User:InfoMan: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
mNo edit summary |
||
(57 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{User page|realName=Rogier Vogelij| | {{User page | ||
|realName=Rogier Vogelij | |||
|Hide email link=No | |||
}} | |||
{{#ask:[[Category:Case study]] | |||
|?Country | |||
|format=csv | |||
|offset=0 | |||
|limit=500 | |||
|mainlabel= | |||
|sep=, | |||
}} | |||
{{#ask:[[Category:Case study]] | {{#ask:[[Category:Case study]] | ||
[[Country.RESTORE region::West]] | |||
[[Approval status::Approved]] | [[Approval status::Approved]] | ||
|?Theme | |||
|?Country | |||
|?Location | |||
|?Contact organisation | |||
|?River name | |||
|?Bank and bed modifications measure | |||
|?River basin district | |||
|?Total cost | |||
|format=broadtable | |||
|offset=0 | |||
|limit=20 | |||
|mainlabel= | |||
|class=sortable wikitable smwtable | |||
}} | |||
{{#ask:[[Category:Case study]] | |||
|?Country | |||
|?Reach length affected | |||
|?Works completed | |||
|?Works started | |||
|?Total cost | |||
|?Total cost category | |||
|?Funding source | |||
|?Bank and bed modifications measure | |||
|?River corridor measure | |||
|?Channel pattern measure | |||
|?Other technical measure | |||
|?Management interventions | |||
|?Social measure | |||
|?Wider engagement measure | |||
|?Subcatchment title | |||
|?Monitoring cost | |||
|?Investigation and design cost | |||
|?Stakeholder engagement cost | |||
|?Works and supervision cost | |||
|?Post-project management and maintenance cost | |||
|format=csv | |||
|offset=0 | |||
|limit=500 | |||
|mainlabel= | |||
|sep=, | |||
}} | |||
|? | {{#ask:[[Category:Case study]] | ||
[[Subcatchment::Meuse]] | |||
|?Country | |||
|?Approval status | |?Approval status | ||
|?River basin district | |||
|?River name | |||
|format=broadtable | |format=broadtable | ||
|offset=0 | |offset=0 | ||
Line 13: | Line 71: | ||
|class=sortable wikitable smwtable | |class=sortable wikitable smwtable | ||
}} | }} | ||
{{#ask:[[Category:Case study]] | |||
[[Subcatchment::Meuse]] | |||
|?Country | |||
|?Approval status | |||
|?River basin district | |||
|?River name | |||
|format=broadtable | |||
|offset=0 | |||
|limit=20 | |||
|mainlabel= | |||
|class=sortable wikitable smwtable | |||
}} | |||
==Data quality report CSV== | |||
{{#ask:[[Category:Case study]] | |||
|?Country | |||
|?Approval status | |||
|?River basin district | |||
|?River name | |||
|?Theme | |||
|?Hydromorphological quality motivation | |||
|?Biological quality motivation | |||
|?Physico-chemical quality motivation | |||
|?Other motivation | |||
|?Bank and bed modifications measure | |||
|?River corridor measure | |||
|?Channel pattern measure | |||
|?Other technical measure | |||
|?Management interventions | |||
|?Social measure | |||
|?Wider engagement measure | |||
|format=csv | |||
|offset=0 | |||
|mainlabel= | |||
|sep=, | |||
}} | |||
==contact user id== | |||
{{#ask:[[Category:Case study]] | |||
|?Main contact ID | |||
|?Main contact forename | |||
|?Main contact surname | |||
|format=broadtable | |||
|offset=0 | |||
|limit=20 | |||
|mainlabel= | |||
|class=sortable wikitable smwtable | |||
}} | |||
==Approved case studies== | |||
{{#ask:[[Category:Case study]] | |||
[[Country.RESTORE region::East]] | |||
[[Approval status::Approved]] | |||
|?Approval status | |||
|format=broadtable | |||
|offset=0 | |||
|limit=20 | |||
|mainlabel= | |||
|class=sortable wikitable smwtable | |||
}} | |||
==Data quality check== | ==Data quality check== | ||
===Check for empty fields=== | ===Check for empty fields=== | ||
{{#ask:[[Category:Case study]] | {{#ask:[[Category:Case study]] | ||
[[Country.RESTORE region::East]] | [[Country.RESTORE region::East]] | ||
[[Approval status::Approved]] | |||
|?Theme | |?Theme | ||
|?Country | |||
|?Location | |?Location | ||
|?Contact organisation | |?Contact organisation | ||
Line 29: | Line 154: | ||
|format=broadtable | |format=broadtable | ||
|offset=0 | |offset=0 | ||
|limit= | |limit=20 | ||
|mainlabel= | |||
|class=sortable wikitable smwtable | |||
}} | |||
=== check for coverage on start/end dates, themes and measures=== | |||
{{#ask:[[Category:Case study]] | |||
|?Project started | |||
|?Project completed | |||
|?Bank and bed modifications measure | |||
|?River corridor measure | |||
|?Channel pattern measure | |||
|?Other technical measure | |||
|?Management interventions | |||
|?Social measure | |||
|?Wider engagement measure | |||
|?Theme | |||
|?Biological quality element monitored | |||
|?Hydromorphological quality element monitored | |||
|?Physico-chemical quality element monitored | |||
|?Other response monitored | |||
|format=broadtable | |||
|offset=0 | |||
|limit=20 | |||
|mainlabel= | |mainlabel= | ||
|class=sortable wikitable smwtable | |class=sortable wikitable smwtable | ||
}} | }} | ||
===Case study overview:=== | ===Case study overview:=== | ||
Line 43: | Line 190: | ||
{{#ask:[[Category:Case study]] | {{#ask:[[Category:Case study]] | ||
[[Country.RESTORE region::East]] | [[Country.RESTORE region::East]] | ||
|?Country | |?Country | ||
|?River basin district | |?River basin district | ||
|format=broadtable | |format=broadtable | ||
|offset=0 | |offset=0 | ||
|limit= | |limit=20 | ||
|mainlabel=- | |mainlabel=- | ||
|class=sortable wikitable smwtable | |class=sortable wikitable smwtable | ||
Line 55: | Line 201: | ||
====# of case studies per theme and reason for restoration==== | ====# of case studies per theme and reason for restoration==== | ||
{{#ask:[[Category:Case study]] | {{#ask:[[Category:Case study]] | ||
[[Country.RESTORE region:: | [[Country.RESTORE region::West]] | ||
|?Theme | |?Theme | ||
|?Hydromorphological quality motivation | |?Hydromorphological quality motivation | ||
Line 73: | Line 217: | ||
{{#ask:[[Category:Case study]] | {{#ask:[[Category:Case study]] | ||
[[Country.RESTORE region::East]] | [[Country.RESTORE region::East]] | ||
|?Bank and bed modifications measure | |?Bank and bed modifications measure | ||
|?River corridor measure | |?River corridor measure | ||
Line 95: | Line 237: | ||
{{#ask:[[Category:Case study]] | {{#ask:[[Category:Case study]] | ||
|?Country | |?Country | ||
|?Hydromorphological quality element monitored | |?Hydromorphological quality element monitored |
Latest revision as of 14:34, 22 August 2014
This is the user page for Rogier Vogelij.
Actions:
Theme | Country | Location | Contact organisation | River name | Bank and bed modifications measure | River basin district | Total cost | |
---|---|---|---|---|---|---|---|---|
2e Lower Woodsford River and Floodplain Enhancement | Fisheries Flood risk management Habitat and biodiversity Hydromorphology Land use management - agriculture Land use management - forestry Monitoring | England | 50° 43' 12.17" N, 2° 18' 50.69" W | Environment Agency Forestry Commission Woodland Trust Dorset Wildlife Trust | Frome Dorset (Lower) & Furzebrook Stream | Removal of revetments | South West | |
3Rivers - Lumburn:Walkham:Tavy | Water quality | England | 50° 31' 45.52" N, 4° 9' 38.87" W | Westcountry Rivers Trust Devon Wildlife Trust South West Water Tamar Valley AONB Tavy Walkham and Plym Fishing Club | Lower River Tavy | South West | ||
Aaijen- Removal of bank fixation | Flood risk management Monitoring Water quality | Netherlands | 51° 34' 51.60" N, 6° 2' 25.80" E | Rijkswaterstaat Waterdienst | Meuse | Removal of bank reinforcements | Meuse | 74 k€74,000 € <br /> |
Abaissement et démantèlement de trois clapets sur l’Orge aval | Environmental flows and water resources Habitat and biodiversity Hydromorphology Water quality Urban | France | 48° 37' 57.50" N, 2° 18' 46.38" E | Syndicat de l’Orge Direction régionale et interdépartementale de l’environnement et de l’energie (DRIEE) Office national de l’eau et des milieux aquatiques (Onema). | Lowering of checking valves Removal of checking valves Water supply channel lowering | 360 k€360,000 € <br /> | ||
Abbey Brook Weir | Fisheries Habitat and biodiversity Hydropower | Wales | 52° 59' 13.60" N, 3° 11' 11.70" W | Welsh Dee Trust | Eglwyseg | Rock ramp construction Creation of fish passes | Dee | |
Abbotts Hall Managed Realignment Scheme | Flood risk management Habitat and biodiversity | England | 51° 47' 5.40" N, 0° 50' 51.59" E | Essex Wildlife Trust English Nature Environment Agency | Anglian | |||
Adams Mill enhancements | Fisheries Hydromorphology | England | 52° 5' 51.58" N, 0° 45' 14.71" W | Environment Agency Milton Keynes Angling Association Woodland Trust | Ouse (Cosgrove to Newport Pagnell) | Bank stabilisation | Anglian | |
Adaptive management of hydraulic structures in the Sèvre nantaise and Thouet basins | France | 47° 35' 16.84" N, 2° 39' 47.11" W | Institution Interdepartmentale du bassin de la Sèvre Nantaise | |||||
Adare Fish Counter | Fisheries Social benefits | Ireland | 52° 39' 41.63" N, 8° 48' 20.72" W | IFI | ||||
Afon Merin Natural Process Restoration | Environmental flows and water resources Fisheries Flood risk management Habitat and biodiversity Hydromorphology Land use management - forestry Monitoring Water quality | Wales | 52° 23' 56.58" N, 3° 46' 27.57" W | Natural Resources Wales | Mynach - headwaters to confluence with Rheidol | 15 leaky dams and scrapes. | Western Wales | 30,000 k€30,000,000 € <br /> |
Agreed definition of mobility area for the Adour | France | 43° 39' 8.51" N, 0° 0' 51.13" W | Institution Adour | L'Adour | Removal of bank reinforcements | Hautes-Pyrénées et Ger | 3,733 k€3,733,000 € <br /> | |
Albany Park | Environmental flows and water resources Fisheries Flood risk management Habitat and biodiversity Hydromorphology Social benefits Spatial planning Urban | England | 51° 40' 5.85" N, 0° 1' 59.94" W | Environment Agency London Borough of Enfield | Cuffley Brook and Turkey Brook | Creation of berms Creation of backwaters | Thames | |
Alkborough tidal defence scheme | Flood risk management Social benefits | England | 53° 42' 2.78" N, 0° 41' 31.70" W | Environment Agency Natural England Associated British Ports North Lincolnshire Council Defra Yorkshire Forward Heritage Lottery Fund European Union (EU) | Skitter Bk / E Halton Bk from Ulceby Skitter to Humber Estuary | Humber | ||
Allt Lorgy River Restoration | Flood risk management Habitat and biodiversity Hydromorphology Monitoring | Scotland | 57° 16' 18.18" N, 3° 50' 33.26" W | Spey Catchment Initiative Spey Fishery Board Cairngorms National Park Authority Scottish Natural Heritage SEPA | River Avon | Removal of in stream boulders and replacement with wood structures Additional strategic wood structures introduced Graded extracted gravel to be used for sediment reintroduction Embankment lowering | Scotland RBD | |
Alma Road Rain Gardens | Environmental flows and water resources Flood risk management Habitat and biodiversity Social benefits Water quality Urban | England | 51° 38' 47.70" N, 0° 2' 3.53" W | London Borough of Enfield Thames 21 Greater London Authority | Salmons Brook | Thames | ||
Amerongse Bovenpolder | Habitat and biodiversity Social benefits | Netherlands | 51° 59' 26.69" N, 5° 27' 46.93" E | Dienst Landelijk Gebied Rijkswaterstaat Utrechts Landschap Staatsbosbeheer | Rhine | Rhine | ||
Aménagement du plan d’eau de la Sangsue et création d’un bras de contournement du Woigot | Flood risk management Habitat and biodiversity Hydromorphology Social benefits | France | 49° 14' 54.48" N, 5° 56' 12.04" E | Syndicat CRW Commune de Briey Onema AERM communauté de communes du pays de Briey commune de Briey Fédération de pêche 54 | Construction of a bypass channel Dam removal Creation of fish passes Creation of lateral dike to regulate flows Application of plant-engineering Riparian planting | 5,372 k€5,372,000 € <br /> | ||
Anton Crescent Wetlands Regeneration | Habitat and biodiversity Social benefits Urban | England | 51° 22' 23.01" N, 0° 12' 8.64" W | Environment Agency Sutton Ecology Centre London Borough of Sutton Natural England | Beverley Brook (Motspur Park to Thames) and Pyl Brook at West Barnes | Thames | 12 k€12,000 € <br /> | |
Arasement du seuil des Treize Saules sur la Quilienne | Flood risk management Habitat and biodiversity Hydromorphology Land use management - agriculture | France | 50° 9' 14.58" N, 2° 29' 25.30" E | e Fédération départementale du Pas-de-Calais pour la pêche et la protection du milieu aquatique Office national de l’eau et des Milieux Aquatiques – service départemental du Pas-de-Calais (SD 62) association agréée pour la pêche et la protection du milieu aquatique (AAPPMA) de Pas-en-Artois | Barrier removal Planting of hydrophytes Bank reprofiling | 17 k€17,000 € <br /> | ||
Arasement du vannage du moulin de Réveillon et réaménagement du lit mineur de la Blaise | Habitat and biodiversity Spatial planning Water quality | France | 48° 44' 10.08" N, 1° 22' 15.20" E | Syndicat intercommunal de la vallée de la Blaise (SIVB) Office national de l’eau et des milieux aquatiques (Onema) - Service départemental Fédération départementale de la pêche Cellule d’animation technique pour l’eau et les rivières (CATER) Direction départementale de l’agriculture et de la forêt. | Dismantling of the mill Leveling threshold with the water level Helophytes planted Bank stabilisation Installation of geotextile | 142 k€142,000 € <br /> | ||
... further results |
Data quality report CSV
contact user id
Approved case studies
Data quality check
Check for empty fields
Theme | Country | Location | Contact organisation | Contact organisation url | River name | |
---|---|---|---|---|---|---|
Conservation of alluvial | Habitat and biodiversity | Hungary | 46° 1' 23.16" N, 18° 41' 22.16" E | WWF Hungary, Danube Drava National Park Directorate Municipality of Mohacs Town Transdanubian Regional Waterworks Corporation Lower-Danube-valley Water Directorate Coca-Cola HBC Hungary Cargill | http://www.ddnp.hu/index.php?lang=en | Sava River |
ERCIP - European River Corridor Improvement Plans | Economic aspects Flood risk management Habitat and biodiversity Hydropower Land use management - forestry Social benefits Spatial planning Water quality | Italy Germany Greece Romania England | 51° 27' 16.35" N, 0° 1' 8.60" W | ERCIP / London Borough of Lewisham Erftverband Rhein-Erft-Kreis Municipality of Teramo Province of Teramo Romanian Institute of Geology Town of Harsova Region of Western Macedonia Town of Servia-Velvento | http://www.lewisham.gov.uk/mayorandcouncil/aboutthecouncil/eu-funding/Pages/default.aspx | Ravensbourne |
Ecological Restoration of Mata-Radeanu Complex | Habitat and biodiversity | Romania | 46° 5' 26.55" N, 28° 5' 51.89" E | Prut - Barlad River Basin Authority University of Bucharest – Centre for Environmental Research and Impact Studies Romania; Romanian Ornithological Society Romania; Galaţi Forestry District Romania | http://www.rowater.ro/daprut/default.aspx | Prut |
Ecological Restoration of Natural Lake Pochina | Habitat and biodiversity | Romania | 45° 59' 29.63" N, 28° 5' 46.38" E | Prut - Barlad River Basin Authority University of Bucharest – Centre for Environmental Research and Impact Studies Romania; Romanian Ornithological Society Romania; Galaţi Forestry District Romania | http://www.rowater.ro/daprut/default.aspx | Prut |
Ecological Restoration of Vlascuta Lake | Habitat and biodiversity | Romania | 45° 46' 39.38" N, 28° 8' 50.41" E | Prut - Barlad River Basin Authority University of Bucharest – Centre for Environmental Research and Impact Studies University of Bucharest – Centre for Environmental Research and Impact Studies; Romania Romanian Ornithological Society; Galaţi Forestry District | http://www.rowater.ro/daprut/default.aspx | Prut |
Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 1 | Habitat and biodiversity | Romania | 44° 52' 0.00" N, 29° 15' 0.00" E | Danube Delta National Institute for Research and Development, Tulcea | http://www.ddni.ro | Sf. Gheorghe Branch |
Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 2 | Habitat and biodiversity | Romania | 44° 52' 0.00" N, 29° 15' 0.00" E | Danube Delta National Institute for Research and Development, Tulcea | http://www.ddni.ro | Sf. Gheorghe Branch |
Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 3 | Habitat and biodiversity | Romania | 44° 57' 38.41" N, 29° 27' 53.34" E | Danube Delta National Institute for Research and Development, Tulcea | http://www.ddni.ro | Sf. Gheorghe Branch |
Habitat and water flow restoration on River Rábca | Flood risk management Habitat and biodiversity Hydromorphology | Hungary | 47° 26' 2.25" N, 17° 0' 55.40" E | North-Transdanubian Water Management Directorate | http://www.edukovizig.hu/ | River Rábca (Rabnitz) |
Improving the structure of the Lahn-patak in Hungary | Habitat and biodiversity | Hungary | 46° 58' 22.21" N, 16° 20' 39.24" E | West-Transdanubian Water Management Directorate vezetes@nyuduvizig.hu, Weideverein Ramsargebiet Lafnitztal info.zentrum.lafnitztal@gmx.at | http://www.nyuduvizig.hu/ | Láhn brook |
Marsh protection in Egyek–Pusztakócs | Environmental flows and water resources Habitat and biodiversity Land use management - agriculture | Hungary | 47° 37' 20.50" N, 20° 56' 56.52" E | GWP Eastern Europe | http://https://www.gwp.org/en/GWP-CEE/ | Sava River |
Matasaru Area - A new life on the river Arges | Habitat and biodiversity | Romania | 44° 38' 13.50" N, 25° 26' 56.76" E | WWF Danube Carpathian Programme Romania Lafarge | http://www.wwf.ro | Arges |
Rehabilitation of Benta stream | Flood risk management Habitat and biodiversity | Hungary | 47° 19' 14.63" N, 18° 55' 28.63" E | Middle-Danube-Valley Water Management Directorate | Benta stream | |
Remediation and revitalization of Séd-Nádor stream | Habitat and biodiversity Water quality | Hungary | 47° 6' 27.73" N, 18° 3' 28.29" E | Séd-Nádor 2009 Consortium | Séd-Nádor stream (Sárvíz) | |
Restoration and conservation of riparian forests - habitats of European conservation importance on the territory of Dimitrovgrad municipality | Habitat and biodiversity | Bulgaria | 42° 3' 52.36" N, 25° 38' 18.58" E | Dimitrovgrad municipality | http://www.dimitrovgrad.bg/ | Maritsa |
Restoration and conservation of the protected site "Lozenski pat" - wetland | Habitat and biodiversity | Bulgaria | 41° 45' 41.17" N, 26° 10' 16.56" E | Svilengrad municipality | http://www.svilengrad.bg/ | Maritsa |
Restoration of Rusenski Lom River near Ivanovo | Hydromorphology | Bulgaria | 43° 41' 54.13" N, 25° 58' 47.08" E | WWF Danube Carpathian programme Bulgaria | http://www.wwf.bg | Rusenski Lom |
Restoration of Szárazerdei river branch | Habitat and biodiversity | Hungary | 47° 58' 30.59" N, 17° 17' 56.18" E | North-Transdanubian Water Management Directorate titkarsag@edukovizig.hu | Sziget-köz | |
Restoration of Vesselina River | Hydromorphology | Bulgaria | 43° 1' 48.51" N, 25° 49' 33.96" E | WWF Danube Carpathian programme Bulgaria | http://www.wwf.bg | Vesselina |
Restoration, protection and sustainable development of protected area "Zlato pole" | Habitat and biodiversity | Bulgaria | 42° 1' 53.03" N, 25° 43' 17.61" E | Dimitrovgrad municipality | http://www.dimitrovgrad.bg/ | Maritsa |
... further results |
check for coverage on start/end dates, themes and measures
Project started | Project completed | Bank and bed modifications measure | River corridor measure | Channel pattern measure | Other technical measure | Management interventions | Social measure | Wider engagement measure | Theme | Biological quality element monitored | Hydromorphological quality element monitored | Physico-chemical quality element monitored | Other response monitored | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
"Rio Verde II". Restoration of riparian forest and the rivers Llobregat and Cardener | 1 January 2006 | Revetmens with local species Bank stabilisation New bioengineering elements in order to stabilize slope banks | Riparian planting | Environmental flows and water resources Habitat and biodiversity Hydromorphology | ||||||||||
't Merkske | Environmental flows and water resources Habitat and biodiversity Hydromorphology Monitoring Water quality | |||||||||||||
2e Lower Woodsford River and Floodplain Enhancement | 1 January 2012 | 1 January 2014 | Removal of revetments | Tree planting Lowering of embankments | Re-profiled ditch | Community involvement Engagement with schools | Raised interest in future projects | Fisheries Flood risk management Habitat and biodiversity Hydromorphology Land use management - agriculture Land use management - forestry Monitoring | ||||||
3Rivers - Lumburn:Walkham:Tavy | floodplain woodland planting | Land management | Volunteer engagement | Survey work | Water quality | |||||||||
Aaijen- Removal of bank fixation | 1 January 2005 | Removal of bank reinforcements | Flood risk management Monitoring Water quality | Macrophytes Invertebrates: Taxonomic composition Invertebrates: Abundance | Continuity for organisms | |||||||||
Abaissement et démantèlement de trois clapets sur l’Orge aval | 1 March 2010 | 30 September 2012 | Lowering of checking valves Removal of checking valves Water supply channel lowering | Environmental flows and water resources Habitat and biodiversity Hydromorphology Water quality Urban | ||||||||||
Abbey Brook Weir | 1 August 2011 | 1 November 2011 | Rock ramp construction Creation of fish passes | Fisheries Habitat and biodiversity Hydropower | ||||||||||
Abbots Worthy Restoration Project | 1 April 2018 | Flood risk management Habitat and biodiversity | ||||||||||||
Abbotts Hall Managed Realignment Scheme | Flood risk management Habitat and biodiversity | Invertebrates Macrophytes Fish | Flow velocities | Salinity | ||||||||||
Actions for environmental regeneration and flow control in Odra's Basin, Burgos | 1 January 2009 | Revetmens with local species Removal of sediment Bank reprofiling | Removal of rubbish | Environmental flows and water resources Habitat and biodiversity Hydromorphology | ||||||||||
Adams Mill enhancements | 1 September 2014 | Bank stabilisation | Increase in-channel hydromorphological diversity | Fisheries Hydromorphology | Fish | Substrate conditions Quantity & dynamics of flow | Habitat mapping | |||||||
Adaptive management of hydraulic structures in the Sèvre nantaise and Thouet basins | 1 January 2004 | Weir partial removal or permanent opening of gates allowing self restoration of previously impunded stretches | More natural reservoir releases | Information provision Consultation Participation in works River contract | Social representation of the river | |||||||||
Adare Fish Counter | Creation of fish passes | Fisheries Social benefits | ||||||||||||
Aesthetic vs. functional restoration of urban and peri-urban rivers: the Manzanares River in Madrid | 1 January 2017 | Creation of ramp | Reforestation and restoration of watercourses Develop riparian forest Riparian planting | Awareness raising by a sign | Environmental flows and water resources Habitat and biodiversity Hydromorphology Land use management - forestry Social benefits Urban | |||||||||
Afon Clywdd | Runoff pathway management | Flood risk management Habitat and biodiversity Land use management - agriculture Land use management - forestry Water quality | ||||||||||||
Afon Merin Natural Process Restoration | 1 February 2018 | 15 leaky dams and scrapes. | Environmental flows and water resources Fisheries Flood risk management Habitat and biodiversity Hydromorphology Land use management - forestry Monitoring Water quality | |||||||||||
Agreed definition of mobility area for the Adour | 1 January 2005 | Removal of bank reinforcements | Develop riparian forest | Definition of erodble corridor | Consultation | Channel pattern/planform | ||||||||
Albany Park | 4 January 2016 | Creation of berms Creation of backwaters | River naturalisation Reedbed creation Scrapes Fish habitat restoration | Recreation | Environmental flows and water resources Fisheries Flood risk management Habitat and biodiversity Hydromorphology Social benefits Spatial planning Urban | |||||||||
Albbruck-Dogern (bypass and nature-like pool pass) | 1 January 2008 | 1 July 2012 | Creation of fish ladders | Creation of side channel | Economic aspects Fisheries Hydropower | |||||||||
Alkborough tidal defence scheme | 2005 | Salt marsh and mudflat restoration | Flood risk management Social benefits | Invertebrates | ||||||||||
... further results |
Case study overview:
# of case studies per country and catchment
(replace East by your region in the 2nd row: "Country.RESTORE region:: East")
Country | River basin district |
---|---|
Hungary | Danube |
Italy Germany Greece Romania England | Thames |
Romania | Danube |
Romania | Danube |
Romania | Danube |
Romania | Danube |
Romania | Danube |
Romania | Danube |
Hungary | Danube River Basin District |
Hungary | Danube River Basin District |
Hungary | Danube |
Romania | Danube |
Hungary | Danube |
Hungary | Danube |
Bulgaria | East Aegean |
Bulgaria | East Aegean |
Bulgaria | Danube |
Hungary | Danube River Basin District |
Bulgaria | Danube |
Bulgaria | East Aegean |
... further results |
# of case studies per theme and reason for restoration
# of case studies per measure
Bank and bed modifications measure | River corridor measure | Channel pattern measure | Other technical measure | Management interventions | Social measure | Wider engagement measure | |
---|---|---|---|---|---|---|---|
Conservation of alluvial | Dredging Removal of rock-fill weir Relocation of the drinking water pipes | Control of invasive species | Protection of the island Ensuring biodiversity | Recreation Improvement of drinking water quality Land purchase | Information provision Consultation Participation in works | ||
ERCIP - European River Corridor Improvement Plans | |||||||
Ecological Restoration of Mata-Radeanu Complex | Improvement of natural flows | Information provision | |||||
Ecological Restoration of Natural Lake Pochina | Morphological diversification Channel reprofiling | Information provision | |||||
Ecological Restoration of Vlascuta Lake | Removal of sediment | Information provision | |||||
Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 1 | Canals to improve the hydrologic regime | Improved public access | Participation in design | ||||
Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 2 | Canals to improve the hydrologic regime | Improved public access | Participation in monitoring | ||||
Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 3 | Canals to improve the hydrologic regime | Improved public access | Information provision | ||||
Habitat and water flow restoration on River Rábca | Removal of reed Removal of small bars Weir removal | Riparian planting | Removal of fallen trees | Ensuring biodiversity | |||
Improving the structure of the Lahn-patak in Hungary | Reduction of bank slope Deflectors Planting Creation of fish ladders Depth variation | Creation of a lake | Re-instatement of old course Adding sinuosity Creation of meanders | Ensuring biodiversity | Landscape Improved public access | Information provision Consultation | |
Marsh protection in Egyek–Pusztakócs | Restoration of riparian marshes Restored species-rich wet grasslands | ||||||
Matasaru Area - A new life on the river Arges | |||||||
Rehabilitation of Benta stream | Renewal of reventments Removal of sediment Planting Creation of fish spawn nursing places Creation of pipelines | Reparation of sluice gates | channel maintenance | Floodprotection landenhancement | Information provision | ||
Remediation and revitalization of Séd-Nádor stream | Creation of gravel banks Removal of sediment Planting Creation of fish spawn nursing places | Adding sinuosity | Reduced pollution | Information provision Consultation | |||
Restoration and conservation of riparian forests - habitats of European conservation importance on the territory of Dimitrovgrad municipality | Aforestation | ||||||
Restoration and conservation of the protected site "Lozenski pat" - wetland | |||||||
Restoration of Rusenski Lom River near Ivanovo | |||||||
Restoration of Szárazerdei river branch | Ensuring biodiversity | ||||||
Restoration of Vesselina River | |||||||
Restoration, protection and sustainable development of protected area "Zlato pole" | Aforestation Weir construction | Creation of wetland | |||||
... further results |
# of case studies per monitored quality element
(adjust limit to 500)