Case study:Friends of Bottesford Beck: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
 
(5 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Case study status
{{Case study status
|Approval status=Draft
|Approval status=Approved
}}
}}
{{Location
{{Location
Line 36: Line 36:
}}
}}
{{Project background
{{Project background
|Total1 cost=74,000
|Project started=2017/01/24
|Total1 cost=82,099
}}
{{Motivations
|Other motivation=Landscape enhancement,
}}
{{Measures
|Bank and bed modifications measure=Riverbed restoration,
|Floodplain / River corridor=Planting, Creation of pond,
|Other technical measure=Removal of rubbish, Rain gardens,
|Social measures=Improved public access, Creation of a path alongside the river,
}}
}}
{{Motivations}}
{{Measures}}
{{Hydromorphological quality elements header}}
{{Hydromorphological quality elements header}}
{{End table}}
{{End table}}

Latest revision as of 09:37, 3 January 2019

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 53° 32' 52.15" N, 0° 38' 58.89" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status In progress
Project web site http://www.therrc.co.uk/sites/default/files/files/riverwiki/friends_of_bottesford_beck.pdf
Themes Flood risk management, Habitat and biodiversity, Social benefits, Water quality
Country England
Main contact forename Hilary
Main contact surname Strong
Main contact user ID User:Hilary Strong
Contact organisation Friends of Bottesford Beck
Contact organisation web site
Partner organisations Defra, Environment Agency, North Lincolnshire Council
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Project picture

Project summary

Edit project overview to modify the project summary.


The Bottesford Beck Linear Park Bridleway project is situated on the southern edge of Scunthorpe. The project was awarded £74,000 to create approximately 3.3 km of new bridleway running alongside Bottesford Beck and 1.5 km of new footpath circling the lake in the newly designated Ashbyville Local Nature Reserve. The project was delivered by a close partnership between North Lincolnshire Council and Friends of the Beck action group. Friends of the Beck are a strongly motivated volunteer group who work closely with the Council and Environment Agency to improve the environment around Bottesford Beck including cleaning out the riverbed, planting bulbs, clearing litter and developing flood protection through the building of rain gardens and ponds. Better public access to the Beck and its green space has been a long term goal of the Friends whose members have worked tirelessly to make the project happen. The new bridleway will form a link in the newly developed Ironstone Way long distance footpath and is a strategic addition to the Rights of Way network in Scunthorpe. Already it is becoming well used by walkers, riders and cyclists wishing to enjoy the tranquillity of this newly accessible green space on the edge of the town. This is a triumphant result for the hard work of the Friends of the Beck whose vision was to create Bottesford Beck Linear Park with the new Right of Way as its centrepiece.

Visit the Friends of Bottesford Beck Facebook page - https://www.facebook.com/Friends-of-Bottesford-Beck-2014893835451680/

Beck Lane website: Discover Bottesford Beck - http://www.becklane.co.uk/site/

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name Bottesford Beck
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started 2017/01/24
Works started
Works completed
Project completed
Total cost category
Total cost (k€) 82,09982,099 k€ <br />82,099,000 € <br />
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project Landscape enhancement


Measures

Structural measures
Bank/bed modifications Riverbed restoration
Floodplain / River corridor Planting, Creation of pond
Planform / Channel pattern
Other Removal of rubbish, Rain gardens
Non-structural measures
Management interventions
Social measures (incl. engagement) Improved public access, Creation of a path alongside the river
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information