Case study:Barnes Common improvements: Difference between revisions
No edit summary |
No edit summary |
||
(17 intermediate revisions by 6 users not shown) | |||
Line 1: | Line 1: | ||
{{ | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
|Location=51.4708992, -0.24469569999996565 | |Location=51.4708992, -0.24469569999996565 | ||
}} | }} | ||
{{ | {{Project overview | ||
|Status= | |Status=Complete | ||
|Themes=Fisheries, Habitat and biodiversity, Hydromorphology, Urban | |||
|Country=England | |||
|Main contact forename=Dave | |||
|Main contact surname=Webb | |||
|Contact organisation=Environment Agency | |||
|Themes= | |Contact organisation url=www.gov.uk/government/organisations/environment-agency | ||
|Partner organisations=Friends of Barnes Common, London Borough of Richmond upon Thames, | |||
|Country= | |Multi-site=No | ||
|Project picture=Reed Bed May-2011.jpg | |||
|Main contact forename= | |Picture description=Reed bed - May 2011 | ||
|Project summary=To improve the riparian through with an improved mowing regime<br> | |||
|Main contact surname= | Plug planting of marginal species<br> | ||
Selective tree management to allow more light into the channel<br> | |||
Potential to dig a new meander<br> | |||
Enlarge the off-line reedbed to create a backwater for spawning fish and habitat value<br> | |||
|Contact organisation= | Put flow deflectors in the channel to improve in stream processes<br> | ||
|Contact organisation url= | The Beverley Brook flows through Barnes Common and has artificially low flows, little in channel habitat and no riparian buffer zones. An off-reed bed has been dug which was successful. | ||
}} | |||
|Partner organisations= | {{Image gallery}} | ||
{{Case study image | |||
|Multi-site= | |File name=Barnes common enhancements Dec 2011.pdf | ||
|Caption=Barnes Common Enhancement Dec 2011 | |||
|Project picture= | |||
|Picture description= | |||
|Project summary= | |||
}} | }} | ||
{{Image_gallery_end}} | {{Image_gallery_end}} | ||
{{Toggle_button}} | {{Toggle_button}} | ||
{{Toggle_content_start}} | {{Toggle_content_start}} | ||
{{ | {{Case study subcatchment | ||
|Subcatchment= | |Subcatchment=Beverley Brook (Motspur Park to Thames) and Pyl Brook at West Barnes | ||
}} | }} | ||
{{Site | {{Site | ||
|WFD water body code=GB106039022850 | |||
|WFD water body name=Beverley Brook (Motspur Park to Thames) and Pyl Brook at West Barnes | |||
|Heavily modified water body=No | |||
|Protected species present=No | |||
|WFD water body code= | |Invasive species present=No | ||
|WFD water body name= | |||
|Heavily modified water body= | |||
|Protected species present= | |||
|Invasive species present= | |||
}} | }} | ||
{{ | {{Project background | ||
|Reach length directly affected= | |Reach length directly affected=300 m | ||
|Project completed=2011/12/20 | |||
|Project completed= | |||
}} | }} | ||
{{Motivations | {{Motivations | ||
|Biological quality elements=little in channel habitat, no riparian buffer zones | |||
|Biological quality elements= | |||
}} | }} | ||
{{Measures | {{Measures | ||
|Floodplain / River corridor=Tree management, Riparian planting, mowing regime | |||
|Planform / Channel pattern=Reedbed creation, Flow deflectors, | |||
|Floodplain / River corridor= | |||
|Planform / Channel pattern= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} |
Latest revision as of 15:16, 6 June 2017
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Fisheries, Habitat and biodiversity, Hydromorphology, Urban |
Country | England |
Main contact forename | Dave |
Main contact surname | Webb |
Main contact user ID | |
Contact organisation | Environment Agency |
Contact organisation web site | http://www.gov.uk/government/organisations/environment-agency |
Partner organisations | Friends of Barnes Common, London Borough of Richmond upon Thames |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
To improve the riparian through with an improved mowing regime
Plug planting of marginal species
Selective tree management to allow more light into the channel
Potential to dig a new meander
Enlarge the off-line reedbed to create a backwater for spawning fish and habitat value
Put flow deflectors in the channel to improve in stream processes
The Beverley Brook flows through Barnes Common and has artificially low flows, little in channel habitat and no riparian buffer zones. An off-reed bed has been dug which was successful.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Anton Crescent Wetlands Regeneration, Ashlone Wharf FCRM scheme, Barn Elms Sports Ground, Barn Elms Wetland Centre, South West London, Barnes Common, Beverley Brook Flow control structures, Beverley Brook d/s of Rock’s Lane, Beverley Park, Cuddington Park, Horne Way Weir... further results
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|