Case study:River Avon Stream project: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
(8 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
{{ | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
Line 16: | Line 11: | ||
|Main contact forename=Jenny | |Main contact forename=Jenny | ||
|Main contact surname=Wheldon | |Main contact surname=Wheldon | ||
|Contact organisation= | |Contact organisation=Natural England | ||
|Name of parent multi-site project=Case_study:stream | |Name of parent multi-site project=Case_study:stream | ||
|Multi-site=Yes | |Multi-site=Yes | ||
Line 22: | Line 17: | ||
|Picture description=Avon at Amesbury, post-restoration works in 2009 | |Picture description=Avon at Amesbury, post-restoration works in 2009 | ||
}} | }} | ||
{{ | {{Image_gallery}} | ||
|Subcatchment= | {{Image_gallery_end}} | ||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case study subcatchment | |||
|Subcatchment=Hampshire Avon (Lower) | |||
}} | }} | ||
{{Site | {{Site | ||
Line 44: | Line 40: | ||
|Average bankfull channel depth category=5 - 10 m | |Average bankfull channel depth category=5 - 10 m | ||
}} | }} | ||
{{ | {{Project background | ||
|Project started=2002/12/01 | |||
|Total1 cost=1000 k€ | |||
|Funding sources=European Commission,Heritage Lottery Fund (HLF), EU LIFE Programme, | |||
|Project started= | |||
|Total1 cost= | |||
|Funding sources= | |||
}} | }} | ||
{{Motivations | {{Motivations | ||
Line 131: | Line 60: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Planting,Depth variation,Soft erosion solutions,Weir removal | ||
|Floodplain / River corridor=Creation of wetland,Connection to wider floodplain | |||
|Planform / Channel pattern=Adding sinuosity, | |||
|Wider stakeholder / citizen engagement=Consultation,Participation in design | |||
|Floodplain / River corridor= | |||
|Planform / Channel pattern= | |||
|Wider stakeholder / citizen engagement= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} | ||
Line 273: | Line 190: | ||
{{Monitoring_documents}} | {{Monitoring_documents}} | ||
{{Monitoring_documents_end}} | {{Monitoring_documents_end}} | ||
{{Additional_Documents}} | {{Additional_Documents}} | ||
{{Additional_Documents_end}} | {{Additional_Documents_end}} | ||
Line 281: | Line 196: | ||
{{Supplementary_Information | {{Supplementary_Information | ||
|Information= | |Information= | ||
}} | }} | ||
{{Case_study_upload}} | {{Case_study_upload}} | ||
{{Toggle content end}} |
Latest revision as of 13:24, 1 November 2018
Location: 50° 48' 39.60" N, 1° 48' 32.40" W
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Habitat and biodiversity, Monitoring, Water quality |
Country | England |
Main contact forename | Jenny |
Main contact surname | Wheldon |
Main contact user ID | |
Contact organisation | Natural England |
Contact organisation web site | |
Partner organisations | |
This is a parent project encompassing the following projects |
River Avon at East Chisenbury |
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Salisbury Avon Restoration Project, Salmonid, coarse fish and wetland bird habitat and flood plain linkage project, Hampshire Avon, Strategic Framework for Restoration of the River Avon (SFfRRA)
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|