Case study:Adams Mill enhancements: Difference between revisions
Robclapham (talk | contribs) No edit summary |
No edit summary |
||
(13 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
{{Case study status | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
Line 12: | Line 12: | ||
|Main contact surname=Clapham | |Main contact surname=Clapham | ||
|Contact organisation=Environment Agency | |Contact organisation=Environment Agency | ||
|Partner organisations=Milton Keynes Angling Association, Woodland Trust, | |||
|Multi-site=No | |Multi-site=No | ||
|Project picture=Installing bundles.JPG | |||
|Picture description=Stabilization work commences | |Picture description=Stabilization work commences | ||
|Project summary=Site is location of a historically successful Barbel fishery. Recent deterioration has been noted by EA and Anglers at this location. Surveys have shown that the decline is likely to be a result of increased sediment load from | |Project summary=Site is location of a historically successful Barbel fishery. Recent deterioration has been noted by EA and Anglers at this location. Surveys have shown that the decline is likely to be a result of increased sediment load from collapsed banks undermined by signal crayfish activity, along with historic modifications that have reduced the natural resilience of the river. | ||
Measures undertaken and planned at this site include: | Measures undertaken and planned at this site include: | ||
- Tree planting (started April 2014) | - Tree planting (started April 2014) | ||
- Bank stabilization( | 50 Willow whips planted in margins of river. | ||
- Further tree planting (Completed in Feb 2015) | |||
100 Alder, 50 Hawthorn, 25 Oak, 25 Maple and other species, to be planted along this section of river with support from Woodlands Trust. | |||
- Bank stabilization( October 2014) | |||
2 sections of bank stabilazation completed using brushwood bundles, staked into bank. | |||
- Riffle enhancement(started October 2014) | - Riffle enhancement(started October 2014) | ||
1 riffle enhancement installed in October 2014. (2 Poplar logs staked and tied with fencing wire). | |||
1 riffle ehancement installed in additional location in Feb 2015 (5 Poplar logs 2-4 m in length secured with 20mm re-bar. Logs to be in alternating orientations to maximise variation in scour patterns). | |||
- Channel narrowing (expected 2015) | - Channel narrowing (expected 2015) | ||
All work undertaken by Environment Agency with assistance from local volunteers. | |||
|Monitoring surveys and results=Location of riffle enhancement is | |Monitoring surveys and results=Location of riffle enhancement 1 is existing WFD monitoring site for fish. Pre- and post-enhancement survey data will be available. | ||
}} | }} | ||
{{Image gallery}} | {{Image gallery}} | ||
Line 38: | Line 50: | ||
{{Case study image | {{Case study image | ||
|File name=Wood pile.JPG | |File name=Wood pile.JPG | ||
}} | |||
{{Case study image | |||
|File name=IMG 5019.JPG | |||
}} | |||
{{Case study image | |||
|File name=PA030216.JPG | |||
}} | }} | ||
{{Image gallery end}} | {{Image gallery end}} | ||
{{Toggle button}} | {{Toggle button}} | ||
{{Toggle content start}} | {{Toggle content start}} | ||
{{Case study subcatchment}} | {{Case study subcatchment | ||
|Subcatchment=Ouse (Cosgrove to Newport Pagnell) | |||
}} | |||
{{Site | {{Site | ||
|Name=Adams Mill | |Name=Adams Mill | ||
Line 60: | Line 80: | ||
|Works started=2014/10/03 | |Works started=2014/10/03 | ||
|Total cost category=Less than 1 k€ | |Total cost category=Less than 1 k€ | ||
|Funding sources= | |Funding sources=Environment Agency Grant in Aid, | ||
|Investigation and design cost category=Less than 1 k€ | |Investigation and design cost category=Less than 1 k€ | ||
|Investigation and design Lead organisation=Environment Agency | |Investigation and design Lead organisation=Environment Agency | ||
Line 79: | Line 99: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure=Bank | |Bank and bed modifications measure=Bank stabilisation, | ||
|Planform / Channel pattern=Increase in-channel hydromorphological diversity, | |Planform / Channel pattern=Increase in-channel hydromorphological diversity, | ||
}} | }} | ||
{{Hydromorphological quality elements header}} | {{Hydromorphological quality elements header}} | ||
Line 120: | Line 140: | ||
{{End table}} | {{End table}} | ||
{{Other responses header}} | {{Other responses header}} | ||
{{Other response table row | |||
|Element=Habitat mapping | |||
|Monitored before=No | |||
|Monitored after=No | |||
|Qualitative monitoring=Yes | |||
|Quantitative monitoring=Yes | |||
|Control site used=No | |||
}} | |||
{{End table}} | {{End table}} | ||
{{Monitoring documents}} | {{Monitoring documents}} |
Latest revision as of 13:45, 1 November 2018
Project overview
Status | In progress |
---|---|
Project web site | |
Themes | Fisheries, Hydromorphology |
Country | England |
Main contact forename | Rob |
Main contact surname | Clapham |
Main contact user ID | |
Contact organisation | Environment Agency |
Contact organisation web site | |
Partner organisations | Milton Keynes Angling Association, Woodland Trust |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Site is location of a historically successful Barbel fishery. Recent deterioration has been noted by EA and Anglers at this location. Surveys have shown that the decline is likely to be a result of increased sediment load from collapsed banks undermined by signal crayfish activity, along with historic modifications that have reduced the natural resilience of the river.
Measures undertaken and planned at this site include:
- Tree planting (started April 2014) 50 Willow whips planted in margins of river.
- Further tree planting (Completed in Feb 2015) 100 Alder, 50 Hawthorn, 25 Oak, 25 Maple and other species, to be planted along this section of river with support from Woodlands Trust.
- Bank stabilization( October 2014) 2 sections of bank stabilazation completed using brushwood bundles, staked into bank.
- Riffle enhancement(started October 2014) 1 riffle enhancement installed in October 2014. (2 Poplar logs staked and tied with fencing wire). 1 riffle ehancement installed in additional location in Feb 2015 (5 Poplar logs 2-4 m in length secured with 20mm re-bar. Logs to be in alternating orientations to maximise variation in scour patterns).
- Channel narrowing (expected 2015)
All work undertaken by Environment Agency with assistance from local volunteers.
Monitoring surveys and results
Location of riffle enhancement 1 is existing WFD monitoring site for fish. Pre- and post-enhancement survey data will be available.
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|