Case study:Ferry Lane North drainage realignment: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
(10 intermediate revisions by 3 users not shown) | |||
Line 14: | Line 14: | ||
{{Project overview | {{Project overview | ||
|Status=Complete | |Status=Complete | ||
|Themes=Habitat and biodiversity, Social benefits | |||
|Country=England | |Country=England | ||
|Main contact forename=Jennifer | |Main contact forename=Jennifer | ||
|Main contact surname=Norman | |Main contact surname=Norman | ||
|Partner organisations=LTGDC, London Borough of Havering, London Riverside BID | |||
|Multi-site=No | |Multi-site=No | ||
|Project summary=Realignment of existing ditch from western side to eastern side of Ferry Lane North in Rainham. Reasons for enhancements:<br>Access and | |Project summary=Realignment of existing ditch from western side to eastern side of Ferry Lane North in Rainham. Reasons for enhancements:<br>Access and biodiversity.<br>Improvement of habitat (now forms part of SSSI at Rainham)<br>Reduction in pollution risk (have removed opportunity for pollution from neighbouring industrial uses) | ||
}} | }} | ||
{{Image_gallery}} | {{Image_gallery}} | ||
Line 24: | Line 26: | ||
{{Toggle_button}} | {{Toggle_button}} | ||
{{Toggle_content_start}} | {{Toggle_content_start}} | ||
{{ | {{Case study subcatchment | ||
|Subcatchment= | |Subcatchment=Southall Sewer and Runningwater Brook (Ingrebourne) | ||
}} | }} | ||
{{Site | {{Site | ||
|WFD water body code=GB106037028090 | |||
|WFD water body name=Southall Sewer and Runningwater Brook (Ingrebourne) | |||
|Heavily modified water body=No | |||
|Protected species present=No | |||
|WFD water body code= | |Invasive species present=No | ||
|WFD water body name= | |||
|Heavily modified water body= | |||
|Protected species present= | |||
|Invasive species present= | |||
}} | }} | ||
{{ | {{Project background | ||
|Reach length directly affected= | |Reach length directly affected=400 m | ||
|Works completed=2009/01/01 | |||
|Funding sources=LTGDC grant for FLN project | |||
|Works completed= | |||
|Funding sources= | |||
}} | }} | ||
{{Motivations | {{Motivations | ||
|Specific mitigation=Pollution incident | |||
|Other motivation=Community demand | |||
|Specific mitigation= | |||
|Other motivation= | |||
}} | }} | ||
{{Measures | {{Measures | ||
|Social measures=Improved public access | |||
|Social measures= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} |
Latest revision as of 12:52, 5 November 2018
This case study is pending approval by a RiverWiki administrator.
Location: 51° 30' 52.76" N, 0° 11' 15.92" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Habitat and biodiversity, Social benefits |
Country | England |
Main contact forename | Jennifer |
Main contact surname | Norman |
Main contact user ID | |
Contact organisation | |
Contact organisation web site | |
Partner organisations | LTGDC, London Borough of Havering, London Riverside BID |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
Edit project overview to modify the project summary.
Realignment of existing ditch from western side to eastern side of Ferry Lane North in Rainham. Reasons for enhancements:
Access and biodiversity.
Improvement of habitat (now forms part of SSSI at Rainham)
Reduction in pollution risk (have removed opportunity for pollution from neighbouring industrial uses)
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Rainham Marshes
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|