Case study:Habitat improvements in the upper Kennet: Difference between revisions
No edit summary |
No edit summary |
||
(13 intermediate revisions by 6 users not shown) | |||
Line 1: | Line 1: | ||
{{Case study status | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | |||
{{Location | |||
|Location=51.440312757160115, -1.69464111328125 | |||
}} | }} | ||
{{Project overview | {{Project overview | ||
|Status=In progress | |Status=In progress | ||
Line 9: | Line 11: | ||
|Main contact forename=Charlotte | |Main contact forename=Charlotte | ||
|Main contact surname=Hitchmough | |Main contact surname=Hitchmough | ||
|Partner organisations=Action for the River Kennet (ARK), Marlborough Town Council, Marlborough Area Development Trust, local | |Partner organisations=Action for the River Kennet (ARK), Marlborough Town Council, Marlborough Area Development Trust, local volunteers, | ||
|Multi-site=No | |Multi-site=No | ||
|Project summary=The project to enable fish to swim through Marlborough will build a new channel linking the existing main river with a backstream, which currently flows intermittently down a cascade that is impassable to fish. The new channel will have a gentle gradient which will allow fish, including brown trout and grayling to swim up and down it. | |Project summary=The project to enable fish to swim through Marlborough will build a new channel linking the existing main river with a backstream, which currently flows intermittently down a cascade that is impassable to fish. The new channel will have a gentle gradient which will allow fish, including brown trout and grayling to swim up and down it. | ||
Line 16: | Line 18: | ||
By fencing livestock away from the river the project will reduce bank erosion and keep sediment out of the river as a result. This keeps the natural gravel bed clean, leaving it clear for fish spawning and healthy weed growth. | By fencing livestock away from the river the project will reduce bank erosion and keep sediment out of the river as a result. This keeps the natural gravel bed clean, leaving it clear for fish spawning and healthy weed growth. | ||
We will improve water quality, by diverting urban runoff from the road into a reedbed, which will filter out pollutants before the water reaches the river. | We will improve water quality, by diverting urban runoff from the road into a reedbed, which will filter out pollutants before the water reaches the river. | ||
Community Involvement: <br> | |||
- Local schools will use the Stonebridge and Og sites as an educational resource <br> | |||
- Local people will be connected to their river, either because they have volunteered to work on the project or because they can now walk along a section of river which was previously inaccessible | |||
}} | |||
{{Image gallery}} | |||
{{Case study image | |||
|File name=During works.JPG | |||
|Caption=During works | |||
}} | |||
{{Image gallery end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case study subcatchment | |||
|Subcatchment=Upper Kennet to Marlborough | |||
}} | }} | ||
{{Site | {{Site | ||
|Name=Kennet | |Name=Kennet | ||
|WFD water body code=GB106039023171 | |||
|WFD water body name=Upper Kennet to Marlborough | |||
|Heavily modified water body=No | |Heavily modified water body=No | ||
|Protected species present=No | |Protected species present=No | ||
Line 25: | Line 43: | ||
}} | }} | ||
{{Project background | {{Project background | ||
|Project started=2012/07/01 | |||
|Project completed=2015/03/01 | |||
|Total cost category=100 - 500 k€ | |Total cost category=100 - 500 k€ | ||
|Total1 cost=104 | |Total1 cost=104 | ||
Line 34: | Line 54: | ||
}} | }} | ||
{{Measures | {{Measures | ||
| | |Planform / Channel pattern=Creation of meanders, | ||
|Social measures=Engagement with schools, Community Education, Community involvement, Improved public access, | |||
|Wider stakeholder / citizen engagement=Local support, Community engagement, | |||
}} | }} | ||
{{Hydromorphological quality elements header}} | {{Hydromorphological quality elements header}} | ||
Line 46: | Line 68: | ||
{{Monitoring documents}} | {{Monitoring documents}} | ||
{{Monitoring documents end}} | {{Monitoring documents end}} | ||
{{Additional Documents}} | {{Additional Documents}} | ||
{{Case study documents | |||
|File name=Stand up for the Kennet web version.pdf | |||
}} | |||
{{Additional Documents end}} | {{Additional Documents end}} | ||
{{Additional links and references header}} | {{Additional links and references header}} | ||
{{Additional links and references footer}} | {{Additional links and references footer}} | ||
{{Supplementary Information}} | {{Supplementary Information}} | ||
{{Toggle content end}} |
Latest revision as of 16:45, 2 January 2019
Project overview
Status | In progress |
---|---|
Project web site | |
Themes | Habitat and biodiversity, Social benefits, Water quality |
Country | England |
Main contact forename | Charlotte |
Main contact surname | Hitchmough |
Main contact user ID | |
Contact organisation | |
Contact organisation web site | |
Partner organisations | Action for the River Kennet (ARK), Marlborough Town Council, Marlborough Area Development Trust, local volunteers |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The project to enable fish to swim through Marlborough will build a new channel linking the existing main river with a backstream, which currently flows intermittently down a cascade that is impassable to fish. The new channel will have a gentle gradient which will allow fish, including brown trout and grayling to swim up and down it.
This is phase two of a project to link the river above and below Marlborough. The river above Marlborough is a valuable spawning habitat, but all the fish here died during the 2011/12 drought. Joining the two sections of river should improve the fish populations up and downstream.
The habitat restoration projects use relatively simple techniques and materials and a considerable portion of the work will be done by volunteers. The work will repair eroded parts of the bank and create meanders and changes in flow which will create a more diverse environment to suit a variety of fish species and life stages.
By fencing livestock away from the river the project will reduce bank erosion and keep sediment out of the river as a result. This keeps the natural gravel bed clean, leaving it clear for fish spawning and healthy weed growth.
We will improve water quality, by diverting urban runoff from the road into a reedbed, which will filter out pollutants before the water reaches the river.
Community Involvement:
- Local schools will use the Stonebridge and Og sites as an educational resource
- Local people will be connected to their river, either because they have volunteered to work on the project or because they can now walk along a section of river which was previously inaccessible
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|