Case study:Darent Valley Path: Difference between revisions
(XML import) |
No edit summary |
||
(12 intermediate revisions by 3 users not shown) | |||
Line 10: | Line 10: | ||
}} | }} | ||
{{Location | {{Location | ||
|Location= | |Location=51.4348754882812, 0.224731355905533 | ||
}} | }} | ||
{{ | {{Project overview | ||
|Status= | |Status=Planned | ||
|Themes=Economic aspects, Habitat and biodiversity | |||
|Country=England | |||
|Main contact forename=Emma | |||
|Main contact surname=Hazard | |||
|Multi-site=No | |||
|Themes= | |Project summary=To re-distribute the existing bed material to create meanders, pool - riffle sequences, gravel bars and islands. The aim is to acheive a chalk river with a variety of habitats within a low-flow, self cleansing, sinuous channel. Improve fish spawning habitat. The river in this location is generally flat, wide and shallow and under normal discharge it cannot sustain energised flow. Additionally, the channel is extremely heavily shaded in parts, preventing aquatic plant growth. There is very little in-channel natural habitat variation and the river has no ability to re-habilitate itself and re-establish chalk stream habitat. <br> | ||
|Country= | Funding - Environment Agency Working in partnership with Dartford Borough Council who are upgrading the footpath alongside the river. | ||
|Main contact forename= | |||
|Main contact surname= | |||
|Multi-site= | |||
| | |||
}} | }} | ||
{{Image_gallery}} | {{Image_gallery}} | ||
Line 53: | Line 27: | ||
{{Toggle_button}} | {{Toggle_button}} | ||
{{Toggle_content_start}} | {{Toggle_content_start}} | ||
{{ | {{Case study subcatchment | ||
|Subcatchment= | |Subcatchment=Mid Darent | ||
}} | }} | ||
{{Site | {{Site | ||
|WFD water body code=GB106040024222 | |||
|WFD water body name=Mid Darent | |||
|Heavily modified water body=No | |||
|Protected species present=No | |||
|WFD water body code= | |Invasive species present=No | ||
|WFD water body name= | |||
|Heavily modified water body= | |||
|Protected species present= | |||
|Invasive species present= | |||
}} | }} | ||
{{ | {{Project background | ||
|Reach length directly affected= | |Reach length directly affected=900 m | ||
|Project started=2011/01/01 | |||
|Total cost category=10 - 50 k€ | |||
|Funding sources=Environment Agency, Dartford Borough Council | |||
|Project started= | |||
|Total cost category= | |||
|Funding sources= | |||
}} | }} | ||
{{Motivations | {{Motivations | ||
|Hydromorphological quality elements= | |Hydromorphological quality elements=Channel pattern/planform, Quantity & dynamics of flow, Substrate conditions | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Bank reprofiling | ||
|Planform / Channel pattern=Creation of meanders | |||
|Planform / Channel pattern= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} |
Latest revision as of 12:54, 1 November 2018
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Planned |
---|---|
Project web site | |
Themes | Economic aspects, Habitat and biodiversity |
Country | England |
Main contact forename | Emma |
Main contact surname | Hazard |
Main contact user ID | |
Contact organisation | |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
To re-distribute the existing bed material to create meanders, pool - riffle sequences, gravel bars and islands. The aim is to acheive a chalk river with a variety of habitats within a low-flow, self cleansing, sinuous channel. Improve fish spawning habitat. The river in this location is generally flat, wide and shallow and under normal discharge it cannot sustain energised flow. Additionally, the channel is extremely heavily shaded in parts, preventing aquatic plant growth. There is very little in-channel natural habitat variation and the river has no ability to re-habilitate itself and re-establish chalk stream habitat.
Funding - Environment Agency Working in partnership with Dartford Borough Council who are upgrading the footpath alongside the river.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Lullingstone Castle, Lullingstone Castle phase 2, River Darent at Hawley Manor
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|