Case study:River Roding at Ray Lodge Park: Difference between revisions
(XML import) |
No edit summary |
||
(17 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
{{ | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
|Location= | |Location=51.616508, 0.053221 | ||
}} | |||
{{Project overview | |||
|Status=Complete | |||
|Themes=Habitat and biodiversity, Hydromorphology, Social benefits | |||
|Country=England | |||
|Main contact forename=John | |||
|Main contact surname=Bryden | |||
|Contact organisation=Environment Agency | |||
|Contact organisation url=www.environment-agency.gov.uk | |||
|Multi-site=No | |||
|Project picture=P9020160.JPG | |||
|Picture description=River Roding after the restoration project | |||
|Project summary=After works on a nearby motorway (the M11) in the 1970's ans 1980's, the River Roding was artificially diverted and straightened, resulting in poor quality wildlife habitat. The restoration project looked to address this by creating new habitats for a range of species including water voles, dragonflies and numerous fish species, without a reduction in flood protection. This was achieved through bank re-profiling, backwater creation and planting of the rivers banks. | |||
}} | |||
{{Image gallery}} | |||
{{Case study image | |||
|File name=2007 01 22 (22).JPG | |||
|Caption=River Roding prior to the project | |||
}} | |||
{{Case study image | |||
|File name=2007 11 14 (15).JPG | |||
|Caption=The created backwater | |||
}} | }} | ||
{{ | {{Case study image | ||
| | |File name=P9020159.JPG | ||
|Caption=The backwater after the establishment of vegetation, September 2009 | |||
| | |||
}} | }} | ||
{{ | {{Image_gallery_end}} | ||
|Subcatchment= | {{Toggle button}} | ||
{{Toggle content start}} | |||
{{Case study subcatchment | |||
|Subcatchment=Roding (Cripsey Brook to Loxford Water) | |||
}} | }} | ||
{{Site | {{Site | ||
|Name= | |Name=Ray Lodge Park | ||
|WFD water body code=GB106037028180 | |||
|WFD (national) typology=Intertidal, | |||
|WFD water body name=Roding (Cripsey Brook to Loxford Water) | |||
|WFD water body code= | |Pre-project morphology=Single channel,Impounded,High width:depth | ||
|Reference morphology=Single channel, Sinuous, Pool-riffle, | |||
|WFD (national) typology= | |Heavily modified water body=Yes | ||
|Protected species present=No | |||
|WFD water body name= | |Invasive species present=No | ||
|Dominant hydrology=Quick run-off | |||
|Pre-project morphology= | |Dominant substrate=Bedrock | ||
|River corridor land use=Urban | |||
|Reference morphology= | |Average bankfull channel width category=5 - 10 m | ||
|Average bankfull channel depth category=0.5 - 2 m | |||
|Heavily modified water body= | |Mn discharge=1.85 | ||
|Protected species present= | |||
|Invasive species present= | |||
|Dominant hydrology= | |||
|Dominant substrate= | |||
|River corridor land use= | |||
|Average bankfull channel width category= | |||
|Average bankfull channel depth category= | |||
|Mn discharge= | |||
}} | }} | ||
{{ | {{Project background | ||
|Reach length directly affected= | |Reach length directly affected=150 m | ||
|Project started=2007/08/01 | |||
|Works started=2007/10/01 | |||
|Works completed=2008/01/01 | |||
|Project started= | |Total cost category=100 - 500 k€ | ||
|Total1 cost=175 k€ | |||
|Works started= | |Funding sources=London Borough of Redbridge, Environment Agency | ||
|Investigation and design Lead organisation=Environment Agency | |||
|Works completed= | |Stakeholder engagement Lead organisation=Environment Agency | ||
|Works and supervision Lead organisation=Environment Agency | |||
|Post-project management and maintenance Lead organisation=Environment Agency | |||
|Monitoring Lead organisation=Environment Agency | |||
|Total cost category= | |||
|Total1 cost= | |||
|Funding sources= | |||
|Investigation and design Lead organisation= | |||
|Stakeholder engagement Lead organisation= | |||
|Works and supervision Lead organisation= | |||
|Post-project management and maintenance Lead organisation= | |||
|Monitoring Lead organisation= | |||
}} | }} | ||
{{Motivations | {{Motivations | ||
Line 190: | Line 84: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Removal of revetments,Depth variation,Planting,Re-profiling | ||
|Floodplain / River corridor=Removal of embankments | |||
|Planform / Channel pattern=Creation of backwater,Creation of pond, Adding sinuosity, | |||
|Wider stakeholder / citizen engagement=Participation in maintenance,Consultation,Participation in design | |||
|Floodplain / River corridor= | |||
|Planform / Channel pattern= | |||
|Wider stakeholder / citizen engagement= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} | ||
Line 216: | Line 98: | ||
{{Other_response_table_row | {{Other_response_table_row | ||
|Element= | |Element= | ||
Public Accessibility | Public Accessibility | ||
|Monitored before= | |Monitored before= | ||
Line 242: | Line 116: | ||
{{Monitoring_documents}} | {{Monitoring_documents}} | ||
{{Monitoring_documents_end}} | {{Monitoring_documents_end}} | ||
{{Additional_Documents}} | {{Additional_Documents}} | ||
{{Additional_Documents_end}} | {{Additional_Documents_end}} | ||
{{ | {{Additional links and references header}} | ||
{{Additional links and references | |||
|Link=www.therrc.co.uk/case_studies/roding%20at%20redbridge.pdf | |||
|Description=River Restoration Centre Case Study | |||
}} | |||
{{Additional_links_and_references_footer}} | {{Additional_links_and_references_footer}} | ||
{{Supplementary_Information | {{Supplementary_Information | ||
|Information= | |Information= | ||
}} | }} | ||
{{Case_study_upload}} | {{Case_study_upload}} | ||
{{Toggle content end}} |
Latest revision as of 11:46, 25 November 2020
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Habitat and biodiversity, Hydromorphology, Social benefits |
Country | England |
Main contact forename | John |
Main contact surname | Bryden |
Main contact user ID | |
Contact organisation | Environment Agency |
Contact organisation web site | http://www.environment-agency.gov.uk |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
After works on a nearby motorway (the M11) in the 1970's ans 1980's, the River Roding was artificially diverted and straightened, resulting in poor quality wildlife habitat. The restoration project looked to address this by creating new habitats for a range of species including water voles, dragonflies and numerous fish species, without a reduction in flood protection. This was achieved through bank re-profiling, backwater creation and planting of the rivers banks.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Chigwell Brook, Fresh Wharf, Land opposite Wanstead Park, Valentines Park, Weir upstream of Redbridge roundabout
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|