Case study:Salisbury Avon Restoration Project: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 50: Line 50:
{{Measures
{{Measures
|Bank and bed modifications measure=Creation of gravel riffles to create fish spawning habitat and flow variation
|Bank and bed modifications measure=Creation of gravel riffles to create fish spawning habitat and flow variation
|Floodplain / River corridor=Tree planting for channel shading and to provide future woody debris;
|Floodplain / River corridor=Tree planting for channel shading and to provide future woody debris
|Planform / Channel pattern=Re-meandering of channelized sections, through the creation of berms and the use of woody debris, to restore natural deposition/erosion processes; the narrowing of over-widened channels to promote bed scouring and increase Ranunculus growth.
|Planform / Channel pattern=Re-meandering of channelized sections, through the creation of berms and the use of woody debris, to restore natural deposition/erosion processes; the narrowing of over-widened channels to promote bed scouring and increase Ranunculus growth.
}}
}}

Revision as of 14:30, 7 August 2013

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 51° 3' 41.42" N, 1° 48' 1.15" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status In progress
Project web site
Themes Habitat and biodiversity, Hydromorphology
Country England
Main contact forename John
Main contact surname Rattray
Main contact user ID
Contact organisation Wiltshire Wildlife Trust
Contact organisation web site http://www.wiltshirewildlife.org
Partner organisations Environment Agency, Natural England, Wessex Water, Wiltshire Fishery Association
This is a parent project
encompassing the following
projects
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


The Hampshire Avon has historically been dredged, over-widened and impounded in many places due to past river management. This has led to a reduction in the river’s geomorphological processes, which has, in turn, led to a decline in the habitat quality and quantity throughout the reach. This decline, despite recent sympathetic management, has continued due to the lack of variation in channel form and flows, as well as riparian land use.

Description of Works This project focuses on two 750m reaches of the Hampshire Avon at Figheldean and West Amesbury, identified in the Strategic Framework for the Restoration of the River Avon (SFfRRA) as being in need of restoration for habitat quality. The restoration aims to return a more natural flow regime at the two sites, in order to promote natural bed scouring and increase riparian habitat for a variety of organisms. This will be achieved through:

  • the narrowing of over-widened channels to promote bed scouring and increase Ranunculus growth;
  • re-meandering of channelized sections, through the creation of berms and the use of woody debris, to restore natural deposition/erosion processes;
  • introduction of woody debris to aid channel narrowing and create in-channel habitat for fish and invertebrates;
  • creation of gravel riffles to create fish spawning habitat and flow variation;
  • tree planting for channel shading and to provide future woody debris;
  • riparian habitat creation/enhancement, such as scrape creation for invertebrate and bird life and bank re-profiling to reconnect the river to the floodplain (re-wetting wet woodland/pasture).

Each restoration project completed will act as an example to future projects in the area. Through appropriate publi-cation and engagement this project will help to raise awareness of river restoration techniques and implementation on the River Avon catchment. Restoring natural functions to the river system will also increase the potential of the river to adapt to a changing climate in the future as part of a living landscape.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.

Catchment and subcatchment

Select a catchment/subcatchment


Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)

Catchment

River basin district South West
River basin South Devon

Subcatchment

River name Avon
Area category 10 - 100 km²
Area (km2)
Maximum altitude category 500 - 1000 m
Maximum altitude (m) 513513 m <br />0.513 km <br />51,300 cm <br />
Dominant geology Siliceous
Ecoregion Great Britain
Dominant land cover Improved grassland
Waterbody ID GB108046004940



Site

Edit site
Name Hampshire Avon
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology Actively meandering
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Edit project background
Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category 100 - 500 k€
Total cost (k€) 286.470286.47 k€ <br />286,470 € <br />
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Edit reasons for restoration
Mitigation of a pressure
Hydromorphology Structure & condition of riparian zone, Width & depth variation, Freshwater flow regime, Flow velocities
Biology
Physico-chemical
Other reasons for the project Climate change mitigation, Socio-Economic


Measures

Edit Measures
Structural measures
Bank/bed modifications Creation of gravel riffles to create fish spawning habitat and flow variation
Floodplain / River corridor Tree planting for channel shading and to provide future woody debris
Planform / Channel pattern Re-meandering of channelized sections, through the creation of berms and the use of woody debris, to restore natural deposition/erosion processes; the narrowing of over-widened channels to promote bed scouring and increase Ranunculus growth.
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Edit Hydromorphological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Edit biological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Edit Physico-chemical
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Edit Other responses
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents

Upload monitoring documents



Image gallery


Map with the area


Additional documents and videos

Upload additional documents

Project Briefing Note


Additional links and references

Edit links and references
Link Description

Supplementary Information

Edit Supplementary Information