User:NickRRC: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
(18 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{User page|realName=Nick Elbourne|name=NickRRC}} | {{User page|realName=Nick Elbourne|name=NickRRC}} | ||
==Data quality report | ==Data quality report CSV1 - Project background== | ||
{{#ask:[[Category:Case study]] | {{#ask:[[Category:Case study]] | ||
|?Location | |?Location | ||
|?Project status | |?Project status | ||
|?Approval status | |||
|?Kml file | |||
|?Project rating | |||
|?Project web site url | |?Project web site url | ||
|? | |?Themes | ||
|?Main contact forename | |?Main contact forename | ||
|?Main contact surname | |?Main contact surname | ||
|?Main contact | |?Main contact id | ||
|?Contact organisation | |?Contact organisation | ||
|?Contact organisation url | |?Contact organisation url | ||
|?Partner organisations | |?Partner organisations | ||
|? | |?Multi-site | ||
|?Project picture | |?Project picture | ||
|?Picture description | |?Picture description | ||
Line 21: | Line 23: | ||
|?Monitoring surveys and results | |?Monitoring surveys and results | ||
|?Lessons learnt | |?Lessons learnt | ||
|?Country | |?Country | ||
|?Modification date | |||
|format=csv | |||
|offset=0 | |||
|limit=750 | |||
|mainlabel= | |||
|sep=, | |||
}} | |||
==Data quality report CSV2 - Catchment/site information== | |||
{{#ask:[[Category:Case study]] | |||
|?River basin district | |?River basin district | ||
|?River basin | |?River basin | ||
|?River name | |?River name | ||
|?Area category | |?Area category | ||
|?Area | |?Area | ||
|?Maximum altitude category | |?Maximum altitude category | ||
|?Maximum altitude | |?Maximum altitude | ||
|?Dominant geology | |?Dominant geology | ||
|?Ecoregion | |?Ecoregion | ||
Line 35: | Line 47: | ||
|?Waterbody ID | |?Waterbody ID | ||
|?Name | |?Name | ||
|?WFD | |?WFD water body code | ||
|?WFD (national typology) | |?WFD (national typology) | ||
|?Pre-project morphology | |?Pre-project morphology | ||
Line 41: | Line 53: | ||
|?Desired post project morphology | |?Desired post project morphology | ||
|?Heavily modified water body | |?Heavily modified water body | ||
|?National/international site | |?National/international site designation | ||
|?Local/regional site designations | |?Local/regional site designations | ||
|?Protected species present | |?Protected species present | ||
|?Invasive species present | |?Invasive species present | ||
|?Species | |?Species | ||
|?Dominant hydrology | |?Dominant hydrology | ||
|?Dominant substrate | |?Dominant substrate | ||
|?River corridor land use | |?River corridor land use | ||
|?Average bankfull channel width category | |?Average bankfull channel width category | ||
|?Average bankfull channel width | |?Average bankfull channel width | ||
|?Average bankfull channel depth category | |?Average bankfull channel depth category | ||
|?Avarage bankfull channel depth | |?Avarage bankfull channel depth | ||
|?Mean discharge category | |?Mean discharge category | ||
|?Mean annual discharge | |?Mean annual discharge | ||
|?Average channel gradient category | |?Average channel gradient category | ||
|?Average channel gradient | |?Average channel gradient | ||
|?Average unit stream power | |?Average unit stream power | ||
|?Reach length directly affected | |?Reach length directly affected | ||
|format=csv | |||
|offset=0 | |||
|limit=500 | |||
|mainlabel= | |||
|sep=, | |||
}} | |||
==Data quality report CSV3 - Dates, cost and project team== | |||
{{#ask:[[Category:Case study]] | |||
|?Project started | |?Project started | ||
|?Works started | |?Works started | ||
Line 64: | Line 86: | ||
|?Project completed | |?Project completed | ||
|?Total cost category | |?Total cost category | ||
|?Total cost | |?Total cost | ||
|?Benefit to cost ratio | |?Benefit to cost ratio | ||
|?Funding sources | |?Funding sources | ||
|?Investigation and design - Cost category | |?Investigation and design - Cost category | ||
|?Investigation and design - Cost exact | |?Investigation and design - Cost exact | ||
|?Investigation and design - Lead organisation | |?Investigation and design - Lead organisation | ||
|?Investigation and design - | |?Investigation and design - Other contact forename | ||
|?Investigation and design - | |?Investigation and design - Other contact surname | ||
|?Stakeholder engagement and communication - Cost category (k€) | |?Stakeholder engagement and communication - Cost category (k€) | ||
|?Stakeholder engagement and communication - Cost exact (k€) | |?Stakeholder engagement and communication - Cost exact (k€) | ||
Line 87: | Line 109: | ||
|?Post-project management and maintenance - Contact forename | |?Post-project management and maintenance - Contact forename | ||
|?Post-project management and maintenance - Contact surname | |?Post-project management and maintenance - Contact surname | ||
|?Monitoring - Cost category | |format=csv | ||
|?Monitoring - Cost exact | |offset=0 | ||
|limit=750 | |||
|mainlabel= | |||
|sep=, | |||
}} | |||
==Data quality report CSV4 - Monitoring and other information== | |||
{{#ask:[[Category:Case study]] | |||
|?Monitoring - Cost category | |||
|?Monitoring - Cost exact | |||
|?Monitoring - Lead organisation | |?Monitoring - Lead organisation | ||
|?Monitoring - Contact forename | |?Monitoring - Contact forename | ||
|?Monitoring - Contact surname | |?Monitoring - Contact surname | ||
|?Mitigation of a pressure | |?Mitigation of a pressure | ||
|?Hydromorphological quality motivation | |?Hydromorphological quality motivation | ||
|?Biological quality motivation | |?Biological quality motivation | ||
Line 125: | Line 136: | ||
|?Social measure | |?Social measure | ||
|?Wider engagement measure | |?Wider engagement measure | ||
|? | |?Biological quality element monitored | ||
|?Hydromorphological quality element monitored | |||
|?Physico-chemical quality element monitored | |||
|?Other response monitored | |||
|?Monitoring documents | |||
|?Additional documents and videos | |||
|?Additional links and references | |||
|?Supplementary information | |||
|format=csv | |format=csv | ||
|offset=0 | |offset=0 | ||
|limit= | |limit=750 | ||
|mainlabel= | |mainlabel= | ||
|sep=, | |sep=, | ||
Line 162: | Line 180: | ||
|?Project completed | |?Project completed | ||
|?Project status | |?Project status | ||
|?Reach length directly affected | |||
|?Total cost | |?Total cost | ||
|?Total cost category | |?Total cost category | ||
Line 179: | Line 198: | ||
|format=broadtable | |format=broadtable | ||
|offset=0 | |offset=0 | ||
|limit= | |limit=50 | ||
|mainlabel= | |mainlabel= | ||
|class=sortable wikitable smwtable | |class=sortable wikitable smwtable | ||
}} | }} |
Latest revision as of 09:35, 16 May 2014
This is the user page for Nick Elbourne.
Actions:
Data quality report CSV1 - Project background
Data quality report CSV2 - Catchment/site information
Data quality report CSV3 - Dates, cost and project team
Data quality report CSV4 - Monitoring and other information
Check for latest updated case studies
Latest updated case studies | Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by Semantic MediaWiki. | Country |
---|---|---|
Greatham Managed Realignment Scheme | 9 December 2024 22:02:00 | England |
Heybarnes Recreation Ground Cole Restoration | 21 November 2024 12:27:31 | England |
Stage 0 channel restoration | 21 October 2024 07:54:48 | England |
Chambers Wharf | 3 October 2024 20:46:16 | England |
Test and Itchen Invasive Non-Native Project Species Project | 30 September 2024 13:09:36 | England |
more.. |
Check for coverage on start/end dates, themes and measures
Location | Country | Approval status | River name | River basin | River basin district | Contact organisation | Project started | Project completed | Project status | Reach length directly affected | Total cost | Total cost category | Funding source | River corridor land use | Bank and bed modifications measure | River corridor measure | Channel pattern measure | Other technical measure | Management interventions | Social measure | Theme | Biological quality element monitored | Hydromorphological quality element monitored | Physico-chemical quality element monitored | Other response monitored | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
't Merkske | 51° 25' 4.63" N, 4° 50' 29.21" E | Netherlands Belgium | Draft | Mark | Maas | Meuse | Waterschap Brabantse Delta | In progress | Broadleaf/mixed woodland (semi natural) | Environmental flows and water resources Habitat and biodiversity Hydromorphology Monitoring Water quality | ||||||||||||||||
2e Lower Woodsford River and Floodplain Enhancement | 50° 43' 12.17" N, 2° 18' 50.69" W | England | Approved | Frome Dorset (Lower) & Furzebrook Stream | Dorset | South West | Environment Agency Forestry Commission Woodland Trust Dorset Wildlife Trust | 1 January 2012 | 1 January 2014 | Complete | Removal of revetments | Tree planting Lowering of embankments | Re-profiled ditch | Community involvement Engagement with schools | Fisheries Flood risk management Habitat and biodiversity Hydromorphology Land use management - agriculture Land use management - forestry Monitoring | |||||||||||
3Rivers - Lumburn:Walkham:Tavy | 50° 31' 45.52" N, 4° 9' 38.87" W | England | Approved | Lower River Tavy | Tamar | South West | Westcountry Rivers Trust Devon Wildlife Trust South West Water Tamar Valley AONB Tavy Walkham and Plym Fishing Club | In progress | floodplain woodland planting | Land management | Volunteer engagement | Water quality | ||||||||||||||
Aaijen- Removal of bank fixation | 51° 34' 51.60" N, 6° 2' 25.80" E | Netherlands | Approved | Meuse | Meuse | Meuse | Rijkswaterstaat Waterdienst | 1 January 2005 | Complete | 74 k€74,000 € <br /> | 50 - 100 k€ | Intensive agriculture (arable) Urban | Removal of bank reinforcements | Flood risk management Monitoring Water quality | Macrophytes Invertebrates: Taxonomic composition Invertebrates: Abundance | Continuity for organisms | ||||||||||
Abaissement et démantèlement de trois clapets sur l’Orge aval | 48° 37' 57.50" N, 2° 18' 46.38" E | France | Approved | Syndicat de l’Orge Direction régionale et interdépartementale de l’environnement et de l’energie (DRIEE) Office national de l’eau et des milieux aquatiques (Onema). | 1 March 2010 | 30 September 2012 | Complete | 360 k€360,000 € <br /> | 100 - 500 k€ | Conseil régional Île-de-France (40 %) Agence de l’eau Seine-Normandie (20 %) Conseil général de l’Essonne (20 %). | Lowering of checking valves Removal of checking valves Water supply channel lowering | Environmental flows and water resources Habitat and biodiversity Hydromorphology Water quality Urban | ||||||||||||||
Abbey Brook Weir | 52° 59' 13.60" N, 3° 11' 11.70" W | Wales | Approved | Eglwyseg | Upper Dee | Dee | Welsh Dee Trust | 1 August 2011 | 1 November 2011 | Complete | Intensive agriculture (arable) Improved/semi-improved grassland/pasture Woodland | Rock ramp construction Creation of fish passes | Fisheries Habitat and biodiversity Hydropower | |||||||||||||
Abbots Worthy Restoration Project | 51° 5' 16.75" N, 1° 17' 6.30" W | England | Draft | Environment Agency Natural England | 1 April 2018 | Complete | 98,000 k€98,000,000 € <br /> | Flood risk management Habitat and biodiversity | ||||||||||||||||||
Abbotts Hall Managed Realignment Scheme | 51° 47' 5.40" N, 0° 50' 51.59" E | England | Approved | Combined Essex | Anglian | Essex Wildlife Trust English Nature Environment Agency | Complete | WWF and the Heritage Lottery Fund | Arable | Flood risk management Habitat and biodiversity | Invertebrates Macrophytes Fish | Flow velocities | Salinity | |||||||||||||
Adams Mill enhancements | 52° 5' 51.58" N, 0° 45' 14.71" W | England | Approved | Ouse (Cosgrove to Newport Pagnell) | Upper and Bedford Ouse | Anglian | Environment Agency Milton Keynes Angling Association Woodland Trust | 1 September 2014 | In progress | Less than 1 k€ | Environment Agency Grant in Aid | Improved/semi-improved grassland/pasture | Bank stabilisation | Increase in-channel hydromorphological diversity | Fisheries Hydromorphology | Fish | Substrate conditions Quantity & dynamics of flow | Habitat mapping | ||||||||
Adaptive management of hydraulic structures in the Sèvre nantaise and Thouet basins | 47° 35' 16.84" N, 2° 39' 47.11" W | France | Approved | Institution Interdepartmentale du bassin de la Sèvre Nantaise | 1 January 2004 | In progress | Water Agency Regional Council of the Pays de la Loire Départment-level Councils of the Vendée Loire Atlantique Deux-Sèvres and Maine-et-Loire Leader+ European Structural Fund | Weir partial removal or permanent opening of gates allowing self restoration of previously impunded stretches | More natural reservoir releases | Social representation of the river | ||||||||||||||||
Adare Fish Counter | 52° 39' 41.63" N, 8° 48' 20.72" W | Ireland | Approved | IFI | Complete | Creation of fish passes | Fisheries Social benefits | |||||||||||||||||||
Afon Clywdd | 53° 10' 57.73" N, 3° 22' 7.56" W | Wales | Draft | Natural Resources Wales AECOM | Planned | Runoff pathway management | Flood risk management Habitat and biodiversity Land use management - agriculture Land use management - forestry Water quality | |||||||||||||||||||
Afon Merin Natural Process Restoration | 52° 23' 56.58" N, 3° 46' 27.57" W | Wales | Approved | Mynach - headwaters to confluence with Rheidol | South West Wales | Western Wales | Natural Resources Wales | 1 February 2018 | Complete | 30,000 k€30,000,000 € <br /> | 10 - 50 k€ | 15 leaky dams and scrapes. | Environmental flows and water resources Fisheries Flood risk management Habitat and biodiversity Hydromorphology Land use management - forestry Monitoring Water quality | |||||||||||||
Agreed definition of mobility area for the Adour | 43° 39' 8.51" N, 0° 0' 51.13" W | France | Approved | L'Adour | Adour - Garonne | Hautes-Pyrénées et Ger | Institution Adour | 1 January 2005 | In progress | 3,733 k€3,733,000 € <br /> | 1000 - 5000 k€ | Water Agency Institution Adour Regional Council French State | Intensive agriculture (arable) Urban | Removal of bank reinforcements | Develop riparian forest | Definition of erodble corridor | Channel pattern/planform | |||||||||
Albany Park | 51° 40' 5.85" N, 0° 1' 59.94" W | England | Approved | Cuffley Brook and Turkey Brook | London | Thames | Environment Agency London Borough of Enfield | 4 January 2016 | Complete | 1000 - 5000 k€ | Local council Greater London Authority Environment Agency environmental funding and flood risk funding. | Creation of berms Creation of backwaters | River naturalisation Reedbed creation Scrapes Fish habitat restoration | Recreation | Environmental flows and water resources Fisheries Flood risk management Habitat and biodiversity Hydromorphology Social benefits Spatial planning Urban | |||||||||||
Alkborough tidal defence scheme | 53° 42' 2.78" N, 0° 41' 31.70" W | England | Approved | Skitter Bk / E Halton Bk from Ulceby Skitter to Humber Estuary | Louth Grimsby and Ancholme | Humber | Environment Agency Natural England Associated British Ports North Lincolnshire Council Defra Yorkshire Forward Heritage Lottery Fund European Union (EU) | 2005 | Complete | 10 - 50 k€ | Flood Defence Grant-in-Aid EU Interreg Regional Development Agency | Salt marsh and mudflat restoration | Flood risk management Social benefits | Invertebrates | ||||||||||||
Allt Lorgy River Restoration | 57° 16' 18.18" N, 3° 50' 33.26" W | Scotland | Approved | River Avon | River Spey | Scotland RBD | Spey Catchment Initiative Spey Fishery Board Cairngorms National Park Authority Scottish Natural Heritage SEPA | 1 March 2012 | In progress | 10 - 50 k€ | CNPA Scottish Environment Protection Agency | Removal of in stream boulders and replacement with wood structures Additional strategic wood structures introduced Graded extracted gravel to be used for sediment reintroduction Embankment lowering | Removal of 3 culvert pipes. Infilling of a large drainage ditch. | Site fenced to enable natural regeneration to take place. Supplementary planting planned for Spring 2013. Long term site monitoring programmed planned. | Flood risk management Habitat and biodiversity Hydromorphology Monitoring | |||||||||||
Alma Road Rain Gardens | 51° 38' 47.70" N, 0° 2' 3.53" W | England | Approved | Salmons Brook | London | Thames | London Borough of Enfield Thames 21 Greater London Authority | 1 April 2015 | 31 March 2016 | In progress | Greater London Authority | Urban | Sustainable urban drainage ponds (SUDs) | Rain gardens | Environmental flows and water resources Flood risk management Habitat and biodiversity Social benefits Water quality Urban | |||||||||||
Amerongse Bovenpolder | 51° 59' 26.69" N, 5° 27' 46.93" E | Netherlands | Approved | Rhine | Rhine | Rhine | Dienst Landelijk Gebied Rijkswaterstaat Utrechts Landschap Staatsbosbeheer | 1 January 2001 | 31 December 2015 | In progress | Rijkswaterstaat Dienst Landelijk Gebied | Intensive agriculture (arable) | Habitat and biodiversity Social benefits | |||||||||||||
Amwell Loop | 51° 47' 49.84" N, 0° 0' 2.16" W | England | Draft | Lee Navigation (Hertford and Ware) | Upper Lee | Thames | Environment Agency British Waterways Herts and Middlesex Wildlife Trust | Planned | 10 - 50 k€ | Capital works scheme | habitat improvements Deflectors | Tree planting | Environmental flows and water resources Flood risk management Habitat and biodiversity Hydromorphology | |||||||||||||
Aménagement du plan d’eau de la Sangsue et création d’un bras de contournement du Woigot | 49° 14' 54.48" N, 5° 56' 12.04" E | France | Approved | Syndicat CRW Commune de Briey Onema AERM communauté de communes du pays de Briey commune de Briey Fédération de pêche 54 | 1 June 2012 | 30 June 2014 | Complete | 5,372 k€5,372,000 € <br /> | 5000 - 10000 k€ | Agence de l’eau Rhin-Meuse (AERM) : 60 % Conseil régional de Lorraine : 30 % Fonds FEDER : compensation pour les fonds non subventionnés (1 693 000 HT) | Construction of a bypass channel Dam removal Creation of fish passes Creation of lateral dike to regulate flows Application of plant-engineering Riparian planting | Remeandering Creation of wetland | The banks are maintained if necessary by vegetal engineering | Flood risk management Habitat and biodiversity Hydromorphology Social benefits | ||||||||||||
Ancholme and Coast habitat project | 53° 37' 34.86" N, 0° 32' 22.61" W | England | Draft | Environment Agency Rivers Trusts Wildlife Trusts | 4 January 2018 | Complete | 210,400 k€210,400,000 € <br /> | Fisheries Flood risk management Habitat and biodiversity | ||||||||||||||||||
Anloërdiepje | 53° 2' 33.90" N, 6° 41' 22.12" E | Netherlands | Draft | Drentsche Aa | Nedereems | Ems | Waterschap Hunze en Aa's | Complete | Grassland Moorland/heathland Tall herb/rank vegetation Wetland | Habitat and biodiversity Hydromorphology Monitoring Water quality | ||||||||||||||||
Anton Crescent Wetlands Regeneration | 51° 22' 23.01" N, 0° 12' 8.64" W | England | Approved | Beverley Brook (Motspur Park to Thames) and Pyl Brook at West Barnes | London | Thames | Environment Agency Sutton Ecology Centre London Borough of Sutton Natural England | Complete | 12 k€12,000 € <br /> | 10 - 50 k€ | Urban | Habitat and biodiversity Social benefits Urban | ||||||||||||||
Arasement du seuil des Treize Saules sur la Quilienne | 50° 9' 14.58" N, 2° 29' 25.30" E | France | Approved | e Fédération départementale du Pas-de-Calais pour la pêche et la protection du milieu aquatique Office national de l’eau et des Milieux Aquatiques – service départemental du Pas-de-Calais (SD 62) association agréée pour la pêche et la protection du milieu aquatique (AAPPMA) de Pas-en-Artois | 1 October 2009 | 31 October 2009 | Complete | 17 k€17,000 € <br /> | 10 - 50 k€ | Agence de l’eau Artois-Picardie (50 %) conseil régional du Nord – Pas-de-Calais (30 %) fédération départementale du Pas-de-Calais pour la pêche et la protection du milieu aquatique (20 %) | Barrier removal Planting of hydrophytes Bank reprofiling | Filter masses were laid downstream of the dam to limit the impact of the work on the environment | Flood risk management Habitat and biodiversity Hydromorphology Land use management - agriculture | |||||||||||||
Arasement du vannage du moulin de Réveillon et réaménagement du lit mineur de la Blaise | 48° 44' 10.08" N, 1° 22' 15.20" E | France | Approved | Syndicat intercommunal de la vallée de la Blaise (SIVB) Office national de l’eau et des milieux aquatiques (Onema) - Service départemental Fédération départementale de la pêche Cellule d’animation technique pour l’eau et les rivières (CATER) Direction départementale de l’agriculture et de la forêt. | 1 January 2008 | 31 December 2008 | Complete | 142 k€142,000 € <br /> | 100 - 500 k€ | Conseil général (30 %) Agence de l’eau Seine-Normandie (50 %) | Dismantling of the mill Leveling threshold with the water level Helophytes planted Bank stabilisation Installation of geotextile | Creation of a sinuous channel | Habitat and biodiversity Spatial planning Water quality | |||||||||||||
Arborfield nature like bypass and weirs project | 51° 24' 28.95" N, 0° 55' 27.36" W | England | Approved | Loddon (Swallowfield to River Thames confluence) | Loddon | Thames | Environment Agency | 30 June 2010 | Complete | 596 k€596,000 € <br /> | more than 10000 k€ | Defra Environment Agency Flood and Coastal Risk Management Thames Water Barbel Society | Introduction of spawning gravels Riffle creation Weir lowering | Bypass channel Improving fish migration Creation of backwater | Volunteer engagement | Fisheries Flood risk management Habitat and biodiversity | Fish Invertebrates Macrophytes | Channel pattern/planform Quantity & dynamics of flow | Habitat mapping | |||||||
Arnos Park - Pymmes Brook | 51° 37' 16.08" N, 0° 8' 8.59" W | England | Draft | Pymmes Brook (upper channel with Muswell St & Bounds Grn Brk) | London | Thames | Environment Agency River Restoration Centre London Borough of Enfield London Wildlife Trust Greater London Authority | 1 January 2008 | Planned | Environment Agency Grant in Aid Local Authorities Greater London Authority | Creation of berms Barrier removal Embankment renaturalization Creation of low flow channel Creation of backwaters | River naturalisation Scrapes Floodplain reconnection Remeandering | Fisheries Flood risk management Habitat and biodiversity Hydromorphology Social benefits Urban | |||||||||||||
Ashlone Wharf FCRM scheme | 51° 28' 17.57" N, 0° 13' 22.45" W | England | Draft | Beverley Brook (Motspur Park to Thames) and Pyl Brook at West Barnes | London | Thames | Environment Agency London Borough of Hammersmith & Fulham | 1 May 2011 | In progress | Environment Agency Flood and Coastal Risk Management | Creation of fish passes | Fisheries Flood risk management Habitat and biodiversity | ||||||||||||||
Assessing the habitats outcomes of Floodplain Forest restoration: the case study of the floodplain forest at the Ouse Valley Park | 52° 4' 17.35" N, 0° 49' 53.50" W | England | Approved | Great Ouse (Upper) | Cam and Ely Ouse (including South Level) | Anglian | Cranfield University The Parks Trust Environment Agency EPSRC (Engineering and Physical Sciences Research Council) Hanson Cement | 1 January 2007 | 1 January 2014 | Complete | Removal of sand from beneath agricultural fields and restoring marsh lands has increased floodplain capacity and improved floodwater management | Improved public access Bird watching area | Environmental flows and water resources Habitat and biodiversity Hydromorphology Monitoring Water quality | |||||||||||||
Aston Clinton River Restoration | 51° 47' 46.05" N, 0° 43' 29.72" W | England | Approved | Buckinghamshire County Council Environment Agency Aylesbury Vale District Council Aston Clinton Parish Council Green Park | 1 August 2015 | Complete | Deculverting | Bypass channel Creation of new channel | Engagement with a wide range of stakeholders | Flood risk management Habitat and biodiversity Social benefits | ||||||||||||||||
Aubourn Rock Ramp and Habitat Works | 53° 9' 7.49" N, 0° 38' 10.62" W | England | Approved | Upper Witham | Witham | Anglian | Environment Agency | 5 January 2016 | Complete | 126,000 k€126,000,000 € <br /> | 100 - 500 k€ | Tree hinging over long section and large rock ramp installation to replace existing large weir that was a barrier to fish passage. | Fisheries Habitat and biodiversity | |||||||||||||
Austria River Mur - Strategic river management for considerations in the power and water management sector in Styria/Austria | 47° 23' 45.38" N, 15° 16' 11.14" E | Austria | Approved | freiland Environmental Consulting Civil Engineers Ltd. Office of the Styrian Government - Department 14 Watermanagement resources and sustainability | 1 January 1995 | 1 January 2015 | Complete | Providing of continuity | Protection of alluvial forests by connecting existing stocks to the fluvial dynamics | Reconnection of cutoff meander | Population’s awareness raising for the river habitat. | Economic aspects Environmental flows and water resources Flood risk management Habitat and biodiversity Hydropower Hydromorphology Land use management - agriculture Land use management - forestry Monitoring Social benefits Spatial planning Water quality | ||||||||||||||
Austria Upper Mur - LIFE III (LIFE03 NAT/A/000011) „Inner-Alpine river basin management – Upper River Mur - murerleben I" 2003-2007 | 47° 11' 25.66" N, 14° 46' 38.03" E | Austria | Approved | freiland Environmental Consulting Civil Engineers Ltd. Office of the Styrian Government - Department 14 Watermanagement resources and sustainability | 1 August 2003 | 31 July 2007 | Complete | 2,125 k€2,125,000 € <br /> | 1000 - 5000 k€ | EU Life Programme (50%) | Creation of bars Creation of Slips Creation of undercut banks and islets Creation of fish passes | Regeneration of alluvial forests Creation of pond | Reconnection of water bodies to the river | Environmental flows and water resources Flood risk management Habitat and biodiversity | ||||||||||||
Austria Upper Mur - LIFE+ (LIFE+ 08 NAT A 614) „Inner-Alpine river basin management – Upper River Mur - murerleben II" 2010-2015 | 47° 6' 19.47" N, 14° 12' 3.46" E | Austria | Approved | freiland Environmental Consulting Civil Engineers Ltd. Office of the Styrian Government - Department 14 Watermanagement resources and sustainability | 1 February 2010 | 1 February 2017 | In progress | 2,784 k€2,784,000 € <br /> | 1000 - 5000 k€ | implementation of Pool/riffle sequesnces Creation of Slips Creation of undercut banks Creation of islands Creation of bars Improve longitudinal connectivity | Regeneration of alluvial forests Floodplain reconnection | Awareness raising | Environmental flows and water resources Flood risk management Habitat and biodiversity Hydromorphology Monitoring | |||||||||||||
Austria Upper Mur - Public relations in murerleben I + II LIFE III (LIFE03 NAT/A/000011) and LIFE+ (LIFE+ 08 NAT A 614) „Inner-Alpine river basin management – Upper River Mur - murerleben I+II" 2003-2015 | 47° 10' 5.74" N, 14° 39' 29.20" E | Austria | Draft | freiland Environmental Consulting Civil Engineers Ltd. Office of the Styrian Government - Department 14 Watermanagement resources and sustainability | In progress | Habitat and biodiversity Monitoring Social benefits | ||||||||||||||||||||
Austria Upper Mur - River Widening Weyern (LIFE III (LIFE03 NAT/A/000011) Inner-Alpine river basin management – Upper River Mur - murerleben I 2003-2007) | 47° 11' 36.36" N, 14° 48' 42.24" E | Austria | Approved | freiland Environmental Consulting Civil Engineers Ltd. Office of the Styrian Government - Department 14 Watermanagement resources and sustainability | 17 September 2010 | Complete | Restoration of the connection of side arms | Environmental flows and water resources Habitat and biodiversity Hydromorphology Monitoring | ||||||||||||||||||
Austria Upper Mur - River widening Lässer Au (LIFE+ (LIFE+ 08 NAT A 614) Inner-Alpine river basin management – Upper River Mur - murerleben II 2010-2015) | 47° 12' 9.04" N, 14° 50' 43.01" E | Austria | Draft | freiland Environmental Consulting Civil Engineers Ltd. Office of the Styrian Government - Department 14 Watermanagement resources and sustainability | Complete | Removal of bank reinforcements Restoration of the connection of side arms | Environmental flows and water resources Habitat and biodiversity Hydromorphology | |||||||||||||||||||
Austria Upper Mur - River widening St. Peter Au (LIFE+ (LIFE+ 08 NAT A 614) Inner-Alpine river basin management – Upper River Mur - murerleben II 2010-2015) | 47° 12' 9.70" N, 14° 34' 47.18" E | Austria | Approved | freiland Environmental Consulting Civil Engineers Ltd. Office of the Styrian Government - Department 14 Watermanagement resources and sustainability | 1 September 2015 | Complete | Embankment renaturalization Restoration of the connection of side arms | Environmental flows and water resources Habitat and biodiversity Hydromorphology | ||||||||||||||||||
Austria Urban River Landscape - Urban River Landscape Graz | 47° 4' 14.57" N, 15° 26' 22.21" E | Austria | Approved | freiland Environmental Consulting Civil Engineers Ltd. | 1 January 2004 | In progress | Structuring of shoreline Construction gravel bays | Planning workshop | Environmental flows and water resources Habitat and biodiversity Monitoring Social benefits Spatial planning Water quality Urban | |||||||||||||||||
Austria Urban River Landscape - Urban River Landscape Master Plan Leoben | 47° 22' 35.00" N, 15° 5' 28.07" E | Austria | Draft | freiland Environmental Consulting Civil Engineers Ltd. | 1 January 2014 | 31 December 2014 | In progress | Social benefits Spatial planning Urban | ||||||||||||||||||
Austria cross-border section - Monitoring sediment transport and Habitat modelling (ETZ-Project “DraMurCi” 2009-2013) | 46° 43' 16.52" N, 15° 49' 32.61" E | Slovenia Austria | Draft | freiland Environmental Consulting Civil Engineers Ltd. Office of the Styrian Government - Department 14 Watermanagement resources and sustainability | 1 January 2009 | 1 January 2013 | Complete | Self-initiated bank erosion by sediment input | Environmental flows and water resources Habitat and biodiversity Hydromorphology | |||||||||||||||||
Austria cross-border section - River widening Sicheldorf (ETZ-Project “DraMurCi” 2009-2013) | 46° 41' 21.77" N, 15° 56' 59.21" E | Slovenia Austria | Approved | freiland Environmental Consulting Civil Engineers Ltd. Office of the Styrian Government - Department 14 Watermanagement resources and sustainability | 1 January 2009 | 31 December 2013 | Complete | Construction gravel bays Creation of islands Removal of bank reinforcements | Environmental flows and water resources Habitat and biodiversity Hydromorphology | |||||||||||||||||
Austria cross-border section - River widening measure Gosdorf I (Interreg IIIa Project "Maßnahmen Unteres Murtal" 2002-2007) | 46° 43' 7.14" N, 15° 48' 46.57" E | Slovenia Austria | Approved | freiland Environmental Consulting Civil Engineers Ltd. Office of the Styrian Government - Department 14 Watermanagement resources and sustainability | 1 January 2002 | 31 December 2007 | Complete | Creation of undercut banks Restoration of the connection of side arms Creation of Slips Creation of fords Creation of potholes Creation of gravel banks | Environmental flows and water resources Habitat and biodiversity Hydromorphology | |||||||||||||||||
Austria cross-border section - River widening measure Gosdorf II (ETZ-Project “DraMurCi” 2009-2013) | 46° 43' 21.13" N, 15° 50' 0.96" E | Slovenia Austria | Approved | freiland Environmental Consulting Civil Engineers Ltd. Office of the Styrian Government - Department 14 Watermanagement resources and sustainability | 1 January 2009 | 31 December 2013 | Complete | habitat improvements | Channel widening Habitat creation | Environmental flows and water resources Habitat and biodiversity Hydromorphology | ||||||||||||||||
Austria/Slovenia Urban River Landscape - ETZ-“Skupaj“ - Joint urban and natural development at the Mur banks in Gornja Radgona and Bad Radkersburg | 46° 41' 1.58" N, 15° 59' 13.74" E | Slovenia Austria | Draft | freiland Environmental Consulting Civil Engineers Ltd. Stadtgemeinde Bad Radkersburg | 2008 | Complete | Economic aspects Environmental flows and water resources Habitat and biodiversity Social benefits Spatial planning Urban | |||||||||||||||||||
Austria/Slovenia cross-border cooperation - “Die Murkommission” – Bilateral River Commission | 46° 41' 11.11" N, 15° 59' 14.61" E | Slovenia Austria | Draft | freiland Environmental Consulting Civil Engineers Ltd. | In progress | Economic aspects Environmental flows and water resources Fisheries Flood risk management Habitat and biodiversity Hydropower Hydromorphology Land use management - agriculture Land use management - forestry Monitoring Social benefits Spatial planning Water quality Urban | ||||||||||||||||||||
Austria/Slovenia cross-border section - ETZ-Project “DraMurCi” 2009-2013 | 46° 43' 14.98" N, 15° 49' 3.13" E | Slovenia Austria | Draft | freiland Environmental Consulting Civil Engineers Ltd. Office of the Styrian Government - Department 14 Watermanagement resources and sustainability | 1 January 2009 | 31 December 2013 | Complete | 3,500 k€3,500,000 € <br /> | 1000 - 5000 k€ | European Regional Development Fund | Environmental flows and water resources Flood risk management Habitat and biodiversity Hydromorphology | |||||||||||||||
Austria/Slovenia cross-border section - Interreg IIIa Project "Maßnahmen Unteres Murtal" 2003-2008 | 46° 43' 14.59" N, 15° 49' 3.41" E | Slovenia Austria | Draft | freiland Environmental Consulting Civil Engineers Ltd. Office of the Styrian Government - Department 14 Watermanagement resources and sustainability | 1 January 2003 | 31 December 2008 | Complete | 3,800 k€3,800,000 € <br /> | 1000 - 5000 k€ | EU Interreg IIIA (50 %) | reactivation and extending of tributary streams Bed load addition | Regeneration of alluvial forests | Environmental flows and water resources Habitat and biodiversity Hydromorphology | |||||||||||||
Avon Barriers Project | 55° 46' 2.99" N, 4° 1' 23.47" W | Scotland | Approved | Avon Water | New Forest | South East | SEPA | 1 January 2015 | In progress | Weir modification | Improving fish migration | Fisheries Habitat and biodiversity | ||||||||||||||
... further results |