Case study:Petersham Meadows: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
(12 intermediate revisions by 2 users not shown) | |||
Line 12: | Line 12: | ||
|Location=51.4497261047363, -0.303097039461136 | |Location=51.4497261047363, -0.303097039461136 | ||
}} | }} | ||
{{ | {{Project overview | ||
|Status= | |Status=Planned | ||
|Themes=Flood risk management, Habitat and biodiversity | |||
|Country=England | |||
|Main contact forename=Joanna | |||
|Main contact surname=Heisse | |||
|Contact organisation=Environment Agency | |||
|Themes= | |Contact organisation url=www.gov.uk/government/organisations/environment-agency | ||
|Partner organisations=Thames Landscape Strategy, National Trust, | |||
|Country= | |Multi-site=No | ||
|Project summary=Digging of wader scrapes as part of land raising to ensure dry route during high tides.<br> | |||
|Main contact forename= | Early preparation stage (August 2010 LRAP update) | ||
|Main contact surname= | |||
|Contact organisation= | |||
|Contact organisation url= | |||
|Partner organisations= | |||
|Multi-site= | |||
|Project summary= | |||
}} | }} | ||
{{Image_gallery}} | {{Image_gallery}} | ||
Line 50: | Line 29: | ||
{{Toggle_button}} | {{Toggle_button}} | ||
{{Toggle_content_start}} | {{Toggle_content_start}} | ||
{{ | {{Case study subcatchment | ||
|Subcatchment= | |Subcatchment=Thames (London) | ||
}} | }} | ||
{{Site | {{Site | ||
|Name= | |Name=River Thames | ||
|Heavily modified water body=No | |||
|Protected species present=No | |||
|Invasive species present=No | |||
|Heavily modified water body= | |||
|Protected species present= | |||
|Invasive species present= | |||
}} | }} | ||
{{Project_background | {{Project_background | ||
Line 183: | Line 111: | ||
}} | }} | ||
{{Motivations | {{Motivations | ||
|Other motivation=Landscape enhancement | |||
|Other motivation= | |||
}} | }} | ||
{{Measures | {{Measures | ||
|Floodplain / River corridor=Scrapes | |||
|Floodplain / River corridor= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} |
Latest revision as of 15:33, 6 June 2017
This case study is pending approval by a RiverWiki administrator.
Location: 51° 26' 59.01" N, 0° 18' 11.15" W
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Planned |
---|---|
Project web site | |
Themes | Flood risk management, Habitat and biodiversity |
Country | England |
Main contact forename | Joanna |
Main contact surname | Heisse |
Main contact user ID | |
Contact organisation | Environment Agency |
Contact organisation web site | http://www.gov.uk/government/organisations/environment-agency |
Partner organisations | Thames Landscape Strategy, National Trust |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
Edit project overview to modify the project summary.
Digging of wader scrapes as part of land raising to ensure dry route during high tides.
Early preparation stage (August 2010 LRAP update)
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Subcatchment:Thames (London) Other case studies in this subcatchment: Bullhead Dock and Bellamy’s Wharf - Rotherhithe
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|