Case study:Hogsmill River Connectivity Project: Difference between revisions
No edit summary |
No edit summary |
||
(5 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
{{ | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
Line 13: | Line 6: | ||
}} | }} | ||
{{Project overview | {{Project overview | ||
|Status= | |Status=Complete | ||
|Project web site url=www.wandletrust.org/?p=4800 | |||
|Themes=Environmental flows and water resources, Fisheries, Flood risk management, Social benefits | |Themes=Environmental flows and water resources, Fisheries, Flood risk management, Social benefits | ||
|Country=England | |Country=England | ||
Line 19: | Line 13: | ||
|Main contact surname=Davies | |Main contact surname=Davies | ||
|Contact organisation=Wandle Trust | |Contact organisation=Wandle Trust | ||
|Contact organisation url=www.wandletrust.org/?page_id=20 | |||
|Multi-site=No | |Multi-site=No | ||
|Project summary=The overall aims of the project are:<br>1) To resolve fish passage and associated connectivity issues, and thus improve the WFD fish status of the Hogsmill River, by the removal or modification of a series of weirs/culverts which currently seriously impede or completely prevent upstream fish movement.<br>2) To improve in-stream habitat in two significant stretches of the Hogsmill River, which flow respectively through the Kingston University and the Hogsmill Sewage Treatment works, and thus improve the WFD fish status of the Hogsmill River. | |Project summary=The overall aims of the project are:<br>1) To resolve fish passage and associated connectivity issues, and thus improve the WFD fish status of the Hogsmill River, by the removal or modification of a series of weirs/culverts which currently seriously impede or completely prevent upstream fish movement.<br>2) To improve in-stream habitat in two significant stretches of the Hogsmill River, which flow respectively through the Kingston University and the Hogsmill Sewage Treatment works, and thus improve the WFD fish status of the Hogsmill River. | ||
|Lessons learn=Challenges: | |||
-Access to site with machinery. | |||
}} | }} | ||
{{Image_gallery}} | {{Image_gallery}} | ||
Line 30: | Line 27: | ||
}} | }} | ||
{{Site | {{Site | ||
|WFD water body code=GB106039017440 | |||
|WFD water body name=Hogsmill | |||
|Heavily modified water body=No | |||
|Protected species present=No | |||
|WFD water body code= | |Invasive species present=No | ||
|WFD water body name= | |||
|Heavily modified water body= | |||
|Protected species present= | |||
|Invasive species present= | |||
}} | }} | ||
{{Project background | {{Project background | ||
Line 101: | Line 55: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Weir removal, Deculverting, Weir modification, | ||
|Social measures=Community involvement | |||
|Social measures= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} |
Latest revision as of 08:13, 1 June 2017
Project overview
Status | Complete |
---|---|
Project web site | http://www.wandletrust.org/?p=4800 |
Themes | Environmental flows and water resources, Fisheries, Flood risk management, Social benefits |
Country | England |
Main contact forename | Bella |
Main contact surname | Davies |
Main contact user ID | |
Contact organisation | Wandle Trust |
Contact organisation web site | http://www.wandletrust.org/?page id=20 |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The overall aims of the project are:
1) To resolve fish passage and associated connectivity issues, and thus improve the WFD fish status of the Hogsmill River, by the removal or modification of a series of weirs/culverts which currently seriously impede or completely prevent upstream fish movement.
2) To improve in-stream habitat in two significant stretches of the Hogsmill River, which flow respectively through the Kingston University and the Hogsmill Sewage Treatment works, and thus improve the WFD fish status of the Hogsmill River.
Monitoring surveys and results
Lessons learnt
Challenges:
-Access to site with machinery.
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Bonesgate Phase 2, Elmbridge Meadows, Hogsmill Sewage Treatment Works phase 1, Moor Lane Allotments, River Hogsmill Restoration Project, Three Bridge, Kingston
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|