Case study:Ladywell Fields Phase 2: Difference between revisions
No edit summary |
No edit summary |
||
(6 intermediate revisions by 2 users not shown) | |||
Line 27: | Line 27: | ||
{{Toggle_button}} | {{Toggle_button}} | ||
{{Toggle_content_start}} | {{Toggle_content_start}} | ||
{{ | {{Case study subcatchment | ||
|Subcatchment= | |Subcatchment=Ravensbourne (Catford to Deptford) | ||
}} | }} | ||
{{Site | {{Site | ||
|WFD water body code=GB106039023270 | |||
|WFD water body name=Ravensbourne (Catford to Deptford) | |||
|Heavily modified water body=No | |||
|Protected species present=No | |||
|WFD water body code= | |Invasive species present=No | ||
|WFD water body name= | |||
|Heavily modified water body= | |||
|Protected species present= | |||
|Invasive species present= | |||
}} | }} | ||
{{ | {{Project background | ||
|Reach length directly affected= | |Reach length directly affected=725 m | ||
|Project started=2008/01/01 | |||
|Works completed=2011/01/01 | |||
|Total cost category=1000 - 5000 k€ | |||
|Project started= | |Funding sources=CLG Parks Budget | ||
|Works completed= | |||
|Total cost category= | |||
|Funding sources= | |||
}} | }} | ||
{{Motivations | {{Motivations | ||
|Hydromorphological quality elements= | |Hydromorphological quality elements=Channel pattern/planform, Width & depth variation | ||
|Other motivation=Recreation | |||
|Other motivation= | |||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Bank reprofiling, Removing of concrete structures, Weir removal | ||
|Floodplain / River corridor=Creation of wetland | |||
|Planform / Channel pattern=Creation of meanders, Creation of pools and riffles | |||
|Floodplain / River corridor= | |||
|Planform / Channel pattern= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} |
Latest revision as of 14:57, 1 June 2017
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Flood risk management, Habitat and biodiversity, Social benefits |
Country | England |
Main contact forename | Dave |
Main contact surname | Webb |
Main contact user ID | |
Contact organisation | Environment Agency |
Contact organisation web site | http://www.gov.uk/government/organisations/environment-agency |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Creation of floodplain wetlands, restore pools and riffles, re-grade river bank, remove concrete bank, re-meandering, localised narrowing, redesign/remove weir, removal of toe boards. Channel uniform with predominantly natural bed and armoured banks. Lack of channel diversity and extended lengths of shallow water. Steep banks results in poor connectivity between the river and adjacent land. The site is public open space, but the river does not contribute to the park landscape.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Broadway Fields/ Seagers Distillary, Catford Greyhound Stadium, Cornmill Gardens (QUERCUS), Ladywell Fields (QUERCUS), Ladywell Fields to Cornmill Gardens, Ladywell Fields toeboarding, Lewisham College weir, Linear Park, QUERCUS Ravensbourne, Ravensbourne Tescos... further results
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|