Case study:River Calder improvement project: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 174: | Line 174: | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure=Bank stabilisation, Partial weir removal, Cobble placement | |Bank and bed modifications measure=Bank stabilisation, Partial weir removal, Cobble placement | ||
|Social measures='Trout in the Town' project raising the awareness of | |Social measures='Trout in the Town' project raising the awareness of the river's value in schools | ||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} |
Revision as of 10:13, 9 August 2012
This case study is pending approval by a RiverWiki administrator.
Location: 53° 48' 46.98" N, 2° 14' 58.60" W
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Habitat and biodiversity, Hydromorphology |
Country | England |
Main contact forename | Nick |
Main contact surname | Elbourne |
Main contact user ID | User:NickRRC |
Contact organisation | River Restoration Centre |
Contact organisation web site | http://www.therrc.co.uk |
Partner organisations | Ribble Catchment Conservation Trust |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Edit project overview to modify the project summary.
The River Calder Improvement Project, led by the Ribble Catchment Conservation Trust (RCCT), aim to ease the passage of fish species (specifically trout) and encourage upstream migration whilst improving the riverine habitat as a whole. This was achieved by the lowering of existing weirs, fish pass installation and more general habitat enhancement.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Select a catchment/subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Site
Name | Ribble Catchment |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | Impounded, High width:depth |
Reference morphology | Sinuous |
Desired post project morphology | |
Heavily modified water body | true |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | Artificially regulated |
Dominant substrate | Silt, Gravel |
River corridor land use | Urban |
Average bankfull channel width category | 10 - 50 m |
Average bankfull channel width (m) | |
Average bankfull channel depth category | 2 - 5 m |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 600 m0.6 km <br />60,000 cm <br /> |
---|---|
Project started | 2010/06/01 |
Works started | |
Works completed | 2010/10/01 |
Project completed | |
Total cost category | 500 - 1000 k€ |
Total cost (k€) | 750 k€750,000 € <br /> |
Benefit to cost ratio | |
Funding sources | Ribble Catchment Conservation Trust |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Bank stabilisation, Partial weir removal, Cobble placement |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | 'Trout in the Town' project raising the awareness of the river's value in schools |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|