Case study:Catford Greyhound Stadium: Difference between revisions
No edit summary |
No edit summary |
||
(5 intermediate revisions by 2 users not shown) | |||
Line 27: | Line 27: | ||
{{Toggle_button}} | {{Toggle_button}} | ||
{{Toggle_content_start}} | {{Toggle_content_start}} | ||
{{ | {{Case study subcatchment | ||
|Subcatchment= | |Subcatchment=Ravensbourne (Catford to Deptford) | ||
}} | }} | ||
{{Site | {{Site | ||
|WFD water body code=GB106039023270 | |||
|WFD water body name=Ravensbourne (Catford to Deptford) | |||
|Heavily modified water body=No | |||
|Protected species present=No | |||
|WFD water body code= | |Invasive species present=No | ||
|WFD water body name= | |||
|Heavily modified water body= | |||
|Protected species present= | |||
|Invasive species present= | |||
}} | }} | ||
{{ | {{Project background | ||
|Reach length directly affected= | |Reach length directly affected=120 m | ||
|Project started=2008/01/01 | |||
|Total cost category=10 - 50 k€ | |||
|Project started= | |||
|Total cost category= | |||
}} | }} | ||
{{Motivations | {{Motivations | ||
|Hydromorphological quality elements= | |Hydromorphological quality elements=Channel pattern/planform | ||
|Biological quality elements=Invertebrates, Vertebrates | |||
|Biological quality elements= | |||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Deflectors, Introduction of gravel, | ||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} |
Latest revision as of 12:21, 1 June 2017
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Planned |
---|---|
Project web site | |
Themes | Habitat and biodiversity |
Country | England |
Main contact forename | Joanna |
Main contact surname | Heisse |
Main contact user ID | |
Contact organisation | Environment Agency |
Contact organisation web site | http://www.gov.uk/government/organisations/environment-agency |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
A buffer strip of between 5 and 8 metres is to be created with native planting to create wildflower margin. Deflectors and gravels are to be placed in the river to improve in channel processes and encourage the development of marginal vegetation. Timber latticing is to be placed along the river wall to encourage the growth of vegetation and provide habitat for invertebrates and foraging habitat for birds and bats. To enhance the river as part of the redevelopment of the site and comply with current policy and legislation to improve the environment as part of the planning process. This is also in line with long term aims to improve the River Ravensbourne which is currently channelised and heavily engineered.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Broadway Fields/ Seagers Distillary, Cornmill Gardens (QUERCUS), Ladywell Fields (QUERCUS), Ladywell Fields Phase 2, Ladywell Fields to Cornmill Gardens, Ladywell Fields toeboarding, Lewisham College weir, Linear Park, QUERCUS Ravensbourne, Ravensbourne Tescos... further results
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|