Case study:Kimpton Park: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
 
(2 intermediate revisions by 2 users not shown)
Line 19: Line 19:
|Main contact surname=Heisse
|Main contact surname=Heisse
|Contact organisation=Environment Agency
|Contact organisation=Environment Agency
|Partner organisations=LB Sutton
|Partner organisations=London Borough of Sutton,
|Multi-site=No
|Multi-site=No
|Project summary=Divert existing Pyl Brook channel near culvert entrance through Hamilton Avenue recreation ground and reconnect it into the existing watercourse 113m downstream. The total length of the diversion channel is 164m which effectively increases the watercourse length by 51m. The new channel will incorporate a sinuous channel with riffles, pools and berms. The old channel will be partially infilled and will form an undisturbed island of habitat between the new and old channels. Some of the toe boarding will be removed and used in habitat elsewhere on site. New and upgraded footpaths, wildlife flower grass areas and bridge across Pyl Brook will be provided. The site is situated within the Kimpton Industrial Area and forms part of a wider proposal to create a Linear Park around the Industrial Estate. This forms part of the UDP objectives for the Industrial area and associated environmental and recreational enhancements in the area. The works are being carried out by the London Borough of Sutton. The Environment Agency have been consulted regarding the diversion and re-routing of a section of the Pyl Brook as part of the Planning Application and the Consenting process.
|Project summary=Divert existing Pyl Brook channel near culvert entrance through Hamilton Avenue recreation ground and reconnect it into the existing watercourse 113m downstream. The total length of the diversion channel is 164m which effectively increases the watercourse length by 51m. The new channel will incorporate a sinuous channel with riffles, pools and berms. The old channel will be partially infilled and will form an undisturbed island of habitat between the new and old channels. Some of the toe boarding will be removed and used in habitat elsewhere on site. New and upgraded footpaths, wildlife flower grass areas and bridge across Pyl Brook will be provided. The site is situated within the Kimpton Industrial Area and forms part of a wider proposal to create a Linear Park around the Industrial Estate. This forms part of the UDP objectives for the Industrial area and associated environmental and recreational enhancements in the area. The works are being carried out by the London Borough of Sutton. The Environment Agency have been consulted regarding the diversion and re-routing of a section of the Pyl Brook as part of the Planning Application and the Consenting process.
Line 32: Line 32:
}}
}}
{{Site
{{Site
|Name=
|WFD water body code=GB106039022850
   
|WFD water body name=Beverley Brook (Motspur Park to Thames) and Pyl Brook at West Barnes
   
|Heavily modified water body=No
     
|Protected species present=No
|WFD water body code=
|Invasive species present=No
     
|WFD (national) typology=
     
|WFD water body name=
     
|Pre-project morphology=
     
|Reference morphology=
     
|Heavily modified water body=
     
|Local site designation=
     
|Site designation=
     
|Protected species present=
     
|Invasive species present=
     
|Species=
     
|Dominant hydrology=
     
|Dominant substrate=
     
|River corridor land use=
     
|Average bankfull channel width category=
     
|Avrg bankfull channel width=
     
|Average bankfull channel depth category=
     
|Avrg1 bankfull channel depth=
     
|Mean discharge category=
     
|Mn discharge=
     
|Average channel gradient category=
     
|Avrg channel gradient=
     
}}
}}
{{Project background
{{Project background
Line 92: Line 49:
}}
}}
{{Measures
{{Measures
|Bank and bed modifications measure=
|Bank and bed modifications measure=Bank reprofiling
   
|Planform / Channel pattern=Creation of new channel, Habitat creation
   
|Social measures=Aesthetics
     
|Floodplain / River corridor=
     
|Planform / Channel pattern=
     
|Other technical measure=
     
|Management interventions=
     
|Social measures=
     
|Wider stakeholder / citizen engagement=
     
}}
}}
{{Hydromorphological_quality_elements_header}}
{{Hydromorphological_quality_elements_header}}

Latest revision as of 15:29, 6 June 2017

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 51° 22' 31.47" N, 0° 12' 37.15" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Flood risk management, Social benefits
Country England
Main contact forename Joanna
Main contact surname Heisse
Main contact user ID
Contact organisation Environment Agency
Contact organisation web site
Partner organisations London Borough of Sutton
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


Divert existing Pyl Brook channel near culvert entrance through Hamilton Avenue recreation ground and reconnect it into the existing watercourse 113m downstream. The total length of the diversion channel is 164m which effectively increases the watercourse length by 51m. The new channel will incorporate a sinuous channel with riffles, pools and berms. The old channel will be partially infilled and will form an undisturbed island of habitat between the new and old channels. Some of the toe boarding will be removed and used in habitat elsewhere on site. New and upgraded footpaths, wildlife flower grass areas and bridge across Pyl Brook will be provided. The site is situated within the Kimpton Industrial Area and forms part of a wider proposal to create a Linear Park around the Industrial Estate. This forms part of the UDP objectives for the Industrial area and associated environmental and recreational enhancements in the area. The works are being carried out by the London Borough of Sutton. The Environment Agency have been consulted regarding the diversion and re-routing of a section of the Pyl Brook as part of the Planning Application and the Consenting process.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

Edit project overview to modify the lessons learnt.


Services on the site are the primary constraints. These consist of a gas main and foul sewer with manhole which are restricting the alignment and depth of the new channel. In addition the catchment itself is a constraint. London Clay underlies the site and downstream sections. However as the catchment rises a transition occurs to more permeable Chalk. This combination of a permeable upper catchment and urban build up may have contributed to the flashy nature of the Pyl Brook. Therefore the scheme has to cope with low base flows and peaky responses during storm events.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Thames
River basin London

Subcatchment

River name Beverley Brook (Motspur Park to Thames) and Pyl Brook at West Barnes
Area category 1000 - 10000 km²
Area (km2)
Maximum altitude category 100 - 200 m
Maximum altitude (m) 172172 m <br />0.172 km <br />17,200 cm <br />
Dominant geology Calcareous
Ecoregion Great Britain
Dominant land cover Suburban
Waterbody ID GB106039022850



Other case studies in this subcatchment: Anton Crescent Wetlands Regeneration, Ashlone Wharf FCRM scheme, Barn Elms Sports Ground, Barn Elms Wetland Centre, South West London, Barnes Common, Barnes Common improvements, Beverley Brook Flow control structures, Beverley Brook d/s of Rock’s Lane, Beverley Park, Cuddington Park... further results


Site

Name
WFD water body codes GB106039022850
WFD (national) typology
WFD water body name Beverley Brook (Motspur Park to Thames) and Pyl Brook at West Barnes
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 164 m0.164 km <br />16,400 cm <br />
Project started 2008/01/01
Works started
Works completed 2011/01/01
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources S106 EA, London Borough of Sutton the client

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology Channel pattern/planform, Width & depth variation
Biology
Physico-chemical
Other reasons for the project Landscape enhancement, Recreation


Measures

Structural measures
Bank/bed modifications Bank reprofiling
Floodplain / River corridor
Planform / Channel pattern Creation of new channel, Habitat creation
Other
Non-structural measures
Management interventions
Social measures (incl. engagement) Aesthetics
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative