Case study:Colfes School: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
 
(17 intermediate revisions by 4 users not shown)
Line 1: Line 1:
{{Case_study_status
{{Case study status
|Approval status=
|Approval status=Approved
   
   
   
 
 
   
      Draft
}}
}}
{{Location
{{Location
Line 14: Line 7:
{{Project overview
{{Project overview
|Status=Planned
|Status=Planned
|Themes=Fisheries, Flood risk management, Habitat and biodiversity, Social benefits
|Country=England
|Country=England
|Main contact forename=Matthew
|Main contact forename=Matthew
|Main contact surname=Blumler
|Main contact surname=Blumler
|Partner organisations=This would be a collaborative project involving a partnership between local organisations and landowners, Green Chain, Walk, Environment Agency
|Multi-site=No
|Multi-site=No
|Project summary=Break river out of concrete channel, re-profile creating natural banks. Replace straightened course of the river with natural meanders. Allow more natural fluvial geomorphological processes to occur and increase habitat. Improved flood alleviation to downstream areas. Integrate with school sports facilities and buildings to provide educational facility for school that could be shared with others. Provide riverside walk to link existing river restorations in Chinbrook Meadows and Sutcliffe Park. Potential for extending the current GREEN CHAIN WALK through Chinbrook Meadows northwards into Greenwich and award winning Sutcliffe Park, alongside a naturalised urban river. Provide natural amenity and green pedestrian walk within urban environment. The Quaggy at this point lies within a straight concrete channel, inside a 6 metre strip enclosed by high fences. The fenced off strip runs through school and private playing fields. As a result the river is extremely degraded with poor aesthetic appeal, is devoid of geomorphological features of interest and has low ecological value. From the upper (southern) end it is possible to walk through largely green space to Chinbrook Meadows and a section of the Green Chain walk where the river was restored in 2002. From the lower (northern) end it is a short distance to Sutcliffe Park where the river was recently restored as part of a flood alleviation scheme. Enhancement would connect these two restored sections for wildlife and people, as well as providing new habitat and a direct educational facility within adjacent school playing fields.<br>Landowner details:<br>1. South section: Greenwich council – meadow. Approached and receptive. (Councillor Brian Woodcraft. Ward: Middle Park and Sutcliffe.)<br>2. Middle section and Left bank: Colfes school – playing fields and fenced off rough ground adjacent to river. Approached in 2005 – not receptive at that time<br>3. Middle and north section and right bank: Old Brockleians rugby club – playing fields and rough ground adjacent to the river. Approached and receptive. (Ron Tennant, previous president)<br>4. North section left bank: Possibly or previously Civil Service. Playing fields.<br>Key themes (Other):<br>1.) BAP. It will contribute towards the ‘Creating a Better Place’ objective to make proportionate progress towards BAP targets for wetland-related species and habitats’<br>2.) The works would also fall within the Agency’s duties as set out in the Environment Act 1995 to promote the conservation and enhancement of the natural beauty and amenity of inland and coastal waters and of land associated with such waters.<br>3) Green Chain Walks – Would create the possibility of extending the green chain walks with a new riverside walk linking the boroughs of Bromley, Lewisham and Greenwich.
|Project picture=Quaggy channelised 03.jpg
|Project summary=Break river out of concrete channel, re-profile creating natural banks. Replace straightened course of the river with natural meanders. Allow more natural fluvial geomorphological processes to occur and increase habitat. Improved flood alleviation to downstream areas. Integrate with school sports facilities and buildings to provide educational facility for school that could be shared with others. Provide riverside walk to link existing river restorations in Chinbrook Meadows and Sutcliffe Park. Potential for extending the current GREEN CHAIN WALK through Chinbrook Meadows northwards into Greenwich and award winning Sutcliffe Park, alongside a naturalised urban river. Provide natural amenity and green pedestrian walk within urban environment. The Quaggy at this point lies within a straight concrete channel, inside a 6 metre strip enclosed by high fences. The fenced off strip runs through school and private playing fields. As a result the river is extremely degraded with poor aesthetic appeal, is devoid of geomorphological features of interest and has low ecological value. From the upper (southern) end it is possible to walk through largely green space to Chinbrook Meadows and a section of the Green Chain walk where the river was restored in 2002. From the lower (northern) end it is a short distance to Sutcliffe Park where the river was recently restored as part of a flood alleviation scheme. Enhancement would connect these two restored sections for wildlife and people, as well as providing new habitat and a direct educational facility within adjacent school playing fields.<br>Landowner details:<br>1. South section: Greenwich council – meadow. Approached and receptive. (Councillor Brian Woodcraft. Ward: Middle Park and Sutcliffe.)<br>2. Middle section and Left bank: Colfes school – playing fields and fenced off rough ground adjacent to river. Approached in 2005 – not receptive at that time<br>3. Middle and north section and right bank: Old Brockleians rugby club – playing fields and rough ground adjacent to the river. Approached and receptive. (Ron Tennant, previous president)<br>4. North section left bank: Possibly or previously Civil Service. Playing fields.<br>Key themes (Other):<br>1.) BAP. It will contribute towards the ‘Creating a Better Place’ objective to make proportionate progress towards BAP targets for wetland-related species and habitats’<br>2.) The works would also fall within the Agency’s duties as set out in the Environment Act 1995 to promote the conservation and enhancement of the natural beauty and amenity of inland and coastal waters and of land associated with such waters.<br>3) Green Chain Walks – Would create the possibility of extending the green chain walks with a new riverside walk linking the boroughs of Bromley, Lewisham and Greenwich.<br>Requires the agreement and cooperation of four landowners, including Colfes school. Of these one, Colfes school, was not receptive three years ago when approached in 2005. Sensitivity regarding playing fields, although these do not go right to the edge of the current river course.
}}
}}
{{Image_gallery}}
{{Image_gallery}}
Line 24: Line 20:
{{Toggle_button}}
{{Toggle_button}}
{{Toggle_content_start}}
{{Toggle_content_start}}
{{Case_study_subcatchment
{{Case study subcatchment
|Subcatchment=
|Subcatchment=Quaggy
   
   
   
   
   
   
     
}}
}}
{{Site
{{Site
|Name=
|WFD water body code=GB106039023290
   
|WFD water body name=Quaggy
   
|Heavily modified water body=No
     
|Protected species present=No
|WFD water body code=
|Invasive species present=No
     
|WFD (national) typology=
     
|WFD water body name=
     
|Pre-project morphology=
     
|Reference morphology=
     
|Heavily modified water body=
     
|Local site designation=
     
|Site designation=
     
|Protected species present=
     
|Invasive species present=
     
|Species=
     
|Dominant hydrology=
     
|Dominant substrate=
     
|River corridor land use=
     
|Average bankfull channel width category=
     
|Avrg bankfull channel width=
     
|Average bankfull channel depth category=
     
|Avrg1 bankfull channel depth=
     
|Mean discharge category=
     
|Mn discharge=
     
|Average channel gradient category=
     
|Avrg channel gradient=
     
}}
}}
{{Project_background
{{Project background
|Reach length directly affected=
|Reach length directly affected=750 m
   
|Project started=2008/01/01
   
|Total cost category=500 - 1000 k€
      750 m
|Project started=
      2008/01/01
|Works started=
     
|Works completed=
     
|Project completed=
     
|Total cost category=
     
|Total1 cost=
     
|Funding sources=
     
|Investigation and design cost category=
     
|Invst and design cost=
     
|Investigation and design Lead organisation=
     
|Investigation and design Other contact forename=
     
|Investigation and design Other contact surname=
     
|Stakeholder1 engagement cost category=
     
|stk engagement cost=
     
|Stakeholder engagement Lead organisation=
     
|Stakeholder engagement Other contact forename=
     
|Stakeholder engagement Other contact surname=
     
|Works1 and supervision cost category=
     
|Wrk and supervision cost=
     
|Works and supervision Lead organisation=
     
|Works and supervision Other contact forename=
     
|Works and supervision Other contact surname=
     
|Post-project1 management and maintenance cost category=
     
|Post-project2 management and maintenance cost=
     
|Post-project management and maintenance Lead organisation=
     
|Post-project management and maintenance Other contact forename=
     
|Post-project management and maintenance Other contact surname=
     
|Monitoring1 cost category=
     
|Monitoring2 cost=
     
|Monitoring Lead organisation=
     
|Monitoring Other contact forename=
     
|Monitoring Other contact surname=
     
|Supplementary funding information=
     
}}
}}
{{Motivations
{{Motivations
|Hydromorphological quality elements=
|Specific mitigation=Flood risk management, Urbanisation
   
|Hydromorphological quality elements=Channel pattern/planform
   
|Other motivation=Recreation
     
|Biological quality elements=
     
|Physico-chemical quality elements=
     
|Specific mitigation=
     
|Other motivation=
     
}}
}}
{{Measures
{{Measures
|Bank and bed modifications measure=
|Bank and bed modifications measure=Bank reprofiling, Removing of concrete structures,
   
|Planform / Channel pattern=Creation of meanders,
   
|Social measures=Aesthetics, Improved public access, Community Education,
     
|Floodplain / River corridor=
     
|Planform / Channel pattern=
     
|Other technical measure=
     
|Management interventions=
     
|Social measures=
     
|Wider stakeholder / citizen engagement=
     
}}
}}
{{Hydromorphological_quality_elements_header}}
{{Hydromorphological_quality_elements_header}}

Latest revision as of 16:47, 2 January 2019

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 51° 26' 40.69" N, 0° 1' 49.48" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Planned
Project web site
Themes Fisheries, Flood risk management, Habitat and biodiversity, Social benefits
Country England
Main contact forename Matthew
Main contact surname Blumler
Main contact user ID
Contact organisation
Contact organisation web site
Partner organisations This would be a collaborative project involving a partnership between local organisations and landowners, Green Chain, Walk, Environment Agency
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Project picture

Project summary

Edit project overview to modify the project summary.


Break river out of concrete channel, re-profile creating natural banks. Replace straightened course of the river with natural meanders. Allow more natural fluvial geomorphological processes to occur and increase habitat. Improved flood alleviation to downstream areas. Integrate with school sports facilities and buildings to provide educational facility for school that could be shared with others. Provide riverside walk to link existing river restorations in Chinbrook Meadows and Sutcliffe Park. Potential for extending the current GREEN CHAIN WALK through Chinbrook Meadows northwards into Greenwich and award winning Sutcliffe Park, alongside a naturalised urban river. Provide natural amenity and green pedestrian walk within urban environment. The Quaggy at this point lies within a straight concrete channel, inside a 6 metre strip enclosed by high fences. The fenced off strip runs through school and private playing fields. As a result the river is extremely degraded with poor aesthetic appeal, is devoid of geomorphological features of interest and has low ecological value. From the upper (southern) end it is possible to walk through largely green space to Chinbrook Meadows and a section of the Green Chain walk where the river was restored in 2002. From the lower (northern) end it is a short distance to Sutcliffe Park where the river was recently restored as part of a flood alleviation scheme. Enhancement would connect these two restored sections for wildlife and people, as well as providing new habitat and a direct educational facility within adjacent school playing fields.
Landowner details:
1. South section: Greenwich council – meadow. Approached and receptive. (Councillor Brian Woodcraft. Ward: Middle Park and Sutcliffe.)
2. Middle section and Left bank: Colfes school – playing fields and fenced off rough ground adjacent to river. Approached in 2005 – not receptive at that time
3. Middle and north section and right bank: Old Brockleians rugby club – playing fields and rough ground adjacent to the river. Approached and receptive. (Ron Tennant, previous president)
4. North section left bank: Possibly or previously Civil Service. Playing fields.
Key themes (Other):
1.) BAP. It will contribute towards the ‘Creating a Better Place’ objective to make proportionate progress towards BAP targets for wetland-related species and habitats’
2.) The works would also fall within the Agency’s duties as set out in the Environment Act 1995 to promote the conservation and enhancement of the natural beauty and amenity of inland and coastal waters and of land associated with such waters.
3) Green Chain Walks – Would create the possibility of extending the green chain walks with a new riverside walk linking the boroughs of Bromley, Lewisham and Greenwich.
Requires the agreement and cooperation of four landowners, including Colfes school. Of these one, Colfes school, was not receptive three years ago when approached in 2005. Sensitivity regarding playing fields, although these do not go right to the edge of the current river course.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Thames
River basin London

Subcatchment

River name Quaggy
Area category 10 - 100 km²
Area (km2)
Maximum altitude category 100 - 200 m
Maximum altitude (m) 135135 m <br />0.135 km <br />13,500 cm <br />
Dominant geology Calcareous
Ecoregion Great Britain
Dominant land cover Suburban
Waterbody ID GB106039023290



Other case studies in this subcatchment: Lidl, Manor House Gardens, Manor House Gardens Gauging Station, Manor Park, Mottingham Farm, Quaggy Flood Alleviation Scheme, Quaggy channel improvements, River Quaggy- Chinbrook meadows, Sutcliffe Park, Sydenham Cottages Nature Reserve


Site

Name
WFD water body codes GB106039023290
WFD (national) typology
WFD water body name Quaggy
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 750 m0.75 km <br />75,000 cm <br />
Project started 2008/01/01
Works started
Works completed
Project completed
Total cost category 500 - 1000 k€
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure Flood risk management, Urbanisation
Hydromorphology Channel pattern/planform
Biology
Physico-chemical
Other reasons for the project Recreation


Measures

Structural measures
Bank/bed modifications Bank reprofiling, Removing of concrete structures
Floodplain / River corridor
Planform / Channel pattern Creation of meanders
Other
Non-structural measures
Management interventions
Social measures (incl. engagement) Aesthetics, Improved public access, Community Education
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information