
Biology | |
Physico-chemical | |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|
Supplementary Information
Edit Supplementary Information