Case study:Holmsley Inclosure Stream Restoration: Difference between revisions
Hazel Wilson (talk | contribs) No edit summary |
No edit summary |
||
(2 intermediate revisions by 2 users not shown) | |||
Line 30: | Line 30: | ||
|Name=Holmsley Inclosure Stream | |Name=Holmsley Inclosure Stream | ||
|WFD water body code=GB107042011300 | |WFD water body code=GB107042011300 | ||
|WFD water body name=Avon Water | |||
|Heavily modified water body=No | |Heavily modified water body=No | ||
|Protected species present=No | |Protected species present=No | ||
Line 38: | Line 39: | ||
|Project completed=2006/12/31 | |Project completed=2006/12/31 | ||
|Total cost category=50 - 100 k€ | |Total cost category=50 - 100 k€ | ||
|Funding sources=EU | |Funding sources=EU LIFE Programme, | ||
}} | }} | ||
{{Motivations | {{Motivations | ||
Line 44: | Line 45: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure=Bed raising, Tree | |Bank and bed modifications measure=Bed raising, Tree management, | ||
}} | }} | ||
{{Hydromorphological quality elements header}} | {{Hydromorphological quality elements header}} |
Latest revision as of 13:13, 1 November 2018
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Environmental flows and water resources, Habitat and biodiversity, Hydromorphology, Monitoring |
Country | England |
Main contact forename | Bryan |
Main contact surname | Boult |
Main contact user ID | |
Contact organisation | Hampshire County Council |
Contact organisation web site | http://www.hants.gov.uk/ |
Partner organisations | English Nature, Environment Agency, Forestry Commission, National Trust, RSPB |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
This site is a part of New Forest LIFE project. The bed levels were raised for approximately 500m of the existing Stony Moors stream between the enclosure boundary and the fords on the public road. Levels were raised to within 0.4m of the surrounding floodplain to restore winter flooding on the flood plain. This was achieved using clay plugs and backfilling with imported hoggin and available bank spoil. Due to the steep gradient additional support was given to the infill in the form of log weirs, oak boards and live willow. Alongside the river bed restoration 8.8 hectares of scrub management and vegetation clearance was made.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Avon Barriers Project, Avon Barriers Project: Ferengair Weir, HLS New Forest
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and referencesSupplementary InformationEdit Supplementary Information
|