Case study:Fairlop Plain and Fairlop Water: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
Hazel Wilson (talk | contribs) No edit summary |
||
(6 intermediate revisions by 2 users not shown) | |||
Line 13: | Line 13: | ||
}} | }} | ||
{{Project overview | {{Project overview | ||
|Status= | |Status=Planned | ||
|Themes=Habitat and biodiversity | |||
|Country=England | |Country=England | ||
|Main contact forename= | |Main contact forename=Environment | ||
|Main contact surname= | |Main contact surname=Agency | ||
|Contact organisation=Environment Agency | |Contact organisation=Environment Agency | ||
|Contact organisation url=www.gov.uk/government/organisations/environment-agency | |Contact organisation url=www.gov.uk/government/organisations/environment-agency | ||
Line 26: | Line 27: | ||
{{Toggle_button}} | {{Toggle_button}} | ||
{{Toggle_content_start}} | {{Toggle_content_start}} | ||
{{ | {{Case study subcatchment | ||
|Subcatchment= | |Subcatchment=Seven Kings Water | ||
}} | }} | ||
{{Site | {{Site | ||
|WFD water body code=GB106037028170 | |||
|WFD water body name=Seven Kings Water | |||
|Heavily modified water body=No | |||
|Protected species present=No | |||
|WFD water body code= | |Invasive species present=No | ||
|WFD water body name= | |||
|Heavily modified water body= | |||
|Protected species present= | |||
|Invasive species present= | |||
}} | }} | ||
{{Project_background | {{Project_background | ||
Line 159: | Line 110: | ||
}} | }} | ||
{{Motivations | {{Motivations | ||
|Specific mitigation=Urbanisation | |||
|Specific mitigation= | |||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Deculverting, Removing of concrete structures | ||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} |
Latest revision as of 17:16, 23 February 2016
This case study is pending approval by a RiverWiki administrator.
Location: 51° 36' 41.72" N, 0° 7' 31.25" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Planned |
---|---|
Project web site | |
Themes | Habitat and biodiversity |
Country | England |
Main contact forename | Environment |
Main contact surname | Agency |
Main contact user ID | |
Contact organisation | Environment Agency |
Contact organisation web site | http://www.gov.uk/government/organisations/environment-agency |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
Edit project overview to modify the project summary.
Potential for deculverting of Loxford Water in park. Loxford Water is heavily urbanised, degraded and a in a concrete culvert for the most of its length.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Blake Avenue, Mayes Brook, County Gardens, Mayes Brook, Goodmayes Park, Mayes Brook, Loxford Water, Mayesbrook Climate Change Park restoration project, Seven Kings Water
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|