Case study:Linear Park: Difference between revisions
No edit summary |
No edit summary |
||
(8 intermediate revisions by 5 users not shown) | |||
Line 13: | Line 13: | ||
}} | }} | ||
{{Project overview | {{Project overview | ||
|Status= | |Status=Complete | ||
|Themes=Habitat and biodiversity | |Themes=Fisheries, Habitat and biodiversity, Social benefits, Urban | ||
|Country=England | |Country=England | ||
|Main contact forename=Dave | |Main contact forename=Dave | ||
|Main contact surname=Webb | |Main contact surname=Webb | ||
|Main contact id=Djwebb | |||
|Contact organisation=Environment Agency | |Contact organisation=Environment Agency | ||
|Contact organisation url=www.gov.uk/government/organisations/environment-agency | |Contact organisation url=www.gov.uk/government/organisations/environment-agency | ||
|Partner organisations= | |Partner organisations=London Borough of Lewisham, Thames 21, | ||
|Multi-site=No | |Multi-site=No | ||
|Project summary=Removal of toe boards; removal of concrete walls; river edge planting; re-meandering; localised narrowing Channel uniform with natural bed and armoured banks. Lack of channel diversity and extended lengths of shallow water. Steep banks results in poor connectivity between | |Project summary=Removal of toe boards; removal of concrete walls; river edge planting; re-meandering; localised narrowing Channel uniform with natural bed and armoured banks. Lack of channel diversity and extended lengths of shallow water. Steep banks results in poor connectivity between river and adjacent land. | ||
}} | }} | ||
{{Image_gallery}} | {{Image_gallery}} | ||
Line 28: | Line 29: | ||
{{Toggle_button}} | {{Toggle_button}} | ||
{{Toggle_content_start}} | {{Toggle_content_start}} | ||
{{ | {{Case study subcatchment | ||
|Subcatchment= | |Subcatchment=Ravensbourne (Catford to Deptford) | ||
}} | }} | ||
{{Site | {{Site | ||
|WFD water body code=GB106039023270 | |||
|WFD water body name=Ravensbourne (Catford to Deptford) | |||
|Heavily modified water body=No | |||
|Protected species present=No | |||
|WFD water body code= | |Invasive species present=No | ||
|WFD water body name= | |||
|Heavily modified water body= | |||
|Protected species present= | |||
|Invasive species present= | |||
}} | }} | ||
{{Project_background | {{Project_background | ||
Line 161: | Line 112: | ||
}} | }} | ||
{{Motivations | {{Motivations | ||
| | |Specific mitigation=Riparian development | ||
|Hydromorphological quality elements=Channel pattern/planform, Width & depth variation | |||
| | |||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Bank reprofiling, Removing of concrete structures, Toeboard removal | ||
|Floodplain / River corridor=Tree management | |||
|Planform / Channel pattern=Creation of meanders | |||
|Floodplain / River corridor= | |||
|Planform / Channel pattern= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} |
Latest revision as of 15:40, 6 June 2017
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Fisheries, Habitat and biodiversity, Social benefits, Urban |
Country | England |
Main contact forename | Dave |
Main contact surname | Webb |
Main contact user ID | User:Djwebb |
Contact organisation | Environment Agency |
Contact organisation web site | http://www.gov.uk/government/organisations/environment-agency |
Partner organisations | London Borough of Lewisham, Thames 21 |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Removal of toe boards; removal of concrete walls; river edge planting; re-meandering; localised narrowing Channel uniform with natural bed and armoured banks. Lack of channel diversity and extended lengths of shallow water. Steep banks results in poor connectivity between river and adjacent land.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Broadway Fields/ Seagers Distillary, Catford Greyhound Stadium, Cornmill Gardens (QUERCUS), Ladywell Fields (QUERCUS), Ladywell Fields Phase 2, Ladywell Fields to Cornmill Gardens, Ladywell Fields toeboarding, Lewisham College weir, QUERCUS Ravensbourne, Ravensbourne Tescos... further results
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|