Case study:Merdian Water development site: Difference between revisions
No edit summary |
Hazel Wilson (talk | contribs) No edit summary |
||
(3 intermediate revisions by one other user not shown) | |||
Line 27: | Line 27: | ||
{{Toggle_button}} | {{Toggle_button}} | ||
{{Toggle_content_start}} | {{Toggle_content_start}} | ||
{{ | {{Case study subcatchment | ||
|Subcatchment= | |Subcatchment=Pymmes Brook (upper channel with Muswell St & Bounds Grn Brk) | ||
}} | }} | ||
{{Site | {{Site | ||
|WFD water body code=GB106038027940 | |||
|WFD water body name=Pymmes Brook (upper channel with Muswell St & Bounds Grn Brk) | |||
|Heavily modified water body=No | |||
|Protected species present=No | |||
|WFD water body code= | |Invasive species present=No | ||
|WFD water body name= | |||
|Heavily modified water body= | |||
|Protected species present= | |||
|Invasive species present= | |||
}} | }} | ||
{{Project background | {{Project background | ||
Line 92: | Line 42: | ||
}} | }} | ||
{{Motivations | {{Motivations | ||
|Specific mitigation=Flood risk management, Urbanisation | |||
|Other motivation=Recreation | |||
|Specific mitigation= | |||
|Other motivation= | |||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Removing of concrete structures | ||
|Social measures=Aesthetics | |||
|Social measures= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} |
Latest revision as of 12:27, 27 October 2015
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Planned |
---|---|
Project web site | |
Themes | Economic aspects, Flood risk management, Habitat and biodiversity, Social benefits |
Country | England |
Main contact forename | John |
Main contact surname | Bryden |
Main contact user ID | |
Contact organisation | Environment Agency |
Contact organisation web site | http://www.gov.uk/government/organisations/environment-agency |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The development of the site is hugely constrained by flood risk, the development should removal all concrete banks and fully restore the channel, through this there is significant opportunity to reduce the risk of flooding to the surrounding areas, thereby enabling development. The areas which do flood can provide significant amenity and recreational value to the public. Site is current a poorly used industrial site, its outlined for development of 5,000 homes in the Enfield Local Development Framework, as part of the London, Stanstead, Cambridge Growth Area. The Pymmes and Salmons Brook confluence is located in the development, and the Lee Navigation runs through the centre of the site with the Lee Flood Relief Channel on the eastern boundary. All of the rivers are in poor condition and generally have concrete banks.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Arnos Park - Pymmes Brook, Friary Park, Friern Barnet Former Sewage Works, Parks between A10 and Melville Gardens, Pymmes Brook and new river crossing point, Weir removal at Tile Kiln Park, Wilmer Way School Playing Field
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|