Case study:River Restoration at Hunworth (River Glaven): Difference between revisions
No edit summary |
No edit summary |
||
Line 18: | Line 18: | ||
|Project picture=10122012347(2).png | |Project picture=10122012347(2).png | ||
|Picture description=Looking downstream from the dismantled railway | |Picture description=Looking downstream from the dismantled railway | ||
|Project summary=The river restoration work carried out on the River Glaven at Hunworth was done with a view to returning the river to a more natural state. The scheme involved a number of organisations, including the Environment Agency, the Wild Trout Trust, the River Glaven Conservation Group and the Centre for Environment, Fisheries and Aquaculture. A variety of techniques were employed, including channel reprofiling, the reintroduction of gravels and the installation of cattle drinks. | |||
Since the works were completed in 2010 the River Glaven (Waterbody ID: GB105034055780) has improved from Moderate ecological status (as designated in the Anglian River Basin Management Plan) to Good ecological status, with specific improvements in macroinvertebrate and fish populations. | |||
}} | }} | ||
{{Case study subcatchment | {{Case study subcatchment |
Revision as of 15:02, 11 March 2013
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | http://http://www.wildtrout.org/content/river-glaven-hunworth |
Themes | Fisheries, Habitat and biodiversity, Hydromorphology, Land use management - agriculture |
Country | England |
Main contact forename | Ian |
Main contact surname | Shepperd |
Main contact user ID | |
Contact organisation | River Glaven Conservation Group |
Contact organisation web site | http://http://www.riverglaven.co.uk/ |
Partner organisations | Environment Agency, Centre for Fisheries and Aquaculture Science, Wild Trout Trust |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The river restoration work carried out on the River Glaven at Hunworth was done with a view to returning the river to a more natural state. The scheme involved a number of organisations, including the Environment Agency, the Wild Trout Trust, the River Glaven Conservation Group and the Centre for Environment, Fisheries and Aquaculture. A variety of techniques were employed, including channel reprofiling, the reintroduction of gravels and the installation of cattle drinks.
Since the works were completed in 2010 the River Glaven (Waterbody ID: GB105034055780) has improved from Moderate ecological status (as designated in the Anglian River Basin Management Plan) to Good ecological status, with specific improvements in macroinvertebrate and fish populations.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Anglian |
---|---|
River basin | North Norfolk |
Subcatchment
River name | Glaven |
---|---|
Area category | 10 - 100 km² |
Area (km2) | |
Maximum altitude category | 100 - 200 m |
Maximum altitude (m) | 103103 m <br />0.103 km <br />10,300 cm <br /> |
Dominant geology | Calcareous |
Ecoregion | Great Britain |
Dominant land cover | Arable and Horticulture |
Waterbody ID | GB105034055780 |
Other case studies in this subcatchment: Nine Chalk Rivers Project - Glaven Catchment, River Glaven conservation group
Site
Name | Hunworth |
---|---|
WFD water body codes | GB105034055780 |
WFD (national) typology | Low, Small, Calcareous |
WFD water body name | Glaven |
Pre-project morphology | Straightened |
Reference morphology | Sinuous |
Desired post project morphology | |
Heavily modified water body | Yes |
National/international site designation | |
Local/regional site designations | |
Protected species present | Yes |
Invasive species present | Yes |
Species of interest | |
Dominant hydrology | Groundwater |
Dominant substrate | Gravel |
River corridor land use | Intensive agriculture (arable) |
Average bankfull channel width category | 5 - 10 m |
Average bankfull channel width (m) | |
Average bankfull channel depth category | 0.5 - 2 m |
Average bankfull channel depth (m) | |
Mean discharge category | 0.1 - 1.0 m³/s |
Mean annual discharge (m3/s) | |
Average channel gradient category | Less than 0.001 |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 320320 m <br />0.32 km <br />32,000 cm <br /> |
---|---|
Project started | 2009/03/01 |
Works started | 2013/08/02 |
Works completed | 2010/08/18 |
Project completed | 2011/01/01 |
Total cost category | 10 - 50 k€ |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Channel reprofiling, reintroducing gravel, installation of cattle drinks |
Floodplain / River corridor | Removal of embankments |
Planform / Channel pattern | Increase in sinuosity |
Other | |
Non-structural measures
| |
Management interventions | Reduced maintenance |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|
Supplementary Information
Edit Supplementary Information