Case study:River Avon Stream project: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
 
(10 intermediate revisions by 5 users not shown)
Line 1: Line 1:
{{Case_study_status
{{Case study status
|Approval status=
|Approval status=Approved
   
 
 
   
      Draft
}}
}}
{{Location
{{Location
|Location=50.811, -1.809
|Location=50.811, -1.809
}}
}}
{{Project_overview
{{Project overview
|Status=
|Status=Complete
   
|Themes=Habitat and biodiversity, Monitoring, Water quality
   
|Country=England
      Complete
|Main contact forename=Jenny
|Project web site url=
|Main contact surname=Wheldon
     
|Contact organisation=Natural England
|Themes=
|Name of parent multi-site project=Case_study:stream
      Habitat and biodiversity,Water quality,Monitoring
|Multi-site=Yes
|Country=
|Project picture=STREAM, Amesbury, post 2009.JPG
      England
|Picture description=Avon at Amesbury, post-restoration works in 2009
|Main contact forename=
      Jenny
|Main contact surname=
      Wheldon
|Main contact id=
     
|Contact organisation=
      natural england
|Contact organisation url=
     
|Partner organisations=
     
|Multi-site=
      Yes
|Name of parent multi-site project=
      Case_study:stream
|Project picture=
     
|Picture description=
     
|Project summary=
     
}}
}}
{{Case_study_subcatchment
{{Image_gallery}}
|Subcatchment=
{{Image_gallery_end}}
   
{{Toggle button}}
   
{{Toggle content start}}
      Avon
{{Case study subcatchment
|Subcatchment=Hampshire Avon (Lower)
}}
}}
{{Site
{{Site
|Name=
|Name=River Avon
   
|WFD water body code=GB108043015840
   
|WFD water body name=Hampshire Avon (Lower)
      River Avon
|Pre-project morphology=Single channel, Straight, Embanked
|WFD water body code=
|Reference morphology=Sinuous, Pool-riffle
     
|Heavily modified water body=Yes
|WFD (national) typology=
|Site designation=EU - Special Area of Conservation
     
|Protected species present=No
|WFD water body name=
|Invasive species present=No
     
|Dominant hydrology=Quick run-off
|Pre-project morphology=
|Dominant substrate=Bedrock
      Single channel,Straight,Embanked
|River corridor land use=Urban,Extensive agriculture
|Reference morphology=
|Average bankfull channel width category=10 - 50 m
      Sinuous,Pool-riffle
|Average bankfull channel depth category=5 - 10 m
|Heavily modified water body=
      true
|Local site designation=
     
|Site designation=
      EU - Special Area of Conservation
|Protected species present=
     
|Invasive species present=
     
|Species=
     
|Dominant hydrology=
      Quick run-off
|Dominant substrate=
      Bedrock
|River corridor land use=
      Urban,Extensive agriculture
|Average bankfull channel width category=
      10 - 50 m
|Avrg bankfull channel width=
     
|Average bankfull channel depth category=
      5 - 10 m
|Avrg1 bankfull channel depth=
     
|Mean discharge category=
     
|Mn discharge=
     
|Average channel gradient category=
     
|Avrg channel gradient=
     
}}
}}
{{Project_background
{{Project background
|Reach length directly affected=
|Project started=2002/12/01
   
|Total1 cost=1000 k€
   
|Funding sources=European Commission,Heritage Lottery Fund (HLF), EU LIFE Programme,
     
|Project started=
      2002/12/01
|Works started=
     
|Works completed=
     
|Project completed=
     
|Total cost category=
     
|Total1 cost=
      1000 k€
|Funding sources=
      European Commission LIFE-Nature programme,Heritage Lottery Fund (HLF).
|Investigation and design cost category=
     
|Invst and design cost=
     
|Investigation and design Lead organisation=
     
|Investigation and design Other contact forename=
     
|Investigation and design Other contact surname=
     
|Stakeholder1 engagement cost category=
     
|stk engagement cost=
     
|Stakeholder engagement Lead organisation=
     
|Stakeholder engagement Other contact forename=
     
|Stakeholder engagement Other contact surname=
     
|Works1 and supervision cost category=
     
|Wrk and supervision cost=
     
|Works and supervision Lead organisation=
     
|Works and supervision Other contact forename=
     
|Works and supervision Other contact surname=
     
|Post-project1 management and maintenance cost category=
     
|Post-project2 management and maintenance cost=
     
|Post-project management and maintenance Lead organisation=
     
|Post-project management and maintenance Other contact forename=
     
|Post-project management and maintenance Other contact surname=
     
|Monitoring1 cost category=
     
|Monitoring2 cost=
     
|Monitoring Lead organisation=
     
|Monitoring Other contact forename=
     
|Monitoring Other contact surname=
     
|Supplementary funding information=
     
}}
}}
{{Motivations
{{Motivations
Line 187: Line 60:
}}
}}
{{Measures
{{Measures
|Bank and bed modifications measure=
|Bank and bed modifications measure=Planting,Depth variation,Soft erosion solutions,Weir removal
   
|Floodplain / River corridor=Creation of wetland,Connection to wider floodplain
   
|Planform / Channel pattern=Adding sinuosity,
      Planting,Depth variation,Soft erosion solutions,Weir removal
|Wider stakeholder / citizen engagement=Consultation,Participation in design
|Floodplain / River corridor=
      Creation of wetlands,Connection to wider floodplain
|Planform / Channel pattern=
      Intriduction of sinuousity
|Other technical measure=
     
|Management interventions=
     
|Social measures=
     
|Wider stakeholder / citizen engagement=
      Consultation,Participation in design
}}
}}
{{Hydromorphological_quality_elements_header}}
{{Hydromorphological_quality_elements_header}}
Line 329: Line 190:
{{Monitoring_documents}}
{{Monitoring_documents}}
{{Monitoring_documents_end}}
{{Monitoring_documents_end}}
{{Image_gallery}}
{{Image_gallery_end}}
{{Additional_Documents}}
{{Additional_Documents}}
{{Additional_Documents_end}}
{{Additional_Documents_end}}
Line 337: Line 196:
{{Supplementary_Information
{{Supplementary_Information
|Information=
|Information=
   
 
   
   
   
   
   
   
   
   
   
   
     
}}
}}
{{Case_study_upload}}
{{Case_study_upload}}
{{Toggle content end}}

Latest revision as of 13:24, 1 November 2018

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 50° 48' 39.60" N, 1° 48' 32.40" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Habitat and biodiversity, Monitoring, Water quality
Country England
Main contact forename Jenny
Main contact surname Wheldon
Main contact user ID
Contact organisation Natural England
Contact organisation web site
Partner organisations
This is a parent project
encompassing the following
projects
River Avon at East Chisenbury
Avon at Amesbury, post-restoration works in 2009

Project summary

This case study hasn’t got any project summary, you can add some by editing the project overview.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district South West
River basin Hampshire Avon

Subcatchment

River name Hampshire Avon (Lower)
Area category 1000 - 10000 km²
Area (km2)
Maximum altitude category 100 - 200 m
Maximum altitude (m) 152152 m <br />0.152 km <br />15,200 cm <br />
Dominant geology Calcareous
Ecoregion Great Britain
Dominant land cover Improved grassland
Waterbody ID GB108043015840



Other case studies in this subcatchment: Salisbury Avon Restoration Project, Salmonid, coarse fish and wetland bird habitat and flood plain linkage project, Hampshire Avon, Strategic Framework for Restoration of the River Avon (SFfRRA)


Site

Name River Avon
WFD water body codes GB108043015840
WFD (national) typology
WFD water body name Hampshire Avon (Lower)
Pre-project morphology Single channel, Straight, Embanked
Reference morphology Sinuous, Pool-riffle
Desired post project morphology
Heavily modified water body Yes
National/international site designation EU - Special Area of Conservation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology Quick run-off
Dominant substrate Bedrock
River corridor land use Urban, Extensive agriculture
Average bankfull channel width category 10 - 50 m
Average bankfull channel width (m)
Average bankfull channel depth category 5 - 10 m
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started 2002/12/01
Works started
Works completed
Project completed
Total cost category
Total cost (k€) 1000 k€1,000,000 € <br />
Benefit to cost ratio
Funding sources European Commission, Heritage Lottery Fund (HLF), EU LIFE Programme

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure Reservoir impoundment
Hydromorphology Channel pattern/planform, Width & depth variation, Quantity & dynamics of flow
Biology Fish: Abundance, Invertebrates, Macrophytes
Physico-chemical
Other reasons for the project Bank erosion, Habitat enhancement


Measures

Structural measures
Bank/bed modifications Planting, Depth variation, Soft erosion solutions, Weir removal
Floodplain / River corridor Creation of wetland, Connection to wider floodplain
Planform / Channel pattern Adding sinuosity
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other Consultation, Participation in design


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
[[]]

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Fish: Abundance Yes Yes Awaiting results
Invertebrates Yes Yes Awaiting results
Macrophytes Yes Yes Awaiting results

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
[[]]

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information