{{Project overview | {{Project overview | ||
|Status= | |Status=Complete | ||
|Themes=Fisheries | |Project web site url=http://www.wandletrust.org/habitat-restoration-coir-rolls-at-hackbridge/ | ||
|Themes=Fisheries, Habitat and biodiversity, Social benefits, Urban | |||
|Country=England | |Country=England | ||
|Main contact forename=Bella | |Main contact forename=Bella | ||
|Main contact surname=Davies | |Main contact surname=Davies | ||
|Contact organisation=Wandle Trust | |Contact organisation=Wandle Trust | ||
|Partner organisations= | |Contact organisation url=www.wandletrust.org | ||
|Partner organisations=Wandle Piscators, Environment Agency, | |||
|Multi-site=No | |Multi-site=No | ||
|Project summary= | |Project summary=Working with Wandle Piscators and the Environment Agency, 39 metres of coir rolls were installed at Hackbridge to soften the concrete bank edge. Works were completed with 34 local volunteers. | ||
}} | }} | ||
{{Image_gallery}} | {{Image_gallery}} | ||
Line 27: | Line 32: | ||
{{Toggle_button}} | {{Toggle_button}} | ||
{{Toggle_content_start}} | {{Toggle_content_start}} | ||
{{ | {{Case study subcatchment | ||
|Subcatchment= | |Subcatchment=Wandle (Croydon to Wandsworth) and the R. Gravney | ||
}} | }} | ||
{{Site | {{Site | ||
|WFD water body code=GB106039023460 | |||
|WFD water body name=Wandle (Croydon to Wandsworth) and the R. Gravney | |||
|Heavily modified water body=No | |||
|Protected species present=No | |||
|WFD water body code= | |Invasive species present=No | ||
|WFD water body name= | |||
|Heavily modified water body= | |||
|Protected species present= | |||
|Invasive species present= | |||
}} | }} | ||
{{ | {{Project background | ||
|Reach length directly affected= | |Reach length directly affected=250 m | ||
|Project started=2008/01/01 | |||
|Total cost category=100 - 500 k€ | |||
|Funding sources=Landfill (Viridor), Thames Water Settlement, Environment Agency, Wandle Piscators | |||
|Project started= | |||
|Total cost category= | |||
|Funding sources= | |||
}} | }} | ||
{{Motivations | {{Motivations | ||
| | |Specific mitigation=Barriers to fish migration | ||
|Hydromorphological quality elements=Width & depth variation | |||
|Biological quality elements=Fish | |||
| | |||
| | |||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Deflectors, Installation of coir rolls, Removal of sediment | ||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} |
Latest revision as of 12:21, 1 November 2018
This case study is pending approval by a RiverWiki administrator.
Location: 51° 22' 34.77" N, 0° 9' 28.61" W
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | http://http://www.wandletrust.org/habitat-restoration-coir-rolls-at-hackbridge/ |
Themes | Fisheries, Habitat and biodiversity, Social benefits, Urban |
Country | England |
Main contact forename | Bella |
Main contact surname | Davies |
Main contact user ID | |
Contact organisation | Wandle Trust |
Contact organisation web site | http://www.wandletrust.org |
Partner organisations | Wandle Piscators, Environment Agency |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
Edit project overview to modify the project summary.
Working with Wandle Piscators and the Environment Agency, 39 metres of coir rolls were installed at Hackbridge to soften the concrete bank edge. Works were completed with 34 local volunteers.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Beddington Park, Beddington Park Enhancements, Boulder Pool and Plough Lane, Durand Close, EDF Weir removal, Eel Pass over tilting weir at Ravensbury Park, Garratt Park, Hackbridge Restoration, King Georges Park, Medland Close, River Wandle... further results
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|