Case study:Little Waltham Meadows Back Channel creation: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
 
(16 intermediate revisions by 3 users not shown)
Line 14: Line 14:
|Contact organisation=Essex Wildlife Trust
|Contact organisation=Essex Wildlife Trust
|Contact organisation url=www.essexwt.org.uk
|Contact organisation url=www.essexwt.org.uk
|Partner organisations=Essex and Suffolk Water (Northumbrian Water), Chelmer and Blackwater Catchment Partnership, Natural England, Environment Agency, Chelmer and Blackwater Navigation (Essex Waterways Ltd), Parish Councils and the Rural Communities Council for Essex, Landowners and farmers, Rivers Trust, Essex County Council, Essex Farming and Wildlife Advisory Group
|Multi-site=No
|Multi-site=No
|Project picture=Back channel at LW.jpg
|Project picture=Back channel at LW.jpg
|Project summary=This is a multi-pronged project aimed at improving in channel morphological diversity, reducing diffuse pollution and sedimentation entering the main river Chelmer and Provide improvements to the riparian habitats and enhance the resilience of the wet woodland.  
|Project summary=This is a multi-benefit project aimed at improving in channel morphological diversity, reducing the amount of diffuse pollution and sedimentation entering the main river Chelmer. It will also increase the amount of riparian habitat along the River Chelmer and enhance the resilience of the wet woodland.  


Funded by the Catchment restoration fund, as part of the Essex Healthy headwaters scheme, the earthworks will take place in late Summer, early Autumn 2014.  
This project was funded by the Catchment restoration fund, as part of the Essex Healthy headwaters scheme. The earthworks were undertaken in late Summer, early Autumn 2014.  


This aims of the project will be achieved by creating a new 280 backwater channel to provide refuges for fish and Macrophytes during high flow events. This will also enhance habitat variability  by creating additional space for emergent vegetation and new bank side vegetation. An existing land drain which currently feeds directly into the Chelmer will be redirected to feed into two new settlement ponds which will filter out the diffuse pollution by a method  of delay, settle out and filter. This land drain will then feed into the new backwater channel.
The aims of this project were achieved in the first instance by the creation of a new 280 backwater channel with three settling ponds and a sluice structure. The back channel connects with the river and an existing culvert/drainage point off the nearby main road. The ponds and back channel in the first instance allow for any nitrate and phosphate heavy water coming through the culvert to be settled and filtered. The back channel is also excellent in times of high flows at providing fish refuges, especially for fish fry which are in danger of being washed downstream in flood events. It will also provide an interface between the river and the bank side which will allow some interesting and diverse flora to develop. Finally, by connecting the river with the floodplain it creates additional riparian habitat and has a small but meaningful impact on flooding by increasing storage in the floodplain, outside of Chelmsford.  


Additional habitat will be created by installing a new sluice to re-wet an existing piece of woodland to historical levels. Extra woodland will be planted on the river side to create shading of the river and the new channel. Water to the new back channel will be controlled via a new water control structure, maintaining the flows of the River Chelmer.
The other aim of the project, namely to increase the resilience of the wet woodland. Was created by installing a sluice at the far end of an existing ditch. Unlike the other sluice this captures rain water and holds it back on the landward side, this has been set at a level that is higher than previous levels and will effect a raise in water off approximately 50 centimeters. The increased water levels have also allowed for additional planting to be undertaken that will extend the water by over half a hectare, there has also been some limited earthworks to spread the water over a wider area.
|Monitoring surveys and results=Monitoring of water quality in the nearby Chelmer is underway. As is monitoring of vegetation in the back channel and bay.
 
|Lessons learn=For the wet woodland enhancement, sometimes the simplest solution is the easiest. The drop board sluice has a habit of leaking and it may be that a simple clay bund with a a pipe and 90 degree collar may have sufficed.  
These works will keep the woodland wetter in the summer months, keeping Bramble under control and allowing a further establishment of the flora normally associated with wet woodlands.
|Monitoring surveys and results=There has been a full pre-works survey conducted by Essex Ecological Consultancy service which has established a baseline index of key invertebrates and flora.
 
Post works it is hoped that this survey can repeated once the site has settled down to allow an accurate summary of the effect of the works. There will also be adhoc surveys of any flora development in time.
|Lessons learn=The sluice at the Wet woodland presented some issues post project, with an unacceptable level of water loss through the frame. This was rectified and is now operating at a normal level. However, some thought must be given to the purpose of the sluice and this should inform the design of the sluice. Holding water back requires a strong but not particularly flexible structure.
 
Any back channel is relies heavily on the correct levels being established, this relies on understanding the local conditions i.e. any local impoundments this may not be easily recognized so early and often discussions with the EA or the local Drainage board are necessary.
}}
}}
{{Image gallery}}
{{Image gallery}}
{{Case study image
|File name=IMG 20140925 114123.jpg
}}
{{Case study image
|File name=IMG 20140723 122117.jpg
}}
{{Case study image
|File name=Little Waltham After.jpg
}}
{{Case study image
|File name=Work begins on the Back channel.jpg
}}
{{Case study image
{{Case study image
|File name=The back channel comes together.jpg
|File name=The back channel comes together.jpg
}}
}}
{{Image gallery end}}
{{Image gallery end}}
{{Toggle button}}
{{Toggle button}}
Line 37: Line 55:
|Subcatchment=Chelmer (Upper)
|Subcatchment=Chelmer (Upper)
}}
}}
{{Site}}
{{Site
|WFD water body code=GB105037041200
|WFD water body name=Chelmer (Upper)
|Heavily modified water body=No
|Protected species present=No
|Invasive species present=No
}}
{{Project background
{{Project background
|Reach length directly affected=400
|Reach length directly affected=400
Line 44: Line 68:
|Works completed=2014/11/21
|Works completed=2014/11/21
|Project completed=2015/03/31
|Project completed=2015/03/31
|Funding sources=Catchment Restoration Fund,  
|Total cost category=50 - 100 k€
|Total1 cost=90
|Funding sources=Defra Catchment Restoration Fund,
|Investigation and design Lead organisation=Essex Wildlife Trust
|Investigation and design Lead organisation=Essex Wildlife Trust
|Investigation and design Other contact forename=Kieren  
|Investigation and design Other contact forename=Kieren
|Investigation and design Other contact surname=Alexander
|Investigation and design Other contact surname=Alexander
|Stakeholder engagement Lead organisation=Essex Wildlife Trust
|Stakeholder engagement Other contact forename=Kieren
|Stakeholder engagement Other contact surname=Alexander
|Works and supervision Lead organisation=Essex Wildlife Trust
|Works and supervision Other contact forename=Kieren
|Works and supervision Other contact surname=Alexander
|Post-project management and maintenance Lead organisation=Essex Wildlife Trust
|Post-project management and maintenance Other contact forename=Kieren
|Post-project management and maintenance Other contact surname=Alexander
|Monitoring Lead organisation=Essex Wildlife Trust
|Monitoring Other contact forename=Kieren
|Monitoring Other contact surname=Alexander
}}
}}
{{Motivations
{{Motivations
|Hydromorphological quality elements=Reduce diffuse pollution
|Hydromorphological quality elements=Channel pattern/planform,
|Biological quality elements=Fish, Invertebrates, Macrophytes,
|Physico-chemical quality elements=Reduce diffuse pollution, Specific synthetic pollutants,
|Other motivation=Biodiversity, Landscape enhancement, flood alleviation
|Other motivation=Biodiversity, Landscape enhancement, flood alleviation
}}
}}
{{Measures
{{Measures
|Bank and bed modifications measure=New sluice structures
|Bank and bed modifications measure=New sluice structures
|Floodplain / River corridor=Creation of backwaters, Creation of wet woodland, Riparian enhancement,  
|Floodplain / River corridor=Creation of backwaters, Creation of wet woodland, Protect/restore riparian zone,
|Social measures=Local volunteers planted the trees and learnt about Natural Flood Management,  
|Social measures=Volunteer engagement,
}}
}}
{{Hydromorphological quality elements header}}
{{Hydromorphological quality elements header}}
Line 71: Line 111:
{{Additional Documents end}}
{{Additional Documents end}}
{{Additional links and references header}}
{{Additional links and references header}}
{{Additional links and references
|Link=http://www.essexrivershub.org.uk/
|Description=For more information on this and other projects in Combined Essex catchment
}}
{{Additional links and references footer}}
{{Additional links and references footer}}
{{Supplementary Information}}
{{Supplementary Information}}
{{Toggle content end}}
{{Toggle content end}}

Latest revision as of 15:04, 6 June 2017

5.00
(one vote)


To discuss or comment on this case study, please use the discussion page.


Location: 51° 46' 26.36" N, 0° 28' 50.59" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Habitat and biodiversity, Hydromorphology
Country England
Main contact forename Kieren
Main contact surname Alexander
Main contact user ID User:KierenAlexander
Contact organisation Essex Wildlife Trust
Contact organisation web site http://www.essexwt.org.uk
Partner organisations Essex and Suffolk Water (Northumbrian Water), Chelmer and Blackwater Catchment Partnership, Natural England, Environment Agency, Chelmer and Blackwater Navigation (Essex Waterways Ltd), Parish Councils and the Rural Communities Council for Essex, Landowners and farmers, Rivers Trust, Essex County Council, Essex Farming and Wildlife Advisory Group
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Project picture

Project summary

Edit project overview to modify the project summary.


This is a multi-benefit project aimed at improving in channel morphological diversity, reducing the amount of diffuse pollution and sedimentation entering the main river Chelmer. It will also increase the amount of riparian habitat along the River Chelmer and enhance the resilience of the wet woodland.

This project was funded by the Catchment restoration fund, as part of the Essex Healthy headwaters scheme. The earthworks were undertaken in late Summer, early Autumn 2014.

The aims of this project were achieved in the first instance by the creation of a new 280 backwater channel with three settling ponds and a sluice structure. The back channel connects with the river and an existing culvert/drainage point off the nearby main road. The ponds and back channel in the first instance allow for any nitrate and phosphate heavy water coming through the culvert to be settled and filtered. The back channel is also excellent in times of high flows at providing fish refuges, especially for fish fry which are in danger of being washed downstream in flood events. It will also provide an interface between the river and the bank side which will allow some interesting and diverse flora to develop. Finally, by connecting the river with the floodplain it creates additional riparian habitat and has a small but meaningful impact on flooding by increasing storage in the floodplain, outside of Chelmsford.

The other aim of the project, namely to increase the resilience of the wet woodland. Was created by installing a sluice at the far end of an existing ditch. Unlike the other sluice this captures rain water and holds it back on the landward side, this has been set at a level that is higher than previous levels and will effect a raise in water off approximately 50 centimeters. The increased water levels have also allowed for additional planting to be undertaken that will extend the water by over half a hectare, there has also been some limited earthworks to spread the water over a wider area.

These works will keep the woodland wetter in the summer months, keeping Bramble under control and allowing a further establishment of the flora normally associated with wet woodlands.

Monitoring surveys and results

Edit project overview to modify the Monitoring survey and results.


There has been a full pre-works survey conducted by Essex Ecological Consultancy service which has established a baseline index of key invertebrates and flora.

Post works it is hoped that this survey can repeated once the site has settled down to allow an accurate summary of the effect of the works. There will also be adhoc surveys of any flora development in time.

Lessons learnt

Edit project overview to modify the lessons learnt.


The sluice at the Wet woodland presented some issues post project, with an unacceptable level of water loss through the frame. This was rectified and is now operating at a normal level. However, some thought must be given to the purpose of the sluice and this should inform the design of the sluice. Holding water back requires a strong but not particularly flexible structure.

Any back channel is relies heavily on the correct levels being established, this relies on understanding the local conditions i.e. any local impoundments this may not be easily recognized so early and often discussions with the EA or the local Drainage board are necessary.


Image gallery


IMG 20140925 114123.jpg
IMG 20140723 122117.jpg
Little Waltham After.jpg
Work begins on the Back channel.jpg
The back channel comes together.jpg
ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Anglian
River basin Combined Essex

Subcatchment

River name Chelmer (Upper)
Area category 10 - 100 km²
Area (km2)
Maximum altitude category 100 - 200 m
Maximum altitude (m) 124124 m <br />0.124 km <br />12,400 cm <br />
Dominant geology Calcareous
Ecoregion Great Britain
Dominant land cover Arable and Horticulture
Waterbody ID GB105037041200



Site

Name
WFD water body codes GB105037041200
WFD (national) typology
WFD water body name Chelmer (Upper)
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 400400 m <br />0.4 km <br />40,000 cm <br />
Project started 2012/10/01
Works started 2014/09/22
Works completed 2014/11/21
Project completed 2015/03/31
Total cost category 50 - 100 k€
Total cost (k€) 9090 k€ <br />90,000 € <br />
Benefit to cost ratio
Funding sources Defra Catchment Restoration Fund

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design Essex Wildlife Trust Kieren Alexander
Stakeholder engagement and communication Essex Wildlife Trust Kieren Alexander
Works and works supervision Essex Wildlife Trust Kieren Alexander
Post-project management and maintenance Essex Wildlife Trust Kieren Alexander
Monitoring Essex Wildlife Trust Kieren Alexander



Reasons for river restoration

Mitigation of a pressure
Hydromorphology Channel pattern/planform
Biology Fish, Invertebrates, Macrophytes
Physico-chemical Reduce diffuse pollution, Specific synthetic pollutants
Other reasons for the project Biodiversity, Landscape enhancement, flood alleviation


Measures

Structural measures
Bank/bed modifications New sluice structures
Floodplain / River corridor Creation of backwaters, Creation of wet woodland, Protect/restore riparian zone
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement) Volunteer engagement
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description
http://http://www.essexrivershub.org.uk/ For more information on this and other projects in Combined Essex catchment

Supplementary Information

Edit Supplementary Information