Case study:River Quaggy- Chinbrook meadows: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
 
(29 intermediate revisions by 5 users not shown)
Line 1: Line 1:
{{Case_study_status
{{Case study status
|Approval status=
|Approval status=Approved
   
 
 
   
      Draft
}}
}}
{{Location
{{Location
|Location=51.42931720850269, 0.02727198600769043
|Location=51.42900931339469, 0.027272701263427734
}}
{{Project overview
|Status=Complete
|Themes=Habitat and biodiversity, Social benefits, Water quality, Urban
|Country=England
|Main contact forename=Dave
|Main contact surname=Webb
|Main contact id=Ascarr
|Contact organisation=Environment Agency
|Contact organisation url=www.environment-agency.gov.uk
|Partner organisations=QWAG, London Borough of Lewisham,
|Multi-site=No
|Project picture=Chinbrook meadows After.jpg
|Picture description=Chinbrook Meadows soon after the works had been completed
|Project summary=This project is an excellent example of a partnership initiative that has not only restored the river and floodplain, but has also paid careful attention to improving the park amenities. The channel work was completed in spring 2002 and by September that year there had already been considerable movement of gravels. Natural geomorphological features including a pool/riffle sequence, gravel bars and steeper banks had formed. The pond has been colonised by invertebrates and the vegetation planted along the banks is now providing good cover in both the planted and unplanted sections.
 
'''Site background'''
This section of the River Quaggy, with a flashy flow regime, was channelised and straightened between 1960-1970 as
part of a flood alleviation scheme. Prior to restoration it was encased in concrete with fences and high privet hedges
near to each bank. It could neither be accessed nor viewed by the public and was devoid of natural fauna and flora.
 
'''Objectives'''
To reintroduce the floodplain as a natural flood storage area as part of a larger catchment flood alleviation plan; to enable the River Quaggy to become accessible to the public and hence create a local amenity; to create an environment where native fauna and flora could colonise and allow for natural channel processes.
 
'''Design'''
*The concrete channel in the park was replaced by a sinuous channel, allowing easy
access. It was (except where the cost of moving existing sewage drains prevented
this) cut to follow its path prior to channelisation.
*Whilst cutting the channel old gravels were evacuated and sufficient ‘room’ was left
along the river corridor to allow for natural adjustment.
*The margins of the channel were planted using a reputable source of native wetland
plants (including iris, water mint and reeds), a wetland grass and wild flower mix was
also sown. One section downstream has not been planted since there was a request
from the local group to allow natural colonisation.
*Flood storage ponds were included in the scheme and at the upstream section a
boardwalk, pond dipping and educational area, were incorporated to attract local
school children.
}}
}}
{{Project_overview
{{Image gallery}}
|Status=
{{Case study image
   
|File name=Chinbrook meadows before.jpg
   
|Caption=The river Quaggy in Chinbrook meadows before restoration
      Complete
|Project web site url=
     
|Themes=
      Habitat and biodiversity,Social benefits,Water quality
|Country=
      England
|Main contact forename=
     
|Main contact surname=
     
|Main contact id=
     
|Contact organisation=
      Environment Agency
|Contact organisation url=
     
|Partner organisations=
     
|Multi-site=
     
|Name of parent multi-site project=
     
|Project picture=
     
|Picture description=
     
|Project summary=
     
}}
}}
{{Case_study_subcatchment
{{Image_gallery_end}}
|Subcatchment=
{{Toggle button}}
   
{{Toggle content start}}
   
 
      River Quaggy
{{Case study subcatchment
|Subcatchment=Quaggy
}}
}}
{{Site
{{Site
|Name=
|Name=River Quaggy
   
|WFD water body code=GB106039023290
   
|WFD (national) typology=Calcareous,
      River Quaggy
|WFD water body name=Quaggy
|WFD water body code=
|Pre-project morphology=Straight,Revetments
     
|Reference morphology=Sinuous
|WFD (national) typology=
|Heavily modified water body=Yes
     
|Protected species present=No
|WFD water body name=
|Invasive species present=No
     
|Dominant hydrology=Artificially regulated,Quick run-off
|Pre-project morphology=
|Dominant substrate=Bedrock
      Straight,Revetments
|River corridor land use=Urban
|Reference morphology=
|Average bankfull channel width category=2 - 5 m
      Sinuous
|Average bankfull channel depth category=0.5 - 2 m
|Heavily modified water body=
|Avrg channel gradient=0.3
      true
|Local site designation=
     
|Site designation=
     
|Protected species present=
     
|Invasive species present=
     
|Species=
     
|Dominant hydrology=
      Artificially regulated,Quick run-off
|Dominant substrate=
      Bedrock
|River corridor land use=
      Urban
|Average bankfull channel width category=
      2 - 5 m
|Avrg bankfull channel width=
     
|Average bankfull channel depth category=
      0.5 - 2 m
|Avrg1 bankfull channel depth=
     
|Mean discharge category=
     
|Mn discharge=
     
|Average channel gradient category=
     
|Avrg channel gradient=
      0.3
}}
}}
{{Project_background
{{Project background
|Reach length directly affected=
|Reach length directly affected=300 m
   
|Project started=2002/03/01
   
|Works completed=2002/10/01
      300 m
|Project completed=2002/04/02
|Project started=
|Total cost category=50 - 100 k€
      2002/03/01
|Total1 cost=100 k€
|Works started=
|Funding sources=Environment Agency
     
|Works completed=
      2002/10/01
|Project completed=
     
|Total cost category=
     
|Total1 cost=
      100 k€
|Funding sources=
      Environment Agency
|Investigation and design cost category=
     
|Invst and design cost=
     
|Investigation and design Lead organisation=
     
|Investigation and design Other contact forename=
     
|Investigation and design Other contact surname=
     
|Stakeholder1 engagement cost category=
     
|stk engagement cost=
     
|Stakeholder engagement Lead organisation=
     
|Stakeholder engagement Other contact forename=
     
|Stakeholder engagement Other contact surname=
     
|Works1 and supervision cost category=
     
|Wrk and supervision cost=
     
|Works and supervision Lead organisation=
     
|Works and supervision Other contact forename=
     
|Works and supervision Other contact surname=
     
|Post-project1 management and maintenance cost category=
     
|Post-project2 management and maintenance cost=
     
|Post-project management and maintenance Lead organisation=
     
|Post-project management and maintenance Other contact forename=
     
|Post-project management and maintenance Other contact surname=
     
|Monitoring1 cost category=
     
|Monitoring2 cost=
     
|Monitoring Lead organisation=
     
|Monitoring Other contact forename=
     
|Monitoring Other contact surname=
     
|Supplementary funding information=
     
}}
}}
{{Motivations
{{Motivations
Line 187: Line 95:
}}
}}
{{Measures
{{Measures
|Bank and bed modifications measure=
|Bank and bed modifications measure=Removal of revetments,Introduction of gravel,Planting of native species
   
|Floodplain / River corridor=Removal of embankments,Creation of wetland,Creation of pond
   
|Planform / Channel pattern=Adding sinuosity,
      Removal of revetments,Introduction of gravels,Planting of native species
|Wider stakeholder / citizen engagement=Information provision,Consultation
|Floodplain / River corridor=
      Removal of embankments,Creation of wetlands,Creation of ponds
|Planform / Channel pattern=
      Introduction of sinuosity
|Other technical measure=
     
|Management interventions=
     
|Social measures=
     
|Wider stakeholder / citizen engagement=
      Information provision,Consultation
}}
}}
{{Hydromorphological_quality_elements_header}}
{{Hydromorphological_quality_elements_header}}
Line 253: Line 149:
{{Monitoring_documents}}
{{Monitoring_documents}}
{{Monitoring_documents_end}}
{{Monitoring_documents_end}}
{{Image_gallery}}
 
{{Image_gallery_end}}
{{Additional Documents}}
{{Additional_Documents}}
{{Case study documents
|File name=Overview chinbrook.pdf
|Description=Overview leaflet
}}
{{Case study documents
|File name=River restoration mini.pdf
|Description=leaflet on social benefits
}}
{{Case study documents
|File name=Better places - Case Study 2 - Chinbrook Meadows.pdf
|Description=Better Place to Play case study
}}
{{Additional_Documents_end}}
{{Additional_Documents_end}}
{{Additional links and references header}}
{{Additional links and references header}}
{{Additional links and references
{{Additional links and references
|Link=http://en.wikipedia.org/wiki/Chinbrook_Meadows
|Link=www.therrc.co.uk/sites/default/files/projects/p1499.pdf
|Description=Wikipedia link
|Description=RRC site description
}}
}}
{{Additional links and references
{{Additional links and references
|Link=http://www.therrc.co.uk/case_studies/chinbrook_meadows.pdf
|Link=www.restorerivers.eu/Publications/tabid/2624/mod/11083/articleType/ArticleView/articleId/3123/Chinbrook-Meadows----A-better-place-to-play.aspx
|Description=RRC site description
|Description=Video on Chinbrook meadows
}}
}}
{{Additional links and references
{{Additional links and references
Line 271: Line 178:
}}
}}
{{Additional links and references
{{Additional links and references
|Link=http://www.greenchain.com/learning/sites/chinbrook-meadows.php
|Link=www.lewisham.gov.uk/inmyarea/openspaces/parks/Pages/chinbrook-meadows.aspx
|Description=Lewisham Council's link
}}
{{Additional links and references
|Link=en.wikipedia.org/wiki/Chinbrook_Meadows
|Description=Wikipedia link
}}
{{Additional links and references
|Link=www.greenchain.com/learning/sites/chinbrook-meadows.php
|Description=Green chain link
|Description=Green chain link
}}
}}
{{Additional_links_and_references_footer}}
{{Additional_links_and_references_footer}}
{{Supplementary_Information
{{Supplementary Information}}
|Information=
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
     
}}
{{Case_study_upload}}
{{Case_study_upload}}
{{Toggle content end}}

Latest revision as of 15:39, 6 June 2017

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 51° 25' 44.43" N, 0° 1' 38.18" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Habitat and biodiversity, Social benefits, Water quality, Urban
Country England
Main contact forename Dave
Main contact surname Webb
Main contact user ID User:Ascarr
Contact organisation Environment Agency
Contact organisation web site http://www.environment-agency.gov.uk
Partner organisations QWAG, London Borough of Lewisham
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Chinbrook Meadows soon after the works had been completed

Project summary

Edit project overview to modify the project summary.


This project is an excellent example of a partnership initiative that has not only restored the river and floodplain, but has also paid careful attention to improving the park amenities. The channel work was completed in spring 2002 and by September that year there had already been considerable movement of gravels. Natural geomorphological features including a pool/riffle sequence, gravel bars and steeper banks had formed. The pond has been colonised by invertebrates and the vegetation planted along the banks is now providing good cover in both the planted and unplanted sections.

Site background This section of the River Quaggy, with a flashy flow regime, was channelised and straightened between 1960-1970 as part of a flood alleviation scheme. Prior to restoration it was encased in concrete with fences and high privet hedges near to each bank. It could neither be accessed nor viewed by the public and was devoid of natural fauna and flora.

Objectives To reintroduce the floodplain as a natural flood storage area as part of a larger catchment flood alleviation plan; to enable the River Quaggy to become accessible to the public and hence create a local amenity; to create an environment where native fauna and flora could colonise and allow for natural channel processes.

Design

  • The concrete channel in the park was replaced by a sinuous channel, allowing easy

access. It was (except where the cost of moving existing sewage drains prevented this) cut to follow its path prior to channelisation.

  • Whilst cutting the channel old gravels were evacuated and sufficient ‘room’ was left

along the river corridor to allow for natural adjustment.

  • The margins of the channel were planted using a reputable source of native wetland

plants (including iris, water mint and reeds), a wetland grass and wild flower mix was also sown. One section downstream has not been planted since there was a request from the local group to allow natural colonisation.

  • Flood storage ponds were included in the scheme and at the upstream section a

boardwalk, pond dipping and educational area, were incorporated to attract local school children.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


The river Quaggy in Chinbrook meadows before restoration
ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Thames
River basin London

Subcatchment

River name Quaggy
Area category 10 - 100 km²
Area (km2)
Maximum altitude category 100 - 200 m
Maximum altitude (m) 135135 m <br />0.135 km <br />13,500 cm <br />
Dominant geology Calcareous
Ecoregion Great Britain
Dominant land cover Suburban
Waterbody ID GB106039023290



Other case studies in this subcatchment: Colfes School, Lidl, Manor House Gardens, Manor House Gardens Gauging Station, Manor Park, Mottingham Farm, Quaggy Flood Alleviation Scheme, Quaggy channel improvements, Sutcliffe Park, Sydenham Cottages Nature Reserve


Site

Name River Quaggy
WFD water body codes GB106039023290
WFD (national) typology Calcareous
WFD water body name Quaggy
Pre-project morphology Straight, Revetments
Reference morphology Sinuous
Desired post project morphology
Heavily modified water body Yes
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology Artificially regulated, Quick run-off
Dominant substrate Bedrock
River corridor land use Urban
Average bankfull channel width category 2 - 5 m
Average bankfull channel width (m)
Average bankfull channel depth category 0.5 - 2 m
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient 0.3
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 300 m0.3 km <br />30,000 cm <br />
Project started 2002/03/01
Works started
Works completed 2002/10/01
Project completed 2002/04/02
Total cost category 50 - 100 k€
Total cost (k€) 100 k€100,000 € <br />
Benefit to cost ratio
Funding sources Environment Agency

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure Riparian development
Hydromorphology Quantity & dynamics of flow, Channel pattern/planform
Biology Invertebrates, Macrophytes
Physico-chemical Oxygen balance
Other reasons for the project Landscape enhancement, Flood risk management


Measures

Structural measures
Bank/bed modifications Removal of revetments, Introduction of gravel, Planting of native species
Floodplain / River corridor Removal of embankments, Creation of wetland, Creation of pond
Planform / Channel pattern Adding sinuosity
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other Information provision, Consultation


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Invertebrates Yes Yes Yes Improvement
Macrophytes Yes Yes Yes Improvement

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description
http://www.therrc.co.uk/sites/default/files/projects/p1499.pdf RRC site description
http://www.restorerivers.eu/Publications/tabid/2624/mod/11083/articleType/ArticleView/articleId/3123/Chinbrook-Meadows----A-better-place-to-play.aspx Video on Chinbrook meadows
http://www.qwag.org.uk/quaggy/restoration.php Quaggy Waterways Action Plan link
http://www.lewisham.gov.uk/inmyarea/openspaces/parks/Pages/chinbrook-meadows.aspx Lewisham Council's link
http://en.wikipedia.org/wiki/Chinbrook Meadows Wikipedia link
http://www.greenchain.com/learning/sites/chinbrook-meadows.php Green chain link

Supplementary Information

Edit Supplementary Information