Case study:Llobregat river restoration: Difference between revisions
No edit summary |
No edit summary |
||
(2 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{ | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
Line 209: | Line 204: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Revetmens with local species,Bank stabilisation | ||
|Floodplain / River corridor=Riparian planting,Control of invasive species,Silvicultural treatments | |||
|Planform / Channel pattern=Remove obstacles in the riverbed | |||
|Floodplain / River corridor= | |||
|Planform / Channel pattern= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} |
Latest revision as of 13:42, 1 June 2017
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Environmental flows and water resources, Habitat and biodiversity, Hydromorphology, Social benefits |
Country | Spain |
Main contact forename | Joan |
Main contact surname | Feliú |
Main contact user ID | |
Contact organisation | Acciónatura |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The river Llobregat lower course is the result of centuries of human activity. Historically it has tried to avoid overflows and maintain a constant channel in order to gain land for agriculture and to capture water for irrigation and industry. In recent years, construction of major infrastructures such as highway, the TGV and other service roads have come to narrow the river steadily reducing temporary floodplain.
The important aspects are summarized in the following features: creating favorable conditions (morphological and hydraulic); stabilize the channel and enable the growth of vegetation compatible with the frequency of floods and flooding near the river; create riverside communities continue to function as a corridor; promote native species and eliminate the alien; recover the riparian habitat and all; lost and refuge areas for wildlife habitat; encourage and facilitate the enjoyment of the river by the population, with emphasis on landscape and ecological aspects and fen-it compatible with conservation.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Increased biodiversity, river Llobregat, Sallent.
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|