Case study:Day Brook Restoration - Gedling: Difference between revisions
No edit summary |
No edit summary |
||
(8 intermediate revisions by 4 users not shown) | |||
Line 7: | Line 7: | ||
}} | }} | ||
{{Project overview | {{Project overview | ||
|Status= | |Status=Complete | ||
|Themes=Flood risk management, Habitat and biodiversity, Urban | |Themes=Flood risk management, Habitat and biodiversity, Urban | ||
|Country=England | |Country=England | ||
Line 17: | Line 17: | ||
|Partner organisations=Groundwork Greater Nottingham, Environment Agency, Nottinghamshire County Council, Gedling Borough Council | |Partner organisations=Groundwork Greater Nottingham, Environment Agency, Nottinghamshire County Council, Gedling Borough Council | ||
|Multi-site=No | |Multi-site=No | ||
|Project summary=This project | |Project picture=New channel 9 May 2014.JPG | ||
|Project summary=This project restored natural features to a section of the Day Brook as it flows through a small park on the outskirts of Nottingham city. | |||
The brook | The brook was moved from the existing heavily modified and shaded channel into a more natural course. Brook length has been increased with the introduction of meanders along with shallower, soft banks and variation in flow and bed conditions. We aim to improve water quality through the planting of marginal vegetation and the creation of a reed bed at the outfall of a surface water sewer. | ||
With the material produced from the channel excavations, a shallow bund has been constructed to retain flood waters within the park in order to help reduce flooding of downstream properties. | With the material produced from the channel excavations, a shallow bund has been constructed to retain flood waters within the park in order to help reduce flooding of downstream properties. | ||
In an effort to raise awareness of the watercourse and to create a more attractive park environment, 2 new bridges | In an effort to raise awareness of the watercourse and to create a more attractive park environment, 2 new bridges now take an existing path over the new brook channel. | ||
This part of the brook is one of the few sections not within a culvert as it flows through Gedling Borough. | This part of the brook is one of the few sections not within a culvert as it flows through Gedling Borough. Downstream the brook mostly flows within a heavily modified channel and the entire length is subject to pollution from diffuse, urban sources. | ||
This project is a sister project to the Day Brook rain gardens - http://restorerivers.eu/wiki/index.php?title=Case_study%3ADay_Brook_Rain_Gardens | This project is a sister project to the Day Brook rain gardens - http://restorerivers.eu/wiki/index.php?title=Case_study%3ADay_Brook_Rain_Gardens | ||
Restoration work commenced in February 2014. | Restoration work commenced in February 2014 and was completed in May 2014. | ||
Photos of the works are available at https://www.flickr.com/photos/environment-agency/sets/72157644692138259/?view=sq. | |||
Increase community awareness of urban catchment challenges. | |||
}} | }} | ||
{{Image gallery}} | {{Image gallery}} | ||
Line 44: | Line 49: | ||
|Caption=Day Brook construction | |Caption=Day Brook construction | ||
}} | }} | ||
{{Case study image | |||
|File name=New channel and reed bed 23 April 2014.JPG | |||
}} | |||
{{Image gallery end}} | {{Image gallery end}} | ||
{{Toggle button}} | {{Toggle button}} | ||
Line 51: | Line 58: | ||
|Subcatchment=Day Brook from Source to River Lean | |Subcatchment=Day Brook from Source to River Lean | ||
}} | }} | ||
{{Site}} | {{Site | ||
|WFD water body code=GB104028052860 | |||
|WFD water body name=Day Brook from Source to River Lean | |||
|Heavily modified water body=No | |||
|Protected species present=No | |||
|Invasive species present=No | |||
}} | |||
{{Project background | {{Project background | ||
|Reach length directly affected=115 | |Reach length directly affected=115 | ||
Line 76: | Line 89: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure=Channel reprofiling, Recovery of channel morphology, | |Bank and bed modifications measure=Channel reprofiling, Recovery of channel morphology, | ||
|Floodplain / River corridor=Floodplain reconnection, | |Floodplain / River corridor=Floodplain reconnection, | ||
|Planform / Channel pattern=Channel naturalisation, Re-meandering, | |Planform / Channel pattern=Channel naturalisation, Re-meandering, | ||
|Social measures= | |Social measures=Awareness raising, | ||
}} | }} | ||
{{Hydromorphological quality elements header}} | {{Hydromorphological quality elements header}} |
Latest revision as of 11:49, 5 June 2017
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Flood risk management, Habitat and biodiversity, Urban |
Country | England |
Main contact forename | John |
Main contact surname | Brewington |
Main contact user ID | User:John Brewington |
Contact organisation | Environment Agency |
Contact organisation web site | http://www.environment-agency.gov.uk |
Partner organisations | Groundwork Greater Nottingham, Environment Agency, Nottinghamshire County Council, Gedling Borough Council |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
This project restored natural features to a section of the Day Brook as it flows through a small park on the outskirts of Nottingham city.
The brook was moved from the existing heavily modified and shaded channel into a more natural course. Brook length has been increased with the introduction of meanders along with shallower, soft banks and variation in flow and bed conditions. We aim to improve water quality through the planting of marginal vegetation and the creation of a reed bed at the outfall of a surface water sewer.
With the material produced from the channel excavations, a shallow bund has been constructed to retain flood waters within the park in order to help reduce flooding of downstream properties.
In an effort to raise awareness of the watercourse and to create a more attractive park environment, 2 new bridges now take an existing path over the new brook channel.
This part of the brook is one of the few sections not within a culvert as it flows through Gedling Borough. Downstream the brook mostly flows within a heavily modified channel and the entire length is subject to pollution from diffuse, urban sources.
This project is a sister project to the Day Brook rain gardens - http://restorerivers.eu/wiki/index.php?title=Case_study%3ADay_Brook_Rain_Gardens
Restoration work commenced in February 2014 and was completed in May 2014.
Photos of the works are available at https://www.flickr.com/photos/environment-agency/sets/72157644692138259/?view=sq.
Increase community awareness of urban catchment challenges.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Day Brook Rain Gardens
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|