Case study:Ravensbourne at Queensmead: Difference between revisions
No edit summary |
No edit summary |
||
(9 intermediate revisions by 3 users not shown) | |||
Line 14: | Line 14: | ||
{{Project overview | {{Project overview | ||
|Status=Planned | |Status=Planned | ||
|Themes=Environmental flows and water resources, Fisheries | |Themes=Environmental flows and water resources, Fisheries, Flood risk management, Habitat and biodiversity, Social benefits | ||
|Country=England | |Country=England | ||
|Main contact forename=Dave | |Main contact forename=Dave | ||
Line 26: | Line 26: | ||
{{Toggle_button}} | {{Toggle_button}} | ||
{{Toggle_content_start}} | {{Toggle_content_start}} | ||
{{ | {{Case study subcatchment | ||
|Subcatchment= | |Subcatchment=Ravensbourne (Keston to Catford) | ||
}} | }} | ||
{{Site | {{Site | ||
|WFD water body code=GB106039023260 | |||
|WFD water body name=Ravensbourne (Keston to Catford) | |||
|Heavily modified water body=No | |||
|Protected species present=No | |||
|WFD water body code= | |Invasive species present=No | ||
|WFD water body name= | |||
|Heavily modified water body= | |||
|Protected species present= | |||
|Invasive species present= | |||
}} | }} | ||
{{Project_background | {{Project_background | ||
Line 159: | Line 109: | ||
}} | }} | ||
{{Motivations | {{Motivations | ||
|Specific mitigation=Riparian development, Flood risk management | |||
|Other motivation=Recreation | |||
|Specific mitigation= | |||
|Other motivation= | |||
}} | }} | ||
{{Measures | {{Measures | ||
|Floodplain / River corridor=Park creation, Tree management, | |||
|Planform / Channel pattern=Creation of meanders, Creation of pools and riffles | |||
|Social measures=Improved public access, Community Education, | |||
|Floodplain / River corridor= | |||
|Planform / Channel pattern= | |||
|Social measures= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} |
Latest revision as of 11:32, 5 June 2017
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Planned |
---|---|
Project web site | |
Themes | Environmental flows and water resources, Fisheries, Flood risk management, Habitat and biodiversity, Social benefits |
Country | England |
Main contact forename | Dave |
Main contact surname | Webb |
Main contact user ID | |
Contact organisation | Environment Agency |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Channel enhancements, including low flow meanders; marginal planting; restore pools and riffles; remove concrete bank; re-meandering. A potential focus of this project is the creation of a linear riverside park. This could bring together and connect both existing and new green spaces and incorporate a restored river channel and continuous footpath and cycle network. In addition, it would also provide multi-purpose flood alleviation, recreation, ecological and educational benefits. Channel uniform with concrete bed and bank. Parts of this section run through public open space but some section have development at the river edge.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Downham Playing Fields, Fordmill weir, Norman Park Bromley.
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|