Case study:Broadway Fields/ Seagers Distillary: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
 
(9 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{Case_study_status
{{Case study status
|Approval status=
|Approval status=Approved
   
   
   
 
 
   
      Draft
}}
}}
{{Location
{{Location
Line 14: Line 7:
{{Project overview
{{Project overview
|Status=Planned
|Status=Planned
|Themes=Economic aspects
|Themes=Economic aspects, Fisheries, Habitat and biodiversity
|Country=England
|Country=England
|Main contact forename=Peter
|Main contact forename=Peter
Line 21: Line 14:
|Contact organisation url=www.gov.uk/government/organisations/environment-agency
|Contact organisation url=www.gov.uk/government/organisations/environment-agency
|Multi-site=No
|Multi-site=No
|Project picture=Broadwayfields1.png
|Picture description=Current state
|Project summary=The overall objective would be to restore the river channel throughout the park for the 85m length. Due to constraints set by DLR, this may mean leaving one river wall in place and up to half of the bed, however solutions will be available to soften both banks and generate a natural low flow channel. This is likely to be partially funded by the Seager Distillery section 106 agreement, however further funding will be required to complete the whole section of river. This site was cleared and developed into a public park, leaving an 8m boundary to the river for future river restoration works. The channel has a uniform concrete bed and banks and is semi-tidal. It is very shallow during low flow/low tide and could cause a barrier to fish migration. It is devoid of habitat.
|Project summary=The overall objective would be to restore the river channel throughout the park for the 85m length. Due to constraints set by DLR, this may mean leaving one river wall in place and up to half of the bed, however solutions will be available to soften both banks and generate a natural low flow channel. This is likely to be partially funded by the Seager Distillery section 106 agreement, however further funding will be required to complete the whole section of river. This site was cleared and developed into a public park, leaving an 8m boundary to the river for future river restoration works. The channel has a uniform concrete bed and banks and is semi-tidal. It is very shallow during low flow/low tide and could cause a barrier to fish migration. It is devoid of habitat.
Start date governed by planning agreement (S106 Seager)
|Monitoring surveys and results=Pre-project data
}}
}}
{{Image_gallery}}
{{Image_gallery}}
Line 27: Line 24:
{{Toggle_button}}
{{Toggle_button}}
{{Toggle_content_start}}
{{Toggle_content_start}}
{{Case_study_subcatchment
{{Case study subcatchment
|Subcatchment=
|Subcatchment=Ravensbourne (Catford to Deptford)
   
   
   
   
   
   
     
}}
}}
{{Site
{{Site
|Name=
|WFD water body code=GB106039023270
   
|WFD water body name=Ravensbourne (Catford to Deptford)
   
|Heavily modified water body=No
     
|Protected species present=No
|WFD water body code=
|Invasive species present=No
     
|WFD (national) typology=
     
|WFD water body name=
     
|Pre-project morphology=
     
|Reference morphology=
     
|Heavily modified water body=
     
|Local site designation=
     
|Site designation=
     
|Protected species present=
     
|Invasive species present=
     
|Species=
     
|Dominant hydrology=
     
|Dominant substrate=
     
|River corridor land use=
     
|Average bankfull channel width category=
     
|Avrg bankfull channel width=
     
|Average bankfull channel depth category=
     
|Avrg1 bankfull channel depth=
     
|Mean discharge category=
     
|Mn discharge=
     
|Average channel gradient category=
     
|Avrg channel gradient=
     
}}
}}
{{Project_background
{{Project background
|Reach length directly affected=
|Reach length directly affected=85 m
   
|Funding sources=S106 Seager
   
      85 m
|Project started=
     
|Works started=
     
|Works completed=
     
|Project completed=
     
|Total cost category=
     
|Total1 cost=
     
|Funding sources=
     
|Investigation and design cost category=
     
|Invst and design cost=
     
|Investigation and design Lead organisation=
     
|Investigation and design Other contact forename=
     
|Investigation and design Other contact surname=
     
|Stakeholder1 engagement cost category=
     
|stk engagement cost=
     
|Stakeholder engagement Lead organisation=
     
|Stakeholder engagement Other contact forename=
     
|Stakeholder engagement Other contact surname=
     
|Works1 and supervision cost category=
     
|Wrk and supervision cost=
     
|Works and supervision Lead organisation=
     
|Works and supervision Other contact forename=
     
|Works and supervision Other contact surname=
     
|Post-project1 management and maintenance cost category=
     
|Post-project2 management and maintenance cost=
     
|Post-project management and maintenance Lead organisation=
     
|Post-project management and maintenance Other contact forename=
     
|Post-project management and maintenance Other contact surname=
     
|Monitoring1 cost category=
     
|Monitoring2 cost=
     
|Monitoring Lead organisation=
     
|Monitoring Other contact forename=
     
|Monitoring Other contact surname=
     
|Supplementary funding information=
     
}}
}}
{{Motivations
{{Motivations
|Hydromorphological quality elements=
|Specific mitigation=Barriers to fish migration
   
|Hydromorphological quality elements=Channel pattern/planform, Quantity & dynamics of flow
   
|Other motivation=Community demand
     
|Biological quality elements=
     
|Physico-chemical quality elements=
     
|Specific mitigation=
     
|Other motivation=
     
}}
}}
{{Measures
{{Measures
|Bank and bed modifications measure=
|Bank and bed modifications measure=Bank reprofiling, Removing of concrete structures
   
   
     
|Floodplain / River corridor=
     
|Planform / Channel pattern=
     
|Other technical measure=
     
|Management interventions=
     
|Social measures=
     
|Wider stakeholder / citizen engagement=
     
}}
}}
{{Hydromorphological_quality_elements_header}}
{{Hydromorphological_quality_elements_header}}

Latest revision as of 10:52, 27 October 2015

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 51° 28' 22.65" N, 0° 1' 20.17" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Planned
Project web site
Themes Economic aspects, Fisheries, Habitat and biodiversity
Country England
Main contact forename Peter
Main contact surname Gray
Main contact user ID
Contact organisation Environment Agency
Contact organisation web site http://www.gov.uk/government/organisations/environment-agency
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Current state

Project summary

Edit project overview to modify the project summary.


The overall objective would be to restore the river channel throughout the park for the 85m length. Due to constraints set by DLR, this may mean leaving one river wall in place and up to half of the bed, however solutions will be available to soften both banks and generate a natural low flow channel. This is likely to be partially funded by the Seager Distillery section 106 agreement, however further funding will be required to complete the whole section of river. This site was cleared and developed into a public park, leaving an 8m boundary to the river for future river restoration works. The channel has a uniform concrete bed and banks and is semi-tidal. It is very shallow during low flow/low tide and could cause a barrier to fish migration. It is devoid of habitat. Start date governed by planning agreement (S106 Seager)

Monitoring surveys and results

Edit project overview to modify the Monitoring survey and results.


Pre-project data

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Thames
River basin London

Subcatchment

River name Ravensbourne (Catford to Deptford)
Area category 100 - 1000 km²
Area (km2)
Maximum altitude category 100 - 200 m
Maximum altitude (m) 132132 m <br />0.132 km <br />13,200 cm <br />
Dominant geology Calcareous
Ecoregion Great Britain
Dominant land cover Urban
Waterbody ID GB106039023270



Other case studies in this subcatchment: Catford Greyhound Stadium, Cornmill Gardens (QUERCUS), Ladywell Fields (QUERCUS), Ladywell Fields Phase 2, Ladywell Fields to Cornmill Gardens, Ladywell Fields toeboarding, Lewisham College weir, Linear Park, QUERCUS Ravensbourne, Ravensbourne Tescos... further results


Site

Name
WFD water body codes GB106039023270
WFD (national) typology
WFD water body name Ravensbourne (Catford to Deptford)
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 85 m0.085 km <br />8,500 cm <br />
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources S106 Seager

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure Barriers to fish migration
Hydromorphology Channel pattern/planform, Quantity & dynamics of flow
Biology
Physico-chemical
Other reasons for the project Community demand


Measures

Structural measures
Bank/bed modifications Bank reprofiling, Removing of concrete structures
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information