Case study:River Glaven conservation group: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 23: | Line 23: | ||
|Contact organisation url=www.therrc.co.uk | |Contact organisation url=www.therrc.co.uk | ||
|Multi-site=No | |Multi-site=No | ||
|Project summary=The objectives of the project were to improve the in-river habitat upstream from Letheringsett Ford, to re-connect the river and floodplain and to develop an experience base which would serve the River Glaven Conservation Group (RGCG) well on other projects. | |Project picture=PA230021.JPG | ||
|Project summary=The objectives of the project were to improve the in-river habitat upstream from Letheringsett Ford, to re-connect the river and floodplain and to develop an experience base which would serve the River Glaven Conservation Group (RGCG) well on other projects. | |||
}} | }} | ||
{{Case study subcatchment | {{Case study subcatchment |
Revision as of 14:58, 8 August 2012
This case study is pending approval by a RiverWiki administrator.
Location: 52° 54' 6.53" N, 1° 3' 39.83" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Economic aspects, Land use management - fisheries"Land use management - fisheries" is not in the list (Economic aspects, Environmental flows and water resources, Fisheries, Flood risk management, Habitat and biodiversity, Hydropower, Hydromorphology, Land use management - agriculture, Land use management - forestry, Monitoring, ...) of allowed values for the "Theme" property., Monitoring, Spatial planning |
Country | England |
Main contact forename | Nick |
Main contact surname | Elbourne |
Main contact user ID | User:NickRRC |
Contact organisation | River Restoration Centre |
Contact organisation web site | http://www.therrc.co.uk |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Edit project overview to modify the project summary.
The objectives of the project were to improve the in-river habitat upstream from Letheringsett Ford, to re-connect the river and floodplain and to develop an experience base which would serve the River Glaven Conservation Group (RGCG) well on other projects.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Select a catchment/subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Anglian |
---|---|
River basin | North Norfolk |
Subcatchment
River name | Glaven |
---|---|
Area category | 10 - 100 km² |
Area (km2) | |
Maximum altitude category | 100 - 200 m |
Maximum altitude (m) | 103103 m <br />0.103 km <br />10,300 cm <br /> |
Dominant geology | Calcareous |
Ecoregion | Great Britain |
Dominant land cover | Arable and Horticulture |
Waterbody ID | GB105034055780 |
Other case studies in this subcatchment: Nine Chalk Rivers Project - Glaven Catchment, River Restoration at Hunworth (River Glaven)
Site
Name | Glaven |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | Single channel, High width:depth |
Reference morphology | Single channel, Sinuous, Pool-riffle |
Desired post project morphology | |
Heavily modified water body | true |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | Quick run-off |
Dominant substrate | Gravel, Bedrock, Cobble |
River corridor land use | Extensive agriculture, Woodland, Grassland |
Average bankfull channel width category | 10 - 50 m |
Average bankfull channel width (m) | |
Average bankfull channel depth category | 0.5 - 2 m |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 400 m0.4 km <br />40,000 cm <br /> |
---|---|
Project started | 2003/01/01 |
Works started | 2006/01/01 |
Works completed | 2006/01/01 |
Project completed | |
Total cost category | |
Total cost (k€) | 8 k€8,000 € <br /> |
Benefit to cost ratio | |
Funding sources | Wild Trout Trust, Environment Agency |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | Environment Agency | ||||
Stakeholder engagement and communication | Environment Agency | ||||
Works and works supervision | Environment Agency | ||||
Post-project management and maintenance | Environment Agency | ||||
Monitoring | Environment Agency |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Re-profiling, Gravel placement, Placement of LWD |
Floodplain / River corridor | Re-connection with wider floodplain |
Planform / Channel pattern | Channel narrowing, Creation of braided channel |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Fish: Abundance | Yes | Yes | Awaiting results |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|