Case study:River Kennet Restoration at Durnsford: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
(18 intermediate revisions by 5 users not shown) | |||
Line 1: | Line 1: | ||
{{ | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
Line 17: | Line 12: | ||
|Themes=Habitat and biodiversity, Hydromorphology, Monitoring | |Themes=Habitat and biodiversity, Hydromorphology, Monitoring | ||
|Country=England | |Country=England | ||
|Main contact forename= | |Main contact forename=Judy | ||
|Main contact surname= | |Main contact surname=England | ||
|Contact organisation=Environment Agency | |||
|Contact organisation= | |Contact organisation url=www.environment-agency.gov.uk | ||
|Contact organisation url=www. | |||
|Partner organisations=Natural England, | |Partner organisations=Natural England, | ||
|Multi-site=No | |Multi-site=No | ||
|Project picture=Kennet Eddington.png | |Project picture=Kennet Eddington.png | ||
|Picture description=Courtesy of Google Earth (2013) | |Picture description=Overwide section immediately upstream of where works were completed. Courtesy of Google Earth (2013) | ||
|Project summary= | |Project summary=Restoration measures implemented along a 2000m section included profile regrading, introduction of large woody debris, removal of invasive species, placement of gravels, cutting trees back, re-connection to adjacent floodplain, creation of wetlands and narrowing of the channel to reintroduce sinuousity. | ||
}} | |||
{{Image_gallery}} | |||
{{Image_gallery_end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case study subcatchment | |||
{{ | |Subcatchment=Middle Kennet (Marlborough to Newbury) | ||
|Subcatchment= | |||
}} | }} | ||
{{Site | {{Site | ||
|Name= | |Name=Denford Common | ||
|WFD water body code=GB106039023172 | |||
|Pre-project morphology=Straight,Embanked,High width:depth | |||
|Reference morphology=Pool-riffle,Sinuous | |||
|WFD water body code= | |Heavily modified water body=Yes | ||
|Local site designation=Area of Special Conservation Interest | |||
|Protected species present=No | |||
|Invasive species present=No | |||
|Dominant hydrology=Quick run-off | |||
|Dominant substrate=Cobble,Estuarine mud,Silt | |||
|Pre-project morphology= | |River corridor land use=Extensive agriculture | ||
|Average bankfull channel width category=10 - 50 m | |||
|Reference morphology= | |Average bankfull channel depth category=5 - 10 m | ||
|Mn discharge=9.75 | |||
|Heavily modified water body= | |||
|Local site designation= | |||
|Protected species present= | |||
|Invasive species present= | |||
|Dominant hydrology= | |||
|Dominant substrate= | |||
|River corridor land use= | |||
|Average bankfull channel width category= | |||
|Average bankfull channel depth category= | |||
|Mn discharge= | |||
}} | }} | ||
{{Project_background | {{Project_background | ||
Line 177: | Line 133: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Regrading,Removal of invasive species,Cut back of trees,Depth variation, Introducing large woody debris, Introduction of gravel, | ||
|Floodplain / River corridor=Connection to wider floodplain, Creation of wetland | |||
|Planform / Channel pattern=Channel narrowing, Adding sinuosity, | |||
|Management interventions=Management of organic and inorganic sediments | |||
|Floodplain / River corridor= | |Social measures=Improved public access | ||
|Planform / Channel pattern= | |||
|Management interventions= | |||
|Social measures= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} | ||
Line 297: | Line 242: | ||
{{Monitoring_documents}} | {{Monitoring_documents}} | ||
{{Monitoring_documents_end}} | {{Monitoring_documents_end}} | ||
{{Additional_Documents}} | {{Additional_Documents}} | ||
{{Additional_Documents_end}} | {{Additional_Documents_end}} | ||
Line 306: | Line 250: | ||
|Information= | |Information= | ||
}} | }} | ||
{{Case_study_upload}} | {{Case_study_upload}} | ||
{{Toggle content end}} |
Latest revision as of 15:13, 1 June 2017
Location: 51° 25' 4.44" N, 1° 30' 27.86" W
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Habitat and biodiversity, Hydromorphology, Monitoring |
Country | England |
Main contact forename | Judy |
Main contact surname | England |
Main contact user ID | |
Contact organisation | Environment Agency |
Contact organisation web site | http://www.environment-agency.gov.uk |
Partner organisations | Natural England |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Edit project overview to modify the project summary.
Restoration measures implemented along a 2000m section included profile regrading, introduction of large woody debris, removal of invasive species, placement of gravels, cutting trees back, re-connection to adjacent floodplain, creation of wetlands and narrowing of the channel to reintroduce sinuousity.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Eastridge Estate restoration project, Habitat Improvement: Stonebridge River Reserve, Og and Marlborough Fish Migration
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|