User:NickRRC: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
No edit summary |
||
Line 17: | Line 17: | ||
=== Check for coverage on start/end dates, themes and measures=== | === Check for coverage on start/end dates, themes and measures=== | ||
{{#ask:[[Category:Case study]] | {{#ask:[[Category:Case study]] | ||
[[Country.RESTORE region:: | [[Country.RESTORE region::West]] | ||
|?Project started | |?Project started | ||
|?Project completed | |?Project completed |
Revision as of 16:24, 25 January 2013
This is the user page for Nick Elbourne.
Actions:
Check for coverage on start/end dates, themes and measures
Project started | Project completed | Bank and bed modifications measure | River corridor measure | Channel pattern measure | Other technical measure | Management interventions | Social measure | Theme | Biological quality element monitored | Hydromorphological quality element monitored | Physico-chemical quality element monitored | Other response monitored | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
't Merkske | Environmental flows and water resources Habitat and biodiversity Hydromorphology Monitoring Water quality | ||||||||||||
2e Lower Woodsford River and Floodplain Enhancement | 1 January 2012 | 1 January 2014 | Removal of revetments | Tree planting Lowering of embankments | Re-profiled ditch | Community involvement Engagement with schools | Fisheries Flood risk management Habitat and biodiversity Hydromorphology Land use management - agriculture Land use management - forestry Monitoring | ||||||
3Rivers - Lumburn:Walkham:Tavy | floodplain woodland planting | Land management | Volunteer engagement | Water quality | |||||||||
Aaijen- Removal of bank fixation | 1 January 2005 | Removal of bank reinforcements | Flood risk management Monitoring Water quality | Invertebrates: Abundance Invertebrates: Taxonomic composition Macrophytes | Continuity for organisms | ||||||||
Abaissement et démantèlement de trois clapets sur l’Orge aval | 1 March 2010 | 30 September 2012 | Lowering of checking valves Removal of checking valves Water supply channel lowering | Environmental flows and water resources Habitat and biodiversity Hydromorphology Water quality Urban | |||||||||
Abbey Brook Weir | 1 August 2011 | 1 November 2011 | Rock ramp construction Creation of fish passes | Fisheries Habitat and biodiversity Hydropower | |||||||||
Abbots Worthy Restoration Project | 1 April 2018 | Flood risk management Habitat and biodiversity | |||||||||||
Abbotts Hall Managed Realignment Scheme | Flood risk management Habitat and biodiversity | Fish Invertebrates Macrophytes | Flow velocities | Salinity | |||||||||
Adams Mill enhancements | 1 September 2014 | Bank stabilisation | Increase in-channel hydromorphological diversity | Fisheries Hydromorphology | Fish | Quantity & dynamics of flow Substrate conditions | Habitat mapping | ||||||
Adaptive management of hydraulic structures in the Sèvre nantaise and Thouet basins | 1 January 2004 | Weir partial removal or permanent opening of gates allowing self restoration of previously impunded stretches | More natural reservoir releases | Social representation of the river | |||||||||
Adare Fish Counter | Creation of fish passes | Fisheries Social benefits | |||||||||||
Afon Clywdd | Runoff pathway management | Flood risk management Habitat and biodiversity Land use management - agriculture Land use management - forestry Water quality | |||||||||||
Afon Merin Natural Process Restoration | 1 February 2018 | 15 leaky dams and scrapes. | Environmental flows and water resources Fisheries Flood risk management Habitat and biodiversity Hydromorphology Land use management - forestry Monitoring Water quality | ||||||||||
Agreed definition of mobility area for the Adour | 1 January 2005 | Removal of bank reinforcements | Develop riparian forest | Definition of erodble corridor | Channel pattern/planform | ||||||||
Albany Park | 4 January 2016 | Creation of berms Creation of backwaters | River naturalisation Reedbed creation Scrapes Fish habitat restoration | Recreation | Environmental flows and water resources Fisheries Flood risk management Habitat and biodiversity Hydromorphology Social benefits Spatial planning Urban | ||||||||
Alkborough tidal defence scheme | 2005 | Salt marsh and mudflat restoration | Flood risk management Social benefits | Invertebrates | |||||||||
Allt Lorgy River Restoration | 1 March 2012 | Removal of in stream boulders and replacement with wood structures Additional strategic wood structures introduced Graded extracted gravel to be used for sediment reintroduction Embankment lowering | Removal of 3 culvert pipes. Infilling of a large drainage ditch. | Site fenced to enable natural regeneration to take place. Supplementary planting planned for Spring 2013. Long term site monitoring programmed planned. | Flood risk management Habitat and biodiversity Hydromorphology Monitoring | ||||||||
Alma Road Rain Gardens | 1 April 2015 | 31 March 2016 | Sustainable urban drainage ponds (SUDs) | Rain gardens | Environmental flows and water resources Flood risk management Habitat and biodiversity Social benefits Water quality Urban | ||||||||
Amerongse Bovenpolder | 1 January 2001 | 31 December 2015 | Habitat and biodiversity Social benefits | ||||||||||
Amwell Loop | habitat improvements Deflectors | Tree planting | Environmental flows and water resources Flood risk management Habitat and biodiversity Hydromorphology | ||||||||||
Aménagement du plan d’eau de la Sangsue et création d’un bras de contournement du Woigot | 1 June 2012 | 30 June 2014 | Construction of a bypass channel Dam removal Creation of fish passes Creation of lateral dike to regulate flows Application of plant-engineering Riparian planting | Remeandering Creation of wetland | The banks are maintained if necessary by vegetal engineering | Flood risk management Habitat and biodiversity Hydromorphology Social benefits | |||||||
Ancholme and Coast habitat project | 4 January 2018 | Fisheries Flood risk management Habitat and biodiversity | |||||||||||
Anloërdiepje | Habitat and biodiversity Hydromorphology Monitoring Water quality | ||||||||||||
Anton Crescent Wetlands Regeneration | Habitat and biodiversity Social benefits Urban | ||||||||||||
Arasement du seuil des Treize Saules sur la Quilienne | 1 October 2009 | 31 October 2009 | Barrier removal Planting of hydrophytes Bank reprofiling | Filter masses were laid downstream of the dam to limit the impact of the work on the environment | Flood risk management Habitat and biodiversity Hydromorphology Land use management - agriculture | ||||||||
Arasement du vannage du moulin de Réveillon et réaménagement du lit mineur de la Blaise | 1 January 2008 | 31 December 2008 | Dismantling of the mill Leveling threshold with the water level Helophytes planted Bank stabilisation Installation of geotextile | Creation of a sinuous channel | Habitat and biodiversity Spatial planning Water quality | ||||||||
Arborfield nature like bypass and weirs project | 30 June 2010 | Introduction of spawning gravels Riffle creation Weir lowering | Bypass channel Creation of backwater Improving fish migration | Volunteer engagement | Fisheries Flood risk management Habitat and biodiversity | Fish Invertebrates Macrophytes | Channel pattern/planform Quantity & dynamics of flow | Habitat mapping | |||||
Arnos Park - Pymmes Brook | 1 January 2008 | Creation of berms Barrier removal Embankment renaturalization Creation of low flow channel Creation of backwaters | River naturalisation Scrapes Floodplain reconnection Remeandering | Fisheries Flood risk management Habitat and biodiversity Hydromorphology Social benefits Urban | |||||||||
Ashlone Wharf FCRM scheme | 1 May 2011 | Creation of fish passes | Fisheries Flood risk management Habitat and biodiversity | ||||||||||
Assessing the habitats outcomes of Floodplain Forest restoration: the case study of the floodplain forest at the Ouse Valley Park | 1 January 2007 | 1 January 2014 | Removal of sand from beneath agricultural fields and restoring marsh lands has increased floodplain capacity and improved floodwater management | Bird watching area Improved public access | Environmental flows and water resources Habitat and biodiversity Hydromorphology Monitoring Water quality | ||||||||
Aston Clinton River Restoration | 1 August 2015 | Deculverting | Bypass channel Creation of new channel | Engagement with a wide range of stakeholders | Flood risk management Habitat and biodiversity Social benefits | ||||||||
Aubourn Rock Ramp and Habitat Works | 5 January 2016 | Tree hinging over long section and large rock ramp installation to replace existing large weir that was a barrier to fish passage. | Fisheries Habitat and biodiversity | ||||||||||
Austria River Mur - Strategic river management for considerations in the power and water management sector in Styria/Austria | 1 January 1995 | 1 January 2015 | Providing of continuity | Protection of alluvial forests by connecting existing stocks to the fluvial dynamics | Reconnection of cutoff meander | Population’s awareness raising for the river habitat. | Economic aspects Environmental flows and water resources Flood risk management Habitat and biodiversity Hydropower Hydromorphology Land use management - agriculture Land use management - forestry Monitoring Social benefits Spatial planning Water quality | ||||||
Austria Upper Mur - LIFE III (LIFE03 NAT/A/000011) „Inner-Alpine river basin management – Upper River Mur - murerleben I" 2003-2007 | 1 August 2003 | 31 July 2007 | Creation of bars Creation of Slips Creation of undercut banks and islets Creation of fish passes | Regeneration of alluvial forests Creation of pond | Reconnection of water bodies to the river | Environmental flows and water resources Flood risk management Habitat and biodiversity | |||||||
Austria Upper Mur - LIFE+ (LIFE+ 08 NAT A 614) „Inner-Alpine river basin management – Upper River Mur - murerleben II" 2010-2015 | 1 February 2010 | 1 February 2017 | implementation of Pool/riffle sequesnces Creation of Slips Creation of undercut banks Creation of islands Creation of bars Improve longitudinal connectivity | Regeneration of alluvial forests Floodplain reconnection | Awareness raising | Environmental flows and water resources Flood risk management Habitat and biodiversity Hydromorphology Monitoring | |||||||
Austria Upper Mur - Public relations in murerleben I + II LIFE III (LIFE03 NAT/A/000011) and LIFE+ (LIFE+ 08 NAT A 614) „Inner-Alpine river basin management – Upper River Mur - murerleben I+II" 2003-2015 | Habitat and biodiversity Monitoring Social benefits | ||||||||||||
Austria Upper Mur - River Widening Weyern (LIFE III (LIFE03 NAT/A/000011) Inner-Alpine river basin management – Upper River Mur - murerleben I 2003-2007) | 17 September 2010 | Restoration of the connection of side arms | Environmental flows and water resources Habitat and biodiversity Hydromorphology Monitoring | ||||||||||
Austria Upper Mur - River widening Lässer Au (LIFE+ (LIFE+ 08 NAT A 614) Inner-Alpine river basin management – Upper River Mur - murerleben II 2010-2015) | Removal of bank reinforcements Restoration of the connection of side arms | Environmental flows and water resources Habitat and biodiversity Hydromorphology | |||||||||||
Austria Upper Mur - River widening St. Peter Au (LIFE+ (LIFE+ 08 NAT A 614) Inner-Alpine river basin management – Upper River Mur - murerleben II 2010-2015) | 1 September 2015 | Embankment renaturalization Restoration of the connection of side arms | Environmental flows and water resources Habitat and biodiversity Hydromorphology | ||||||||||
Austria Urban River Landscape - Urban River Landscape Graz | 1 January 2004 | Structuring of shoreline Construction gravel bays | Planning workshop | Environmental flows and water resources Habitat and biodiversity Monitoring Social benefits Spatial planning Water quality Urban | |||||||||
Austria Urban River Landscape - Urban River Landscape Master Plan Leoben | 1 January 2014 | 31 December 2014 | Social benefits Spatial planning Urban | ||||||||||
Austria cross-border section - Monitoring sediment transport and Habitat modelling (ETZ-Project “DraMurCi” 2009-2013) | 1 January 2009 | 1 January 2013 | Self-initiated bank erosion by sediment input | Environmental flows and water resources Habitat and biodiversity Hydromorphology | |||||||||
Austria cross-border section - River widening Sicheldorf (ETZ-Project “DraMurCi” 2009-2013) | 1 January 2009 | 31 December 2013 | Construction gravel bays Creation of islands Removal of bank reinforcements | Environmental flows and water resources Habitat and biodiversity Hydromorphology | |||||||||
Austria cross-border section - River widening measure Gosdorf I (Interreg IIIa Project "Maßnahmen Unteres Murtal" 2002-2007) | 1 January 2002 | 31 December 2007 | Creation of undercut banks Restoration of the connection of side arms Creation of Slips Creation of fords Creation of potholes Creation of gravel banks | Environmental flows and water resources Habitat and biodiversity Hydromorphology | |||||||||
Austria cross-border section - River widening measure Gosdorf II (ETZ-Project “DraMurCi” 2009-2013) | 1 January 2009 | 31 December 2013 | habitat improvements | Channel widening Habitat creation | Environmental flows and water resources Habitat and biodiversity Hydromorphology | ||||||||
Austria/Slovenia Urban River Landscape - ETZ-“Skupaj“ - Joint urban and natural development at the Mur banks in Gornja Radgona and Bad Radkersburg | 2008 | Economic aspects Environmental flows and water resources Habitat and biodiversity Social benefits Spatial planning Urban | |||||||||||
Austria/Slovenia cross-border cooperation - “Die Murkommission” – Bilateral River Commission | Economic aspects Environmental flows and water resources Fisheries Flood risk management Habitat and biodiversity Hydropower Hydromorphology Land use management - agriculture Land use management - forestry Monitoring Social benefits Spatial planning Water quality Urban | ||||||||||||
Austria/Slovenia cross-border section - ETZ-Project “DraMurCi” 2009-2013 | 1 January 2009 | 31 December 2013 | Environmental flows and water resources Flood risk management Habitat and biodiversity Hydromorphology | ||||||||||
Austria/Slovenia cross-border section - Interreg IIIa Project "Maßnahmen Unteres Murtal" 2003-2008 | 1 January 2003 | 31 December 2008 | reactivation and extending of tributary streams Bed load addition | Regeneration of alluvial forests | Environmental flows and water resources Habitat and biodiversity Hydromorphology | ||||||||
Avon Barriers Project | 1 January 2015 | Weir modification | Improving fish migration | Fisheries Habitat and biodiversity | |||||||||
Avon Barriers Project: Ferengair Weir | 1 January 2015 | Weir modification | Improving fish migration | Fisheries Habitat and biodiversity | |||||||||
BALLYMONEY RIVERSIDE PARK RESTORATION PROJECT | 7 April 2014 | Weir removal Addition of substrate and in channel features Alteration in channel dimensions | Creation of wetland Creation of ponds and scrapes | Diversification of in-channel features Meandering channel | management of wetland by council (new area of work) | Community Education Public amenity and perception | Fisheries Flood risk management Habitat and biodiversity Social benefits Urban | Fish | Channel pattern/planform Freshwater flow regime | Channel bed morphology. | |||
Babbs Mill reed bed | Channel reprofiling | Reedbed creation | Awareness raising | Habitat and biodiversity Urban | |||||||||
Babingley River at Hillington | 2006 | 1 February 2007 | Creation of wooden deflectors Habitat diversification Cleaning of spawning gravels | Riparian planting | Adding sinuosity Channel narrowing Channel naturalisation Creation of fish passes Removal of sluice gates | Fisheries | Fish: Abundance Invertebrates: Taxonomic composition Macrophytes | ||||||
Bakenhof Dyke reconstruction | 2001 | 1 January 2004 | creation of secondary channel | Creation of backwaters | Flood risk management Habitat and biodiversity | ||||||||
Ballinderry Freshwater Pearl Mussel Rescue Project | 1 January 2013 | 1 January 2015 | Improve the river for mussels to survive | Improving the scheme of captive-breeding of mussels | Community Education | Environmental flows and water resources Fisheries Habitat and biodiversity Hydromorphology Land use management - agriculture Monitoring Social benefits Water quality | |||||||
Barking Creek near A13 | 1 August 2004 | 31 March 2006 | retreat and renewal of folld defences construction of new intertidal area | New footpaths sand martin nesting tubes | Wheelchair access | Flood risk management Habitat and biodiversity Hydromorphology Social benefits Urban Estuary | |||||||
Barking Creekmouth | 31 March 2006 | Creation of backwaters | Channel realignment | Fisheries Flood risk management Habitat and biodiversity Social benefits Urban Estuary | Fish | ||||||||
Barn Elms Sports Ground | Reedbed creation Riparian planting | Fisheries Habitat and biodiversity | |||||||||||
Barn Elms Wetland Centre, South West London | Reedbed creation Creation of a lake Wetland habitat | Community Education Improved public access Public amenity and perception Visitor centre | Economic aspects Habitat and biodiversity Social benefits Urban | ||||||||||
Barnes Common | Flood risk management Habitat and biodiversity Social benefits | ||||||||||||
Barnes Common improvements | 20 December 2011 | Tree management Riparian planting mowing regime | Flow deflectors Reedbed creation | Fisheries Habitat and biodiversity Hydromorphology Urban | |||||||||
Barney Beck: Abandoned Metal Mines | Catchment Characterisation Programme to investigate water pollution from abandoned metal mines and determine remediation options of metal pollution | Developing partnerships with stakeholders deliver shared environmental outcomes | Environmental flows and water resources Habitat and biodiversity Monitoring Water quality | ||||||||||
Barton Brook | |||||||||||||
Bastion Maria (QUERCUS) | 1 April 2007 | 29 May 2010 | Recreation | Economic aspects Social benefits Water quality Urban | |||||||||
Bathgate Watercourse Restoration Project | 1 June 2016 | Introducing large woody debris Re-meandering | Flood risk management Habitat and biodiversity Hydromorphology Social benefits Spatial planning Urban | ||||||||||
Beam washlands | Offline storage areas | Economic aspects Flood risk management Habitat and biodiversity Hydromorphology Monitoring Social benefits | |||||||||||
Beck from the Brink | 1 April 2018 | Habitat and biodiversity | |||||||||||
Beddington Park | 1 January 2008 | Bank reprofiling Planting Removal of sediment Toeboard removal | Reedbed creation | Fisheries Flood risk management Habitat and biodiversity Hydromorphology Social benefits Water quality Urban | |||||||||
Beddington Park Enhancements | Weir modification Weir notched Bank reprofiling | Tree planting | Channel narrowing Cleaning of spawning gravels Reedbed creation | Flood risk management Habitat and biodiversity Hydromorphology Water quality Urban | |||||||||
Beek Lage Raam | 2012 | Stroombaanmaaien | Habitat and biodiversity Land use management - forestry Peat | ||||||||||
Beekherstel Beekloop | Environmental flows and water resources Habitat and biodiversity Hydromorphology | ||||||||||||
Beekherstel Beekloop BmN | 2010 | Dood hout 6 Vispassages Beschaduwing | Environmental flows and water resources Flood risk management Habitat and biodiversity Hydromorphology Water quality | ||||||||||
Beekherstel Buurserbeek | 2015 | Vergraven van de oever | Dood hout inbreng | Environmental flows and water resources Flood risk management Habitat and biodiversity Monitoring | Fish Invertebrates | Flow velocities Substrate conditions Width & depth variation | Nutrient concentrations Oxygen balance PH Temperature | Concentration phosphate, Chloride and Nitrogen | |||||
Beekherstel Eefsebeek | 2017 | Stroombaanmaaien | Habitat and biodiversity Monitoring | Fish Invertebrates Macrophytes | Flow velocities Substrate conditions Width & depth variation | Oxygen balance PH Temperature | |||||||
Beekherstel Keersop | 2015 | Hout in de beek | Beschaduwing | Environmental flows and water resources Hydromorphology | Fish Macrophytes | Flow velocities Quantity & dynamics of flow Width & depth variation | Nutrient concentrations Oxygen balance PH Temperature Transparency | ||||||
Beekherstel Lactariabeek | 2014 | Dead wood deposition | Environmental flows and water resources | Channel pattern/planform Flow velocities | |||||||||
Beekherstel Leerinkbeek | Beschaduwing | Dood hout inbreng | Flood risk management Habitat and biodiversity Monitoring | Fish Invertebrates | Flow velocities Substrate conditions Width & depth variation | Nutrient concentrations Oxygen balance PH Temperature | Concentration phosphate, Chloride and Nitrogen | ||||||
Beekherstel Ramsbeek | Beschaduwing | Dood hout inbreng | Habitat and biodiversity Monitoring | Fish Invertebrates | Flow velocities Substrate conditions Width & depth variation | Oxygen balance PH Temperature | Concentration phosphate, Chloride and Nitrogen | ||||||
Beekherstel Reusel Baarschot-Diessen | 1 January 2014 | Stroombaanmaaien | Traditioneel Beekherstel | Versterken van het landschap cultuurhistory en recreatie | Environmental flows and water resources Habitat and biodiversity Hydromorphology | Fish Macrophytes | Flow velocities Width & depth variation | Nutrient concentrations Oxygen balance PH Salinity Temperature Transparency | |||||
Beekherstel Willinkbeek | 2019 | Puinbestorting verwijderd | Environmental flows and water resources Habitat and biodiversity Monitoring | Width & depth variation | Oxygen balance PH Temperature | ||||||||
Beekherstel Zuidelijk Afwateringskanaal | 2017 | Stroombaanmaaien | Habitat and biodiversity Monitoring | Fish Invertebrates | Flow velocities Substrate conditions Width & depth variation | Oxygen balance PH Temperature | Concentration phosphate, Chloride and Nitrogen | ||||||
Beentjesgraven | Environmental flows and water resources Habitat and biodiversity Water quality | ||||||||||||
Belford Natural Flood Management Scheme, Northumberland | 2007 | leaky woody dams | Flood risk management Habitat and biodiversity Land use management - agriculture Monitoring Water quality | ||||||||||
Bell Green Weir fish passage | Weir modification | Improving fish migration | Fisheries | ||||||||||
Belton Floodplain Reconnection and River Restoration | 9 January 2017 | Channel narrowing Bank lowering Gravell added Tree Hinging | Floodplain lowering scrape added floodplain roughening Beaver dam analogue. | Flood risk management Habitat and biodiversity Social benefits | |||||||||
Beltringharder Koog Regulated Tidal Exchange Scheme | Habitat and biodiversity Estuary Marine | Fish Invertebrates Phytoplankton | Continuity of sediment transport | ||||||||||
Beneden Regge | Habitat and biodiversity Hydromorphology Monitoring Water quality | ||||||||||||
Beneden-Berkel | 1 September 2013 | Habitat and biodiversity Land use management - agriculture Water quality | |||||||||||
Beneden-Leeuwen-Side channel | 1 January 1994 | Bank reprofiling | Creation of backwater Side channel created | More natural water retention | Habitat and biodiversity Monitoring Water quality | Fish: Age structure Invertebrates Macrophytes | |||||||
Beverley Brook Flow control structures | Modelling Monitoring strategy | Environmental flows and water resources Fisheries Flood risk management Habitat and biodiversity | |||||||||||
Beverley Brook d/s of Rock’s Lane | habitat improvements | Tree planting Creation of backwaters coves and bays construction Reedbed creation | Improved public access | Fisheries Flood risk management Habitat and biodiversity Social benefits Urban | |||||||||
Beverley Park | 1 January 2008 | Bank reprofiling | Habitat creation Cut back of trees Creation of wetland Floodplain reconnection Restoring riparian vegetation | Channel realignment | Community Education Improved public access Public amenity and perception | Flood risk management Habitat and biodiversity Hydromorphology Social benefits Water quality Urban | |||||||
Big Yellow | 1 January 2010 | Deculverting | Economic aspects Habitat and biodiversity | ||||||||||
Bijloop | Environmental flows and water resources Habitat and biodiversity Water quality | ||||||||||||
Bio-engineering and creation of side channels along the rectified section of the Scarpe River in Arras | 1 January 2009 | 1 January 2012 | Removal of metal sheet piles installation of bio-engeneering bank protection Helophytes planted Installation of geotextile Gabion bed | Planting of helophytes at the foot of banks Seeding of work areas with a mix of herbaceous plant restoration of wooded areas by planting white willows Elimination of the invasive species found on site Creation of pond | Habitat and biodiversity Water quality | ||||||||
Bio-engineering techniques for bank protection on the Moselle River in Villey-le-Sec | 1 September 2011 | 1 December 2011 | Removal of metal sheet piles Installation of geotextile | Planting of helophytes at the foot of banks | Environmental flows and water resources Habitat and biodiversity | ||||||||
Birkin Brook Habitat Improvements, Cheshire | 4 January 2018 | Fisheries Habitat and biodiversity | |||||||||||
Blackbrook Slow the Flow, St Helens | 2012 | leaky woody dams | Flood risk management Habitat and biodiversity Hydromorphology Water quality | ||||||||||
Blackhorse Lane Waterfront Park | 1 January 2008 | Deculverting | Flood risk management Habitat and biodiversity Social benefits | ||||||||||
Blackwater River Habitat Enhancements & Fish Passage | 12 November 2014 | Introducing large woody debris Adding sinuosity Improvement of natural flows | Habitat enhancement Improving fish migration | Decreased flood risk | Environmental flows and water resources Fisheries Flood risk management Habitat and biodiversity Land use management - agriculture Water quality | ||||||||
Blake Avenue, Mayes Brook | Bank reprofiling | Reedbed creation | UK BAP habitat creation/restoration | Community Education Improved public access | Flood risk management | ||||||||
Blauwe Kamer | Habitat and biodiversity | ||||||||||||
Bleinheim Palace Project | 1 September 2005 | Planting Creation of pools and riffles Introduction of spawning gravels | Creation of backwaters | Channel narrowing | Habitat and biodiversity Hydromorphology Water quality | ||||||||
Bockhampton Enhancement | Environmental flows and water resources Fisheries Habitat and biodiversity Hydromorphology | ||||||||||||
Bocking Blackwater River Restoration | 1 August 2012 | Soft engineering solutions Bank improvement Channel reprofiling Bank reprofiling | Erosion protection Creation of backwaters Creation of wetland Creation of pond | Awareness raising Citizen participation in the restoration project | Habitat and biodiversity Water quality Urban | ||||||||
Bocq river (Walphy - LIFE project) | 1 January 2009 | 31 December 2013 | Barrier removal | Creation of fish spawn nursing places Improvement culvert bed | Adding sinuosity | Habitat and biodiversity Hydromorphology Monitoring | |||||||
Boldersbeek | Environmental flows and water resources Flood risk management Habitat and biodiversity Water quality | ||||||||||||
Bonesgate Phase 2 | 1 January 2008 | Bank reprofiling | Creation of pond | Creation of meanders | Aesthetics Improved public access | Fisheries Habitat and biodiversity Social benefits | |||||||
Boosting slivso | 1 January 1999 | Creation of dike Introduction of gravel | Creation of wetland Creation and flooding of lake | Land use management - agriculture Habitat and biodiversity Monitoring Water quality | Fish: Abundance Fish: Species composition Invertebrates Macrophytes | Nutrient concentrations | |||||||
Borrowash fish pass | 2 January 2012 | 21 September 2012 | Larinier fish pass | Fisheries | |||||||||
Boston Manor | Creation of wetland | Habitat and biodiversity | |||||||||||
Boulder Pool and Plough Lane | 1 January 2008 | Bank reprofiling | Creation of backwater | Improved public access | Flood risk management Habitat and biodiversity Social benefits | ||||||||
Bourne End Recreation Ground River Enhancement Project | 4 May 2015 | 24 February 2016 | Creation of pools Fish habitat restoration Introducing large woody debris Habitat restoration | Habitat creation Tree management | Channel narrowing Re-meandering | Community involvement | Environmental flows and water resources Fisheries Habitat and biodiversity Hydromorphology Social benefits Urban | ||||||
Boven-Dommel | Habitat and biodiversity Water quality | ||||||||||||
Bow Brook Floodplain Restoration | Fisheries Habitat and biodiversity Hydromorphology Land use management - agriculture Water quality | ||||||||||||
Bow Brook Living Landscape | Introducing large woody debris Soft erosion solutions Bank reprofiling Cattle drinkers | Creation of wetland Fencing Tree planting Pollarding Control of invasive species | Arable reversion to wildflower meadow Soil Health Plan | Flylife course Landowners advised | Fisheries Habitat and biodiversity Land use management - agriculture Monitoring Water quality | ||||||||
Bowston Weir Removal | 16 June 2016 | 30 September 2020 | removal of dams Rock ramp construction | Channel naturalisation | Engagement with a wide range of stakeholders | Flood risk management Habitat and biodiversity Hydromorphology Social benefits | Channel pattern/planform Continuity for organisms Continuity of sediment transport Quantity & dynamics of flow | Bat Survey Bathymetric Survey Flood risk management general assessment of habitat quality and diversity (repeat photography) | |||||
Bowthorpe Meadow, River Yare | 1 April 2018 | Habitat and biodiversity | |||||||||||
Brackenhurst Natural Flood Management | 2016 | establishment of woodland | Runoff pathway management | Flood risk management Habitat and biodiversity Land use management - agriculture Land use management - forestry Monitoring | |||||||||
Braid Burn at Inch Park | 1 January 2009 | 1 August 2012 | Embankment creation | Floodplain reconnection | Adding sinuosity | Flood risk management Habitat and biodiversity | |||||||
Brent Lodge Park Improvement | 1 January 2008 | Deculverting Removing of concrete structures | Reedbed creation | Creation of backwater | Aesthetics | Economic aspects Environmental flows and water resources Habitat and biodiversity | |||||||
Brent River Improvement Project- Brent Lodge Park to Ruislip Road Eastruislip | 4 January 2018 | Habitat and biodiversity | |||||||||||
Brent River Park Phase II | 1 January 2010 | Removing of concrete structures | Creation of meanders | Improved public access | Economic aspects Flood risk management Habitat and biodiversity Social benefits | ||||||||
Brightside Weir Fish Pass | Creation of fish passes | Fisheries Habitat and biodiversity Urban | |||||||||||
Bringing Back the Bulbourne | 1 June 2013 | Re-grading Bed raising | Scrapes Floodplain reconnection | Channel narrowing Introducing large woody debris | Citizen participation in the restoration project | Fisheries Habitat and biodiversity Land use management - agriculture Monitoring Social benefits Water quality | |||||||
Bristol Frome Diffuse Pollution Project | Agricultural/Farming improvements improvement of structure of agricultural land | Farm advice and plans | interacting with farmers | Habitat and biodiversity Land use management - agriculture Water quality | |||||||||
Broadwater Brook | 1 January 2017 | 31 December 2021 | Channel realignment | Channel realignment Conservation measures and environmental improvement Creation of multi stage channel Habitat creation | Channel realignment Creation of new channel Habitat creation Habitat restoration Improvement of channel morphology | Agricultural business changed its way of working Arable reversion to wildflower meadow Clean-up days Diffuse pollution mitigation Easier management Ensuring biodiversity Monitoring strategy | Active involvement of local interests groups and land owners Agreement with the owners Awareness raising Awareness raising by a sign Citizen participation in the restoration project Community Education Community Events Community Litter-picking work Community based management Community consultation Community education (talks and workshops Community involvement Creation of a path alongside the river Decreased flood risk Engagement with a wide range of stakeholders Engagement with schools Improved public access Information panels for people | Habitat and biodiversity Land use management - agriculture Social benefits Water quality Urban | Fish: Species composition Invertebrates: Taxonomic composition | Continuity of sediment transport | Nutrient concentrations Oxygen balance | Bat Survey Birds Concentration phosphate, Chloride and Nitrogen Macroinvertebrates (IBMWP) | |
Broadway Fields/ Seagers Distillary | Bank reprofiling Removing of concrete structures | Economic aspects Fisheries Habitat and biodiversity | |||||||||||
Broom Road Recreation Ground | 1 January 2009 | Bank reprofiling Removing of sheet piling | Flood risk management Habitat and biodiversity | ||||||||||
Building with Nature | Flood risk management Habitat and biodiversity Land use management - forestry Monitoring Peat | ||||||||||||
Buiten Ooij | 1 January 2008 | Water release into floodplain in winter Closing of sluice in summer Future floodplain lowering | Creation of side channel | more natural reservoir releases | Economic aspects Habitat and biodiversity Monitoring Water quality | Fish: Abundance Fish: Species composition Invertebrates Macrophytes | Continuity of sediment transport | ||||||
Bullhead Dock and Bellamy’s Wharf - Rotherhithe | Introducing large woody debris | Reedbed creation | New shingle beach | Economic aspects Flood risk management Habitat and biodiversity | |||||||||
Bures Mill fish by-pass | Fish by-pass channel | Fisheries | |||||||||||
Burn of Balmaleedy Restoration, Marykirk | 1 March 2010 | 30 September 2019 | Step-pool section at d/s end of restored reach | Re-meandering | Flood risk management | ||||||||
Burn of Mosset, Forres | 1 January 2008 | 31 December 2008 | Create breaches in the bank | Floodplain reconnection Riparian planting | Channel naturalisation | Fisheries Flood risk management Habitat and biodiversity Hydromorphology | |||||||
Burton Weir (Upper) Fish Pass Project | 1 July 2015 | 1 March 2015 | Weir removal/modification for easement of fish passage | Habitat and biodiversity | |||||||||
Bury Lodge Wetlands | 6 August 2012 | Creation of wetland | Improved public access Recreation | Environmental flows and water resources Flood risk management Habitat and biodiversity Monitoring Social benefits Water quality Urban | |||||||||
Butter Hill Phase 2 | 31 October 2010 | Weir notched Bank reprofiling Introduction of gravel Introducing large woody debris Planting of native species | Large scale planting of native species | Channel narrowing | Community Events Community consultation | Fisheries Habitat and biodiversity Social benefits Urban | |||||||
Buulder Aa | Habitat and biodiversity Hydromorphology | ||||||||||||
Buzzards Mouth Creek | Economic aspects Habitat and biodiversity | ||||||||||||
CASE STUDY OF QUALITY IMPROVEMENT IN SHROPSHIRE WILDLIFE TRUST AREA | Land use management - agriculture Water quality | ||||||||||||
Cain weir removal | Environmental flows and water resources Fisheries Habitat and biodiversity Water quality | ||||||||||||
Camargue’s former saltworks | 1 January 2008 | Reconnection between the sea and the lagoons artificial bird nesting islands. installation of water sluices | wetland management | Environmental flows and water resources Fisheries Habitat and biodiversity | |||||||||
Cardiff Rivers Group | Environmental flows and water resources Habitat and biodiversity Social benefits Water quality Urban | ||||||||||||
Carnon River: Abandoned Metal Mines | 1 July 2013 | Remediation Treatment | Environmental flows and water resources Habitat and biodiversity Monitoring Water quality | ||||||||||
Castle Acre Rehabilitation Project | Creation of pools and riffles | Channel narrowing | Habitat and biodiversity | ||||||||||
Castle Irwell Urban Wetland | 13 August 2014 | 10 July 2017 | Introducing large woody debris Floodplain reconnection Floodplain creation Buffer strips Habitat creation | Habitat management | Community Events Community consultation River open days School Tours | Flood risk management Habitat and biodiversity Social benefits Urban | |||||||
Catford Greyhound Stadium | 1 January 2008 | Deflectors Introduction of gravel | Habitat and biodiversity | ||||||||||
Chambers Wharf | 1 January 2008 | 31 December 2013 | Bank improvement | removal of jetty | Brownfield land regeneration SUDS green roofs nesting boxes roosting posts | Riverside walkway | Flood risk management Habitat and biodiversity Spatial planning Urban Estuary | ||||||
Channel Sea | 1 January 2008 | Reedbed creation | Improved public access | Habitat and biodiversity | |||||||||
Charlton St Peter A 8 | 1 January 2009 | Bed raising Weir modification Weir removal | Remeandering Modifying bank protection Lowering of embankments Riparian planting | Channel narrowing Enhancing flow diversity Fencing Introducing large woody debris Re-instatement of old course altering flow splits | Fisheries Flood risk management Habitat and biodiversity | ||||||||
Chase Nature Reserve | 1 January 2008 | Fencing | Creation of backwater | Fisheries Habitat and biodiversity | |||||||||
Chelmer Valley Local Nature Reserve | Creation of berms | Lowering of embankments Floodplain reconnection Riparian habitat restoration | Flood risk management Habitat and biodiversity Hydromorphology Social benefits Water quality | ||||||||||
Cheriton Stream Restoration Project | 1 April 2018 | Fisheries Habitat and biodiversity | |||||||||||
Chertsey meads | 1 January 2010 | Bank reprofiling Introduction of gravel | Habitat and biodiversity Hydromorphology | ||||||||||
Chigwell Brook | 1 January 2008 | Deculverting Toe protection Bank reprofiling | Flood risk management Habitat and biodiversity | ||||||||||
Chinbrook Meadows Wetlands | 2016 | Partial diversion of river | Wetland habitat | Planting wildflower mixes Riparian tree planting plug planting | Community Events Community Litter-picking work Community consultation Volunteer work parties using the local community. | Environmental flows and water resources Flood risk management Habitat and biodiversity Monitoring Social benefits Water quality Urban | |||||||
Ching Brook at Walthamstow Greyhound Stadium | 1 January 2008 | Deculverting | Flood risk management Habitat and biodiversity Social benefits | ||||||||||
Chowder Ness Managed Realignment Scheme | Habitat and biodiversity | Invertebrates | |||||||||||
Civic Way, Yeading Brook | Bank reprofiling | Hydromorphology | |||||||||||
Clayton Vale | Weir removal | Flood risk management Habitat and biodiversity Hydromorphology Social benefits Urban | |||||||||||
Clitherow's Island, Brentford eel pass | 1 January 2012 | Creation of fish passes | Fisheries | ||||||||||
Clugston Burn (CASS) | 1 July 2005 | 31 December 2005 | Removal of debris | Environmental flows and water resources Fisheries Habitat and biodiversity | |||||||||
Colfes School | 1 January 2008 | Bank reprofiling Removing of concrete structures | Creation of meanders | Aesthetics Community Education Improved public access | Fisheries Flood risk management Habitat and biodiversity Social benefits | ||||||||
Colliers Row | 1 January 2010 | Bank reprofiling Deflectors | Habitat and biodiversity Social benefits | ||||||||||
Colne Brook | 1 January 2008 | Tree management | Habitat and biodiversity Social benefits | ||||||||||
Colne Water Restoration Project | 1 July 2012 | 1 March 2015 | Tree planting Bank stabilisation | Removing barriers to water organisms migration in the river | Awareness raising | Economic aspects Habitat and biodiversity Hydromorphology Social benefits Water quality | |||||||
Columbia Wharf | Creation of pond | Economic aspects Habitat and biodiversity Social benefits | |||||||||||
Community Wetlands | 2005 | Creation of wetland Scrapes Floodplain spillways Floodplain reconnection water meadow creation | Reedbed creation | Community Education Viewing platform | Habitat and biodiversity Water quality | ||||||||
Compton Island and Meanders | 1 April 2018 | Flood risk management Habitat and biodiversity | |||||||||||
Coniston Cold weir removal | Fisheries Habitat and biodiversity | ||||||||||||
Coniston Copper Mines | Monitoring | ||||||||||||
Connswater Community Greenway | Economic aspects Environmental flows and water resources Flood risk management Habitat and biodiversity Monitoring Social benefits Spatial planning Water quality Urban | ||||||||||||
Conservation strategies for forest and wild river in Gesaeuse: the Johnsbach Beck restoration | 1 February 2005 | 1 August 2011 | Creation of gravel banks Removal of bank reinforcements | Habitat and biodiversity Hydromorphology Monitoring Social benefits | |||||||||
Conservation strategies for forest and wild river in Gesaeuse: the River Enns restoration | 1 August 2005 | 1 February 2011 | Creation of gravel banks Bank improvement Creation of pools and riffles Bank stabilisation Bank protection | Creation of pond Develop riparian forest | Creation of a new estuary | Monitoring strategy | Community Education | Habitat and biodiversity Hydromorphology Land use management - forestry Monitoring | |||||
Contournement d’un plan d’eau de loisirs sur le Gratteloup au niveau de la commune de La Ville-aux-Clercs | 1 January 1998 | 31 December 1998 | Creation of a bypass Creation of banks Installation of a mobile threshold Installation of a valve rack | Fisheries Habitat and biodiversity Social benefits Water quality | |||||||||
Corfe River | 1 April 2018 | Habitat and biodiversity | |||||||||||
Cornmill Gardens (QUERCUS) | 31 December 2007 | Removal of concrete banks and bed Bank reprofiling | Buffer strips | Improvement of channel morphology | Social benefits Spatial planning | ||||||||
County Gardens, Mayes Brook | Creation of wetland | Creation of backwater | Flood risk management Habitat and biodiversity | ||||||||||
Coutershaw FIP Project | 4 January 2018 | Fisheries Habitat and biodiversity | |||||||||||
Craigton Riparian and NFM Orchard Planting | 1 August 2013 | 8 March 2014 | Creation of wet woodland orchard | Volunteer engagement | Economic aspects Fisheries Flood risk management Habitat and biodiversity Social benefits | ||||||||
Crane Meadows Meander Connections | Riffle creation | Removal of channel blockages | Environmental flows and water resources Fisheries Flood risk management Habitat and biodiversity Hydromorphology Social benefits Urban | ||||||||||
Crane Park | 1 January 2008 | Reedbed creation Tree management | UK BAP habitat creation/restoration | Habitat and biodiversity | |||||||||
Cranford Park Phase 2 | 1 January 2010 | Deflectors | Tree management | Habitat and biodiversity | |||||||||
Cray River Enhancement | 1 January 2009 | Tree management | Environmental flows and water resources Habitat and biodiversity Social benefits | ||||||||||
Creamery Weir fish barrier easement | 1 September 2014 | Weir removal | Fisheries Habitat and biodiversity Hydromorphology | ||||||||||
Creation of a Constructed Farm Wetland | Habitat and biodiversity Land use management - agriculture Water quality | ||||||||||||
Creation of flood channels and restoration of exchanges between the flood plain and the low-flow channel on the Vezouze | 1 May 2007 | 31 August 2007 | Construction of flood channels Removal of material Pond creation Side channel creation setting up of check valves & pumping stations | Tree planting Planting of helophytes at the foot of banks | Channel widening | Flood risk management Habitat and biodiversity Hydromorphology Monitoring Social benefits Urban | |||||||
Crosthwaite Deculverting | 1 April 2018 | Fisheries Habitat and biodiversity | |||||||||||
Création d’un bras de contournement de plusieurs étangs sur le Fliez et restauration du marais de Contes | 1 November 2013 | 31 December 2015 | Removal of nozzles which provided a connection hydraulics and fish farming directly between Fliez and ponds Creation of a bypass Riverbed restoration Bank modification | Adding sinuosity | An educational trail is set up to improve access to the site and facilitate leisure activities | Habitat and biodiversity Hydromorphology Land use management - agriculture Land use management - forestry Social benefits Water quality | |||||||
Cuckolds Haven Nature Area | 1 October 2004 | 31 March 2006 | Riparian planting | Interpretation boards Viewing platform Wheelchair access | Habitat and biodiversity Social benefits Urban | ||||||||
Cuddington Park | 1 January 2008 | Habitat and biodiversity Spatial planning | |||||||||||
Cudworth dyke restoration project | 10 January 2011 | Creation of meanders | Environmental flows and water resources Flood risk management Habitat and biodiversity Hydromorphology Monitoring Social benefits Water quality Urban | Fish: Species composition Invertebrates Macrophytes | Oxygen balance Specific non-synthetic pollutants | ||||||||
Cumbria Angler Engagement | |||||||||||||
Cumbria River Restoration Program - Whitbeck restoration project - West Cumbria | 1 March 2014 | 1 September 2014 | River channel diversion Floodplain reconnection Habitat creation | Tree planting | Fisheries Flood risk management Habitat and biodiversity Hydromorphology Land use management - agriculture Land use management - forestry Monitoring Social benefits | ||||||||
Cumbria River Restoration Strategy | 3 March 2014 | Working in collaboration with the River Trusts who plan and deliver these projects | Environmental flows and water resources Habitat and biodiversity Hydromorphology | ||||||||||
Dagenham Brook de-silting | 1 January 2009 | Removal of sediment | Flood risk management Habitat and biodiversity | ||||||||||
Dagenham Washlands Phase 2 | 1 January 2008 | Bank reprofiling | Creation of wetland | Creation of backwater Creation of meanders | UK BAP habitat creation/restoration | Environmental flows and water resources Flood risk management Habitat and biodiversity Social benefits | |||||||
Darent Valley Path | 1 January 2011 | Bank reprofiling | Creation of meanders | Economic aspects Habitat and biodiversity | |||||||||
Darley Abbey Fish Pass Project | 1 July 2012 | 1 March 2015 | Creation of fish passes | Community Events Community consultation Heritage walks Interpretation boards | Environmental flows and water resources Fisheries Habitat and biodiversity | ||||||||
Day Brook Rain Gardens | Sustainable urban drainage ponds (SUDs) | Awareness raising | Flood risk management Habitat and biodiversity Monitoring Social benefits Urban | ||||||||||
Day Brook Restoration - Gedling | Channel reprofiling Recovery of channel morphology | Floodplain reconnection | Channel naturalisation Re-meandering | Awareness raising | Flood risk management Habitat and biodiversity Urban | ||||||||
Ddu Restoration Project | 1 June 2005 | Boulder restoration Addition of substrate and in channel features | Fencing of riparian zone | Creation of fish passes | Deculverting | Agricultural business changed its way of working | Fisheries Habitat and biodiversity Hydromorphology Land use management - agriculture Monitoring | ||||||
De Doorbraak | Habitat and biodiversity Hydromorphology Water quality | ||||||||||||
De-culverting Moselle Brook at Lordship Recreation Ground | Culvert replacement/repair Bank reprofiling | Riparian planting Sustainable urban drainage ponds (SUDs) | Deculverting | Improved public access Information panels for people Riverside walkway | Habitat and biodiversity Social benefits | Invertebrates | River Habitat Survey | ||||||
Debenham Flood Storage Options - flood modelling and economic assessment | Runoff pathway management | Flood risk management Habitat and biodiversity Hydromorphology Land use management - agriculture Water quality | |||||||||||
Defra Strategic Environmental Partnership Project (DSEPP) 2011 | 2011 | Joining of River Trusts | Fisheries Habitat and biodiversity Land use management - agriculture Water quality | ||||||||||
Delivering Multiple Benefits for Water on Foston Brook | 30 June 2015 | Fenced off riverbank | Hardened crossing points drinking bays | Farm advice and plans | Land use management - agriculture Water quality | ||||||||
Derbyshire Habitat Improvements | 1 April 2018 | Habitat and biodiversity | |||||||||||
Deurningerbeek | Habitat and biodiversity Monitoring Water quality | ||||||||||||
Devon Beaver Project and River Otter Beaver Trail | 2011 | leaky woody dams | Economic aspects Flood risk management Habitat and biodiversity Hydromorphology Land use management - agriculture Land use management - forestry Monitoring Social benefits Water quality | ||||||||||
Diffusing the Issue in Rural Ribble - River Loud | Tree planting | Improving fish migration | Economic aspects Habitat and biodiversity Social benefits Water quality | ||||||||||
Diffusing the Issue in rural Ribble | 1 July 2012 | 1 March 2015 | Bank reprofiling Reduce diffuse pollution | Barrier removal Small scale easement installation Tree plantation Creation of fish passes Fish habitat restoration | Farm infrastructure interventions UK BAP habitat creation/restoration | Fencing Non/agricultural business changed its way of working | Community involvement | Economic aspects Fisheries Habitat and biodiversity Land use management - agriculture Social benefits Water quality | |||||
Diffusing the Issue in rural Ribble - Easington | 1 July 2012 | 1 March 2015 | Bank reprofiling Reduce diffuse pollution Weir removal/modification for easement of fish passage | Tree planting Fencing | Farm infrastructure interventions UK BAP habitat creation/restoration | Agricultural business changed its way of working | Community involvement | Economic aspects Fisheries Habitat and biodiversity Land use management - agriculture Social benefits Water quality | |||||
Diffusing the Issue in rural Ribble - Skirden Beck | 1 July 2012 | 1 March 2015 | Bank reprofiling Weir removal/modification for easement of fish passage | Tree planting Fencing | Farm infrastructure interventions UK BAP habitat creation/restoration | Agricultural business changed its way of working | Community involvement | Economic aspects Fisheries Habitat and biodiversity Land use management - agriculture Social benefits Water quality | |||||
Diffusing the Issue in rural Ribble - Stock Beck | 1 July 2012 | 1 March 2015 | Bank reprofiling | Tree planting Fencing | Farm infrastructure interventions UK BAP habitat creation/restoration | Agricultural business changed its way of working | Community involvement | Economic aspects Fisheries Habitat and biodiversity Land use management - agriculture Social benefits Water quality | |||||
Diffusing the Issue in rural Ribble - Swanside | 1 July 2012 | 1 March 2015 | Bank reprofiling Reduce diffuse pollution | Barrier removal Small scale easement installation Tree plantation Creation of fish passes Fish habitat restoration | Farm infrastructure interventions UK BAP habitat creation/restoration | Fencing Non/agricultural business changed its way of working | Community involvement | Economic aspects Fisheries Habitat and biodiversity Land use management - agriculture Social benefits Water quality | |||||
Dinkel Noord | Habitat and biodiversity Hydromorphology Water quality | ||||||||||||
Diversion of the River Nith | Introduction of gravel Habitat diversification Bank stabilisation Bank protection | Containment bund to prevent flooding | Addition of boulders to bed Fish habitat restoration | Economic aspects Habitat and biodiversity | Invertebrates Macrophytes | Channel bed morphology. Substrate particle size/composition. | |||||||
Dommeldal: cross-border habitat restoration in the Dommel Valley | |||||||||||||
Dorset CPAF Projects | Buffer strips Floodplain reconnection | Cut back of trees | Environmental flows and water resources Fisheries Habitat and biodiversity Land use management - agriculture Monitoring Social benefits Water quality | ||||||||||
Dove Weir removal | 1 July 2010 | Vegetation cut back Weir removal | Cut back of trees Introducing large woody debris | Adding sinuosity | Information for the public | Habitat and biodiversity Hydromorphology Land use management - agriculture Monitoring Spatial planning | Fish: Abundance Fish: Species composition | Substrate conditions | |||||
Dovers Corner | Bank reprofiling | Improved public access | Economic aspects Flood risk management Habitat and biodiversity Social benefits | ||||||||||
Downham Playing Fields | Habitat and biodiversity Social benefits Urban | ||||||||||||
Downton Millennium Gardens- Hampshire Avon | 1 April 2018 | Fisheries Habitat and biodiversity | |||||||||||
Drayton | 1 December 2011 | Deflectors Bank stabilisation Cattle drinkers Introduction of gravel | Tree planting Tree management | Channel narrowing | Fencing | Habitat and biodiversity | Fish Invertebrates | Substrate conditions | |||||
Dumbreck Marsh & Garrel Burn Restoration | 1 April 2016 | re-meandering lowland shallow channel form pool/riffle sequences | Floodplain reconnection with Dumbreck Marsh LNR | Re-meandering | Community council access forum engagement plus education days with local school children via Clyde River Foundation rotary club | Environmental flows and water resources Fisheries Habitat and biodiversity Hydromorphology Social benefits Urban | |||||||
Dunruchan Farm Peatland Restoration Project | 2015 | Surface drainage systems improved | Flood risk management Habitat and biodiversity Water quality | ||||||||||
Dunston Beck Restoration | 16 November 2014 | 29 March 2017 | faggot berms Creation of wooden deflectors | Community involvement Engagement with schools | Environmental flows and water resources Habitat and biodiversity Hydromorphology Social benefits | ||||||||
Durand Close | 1 January 2008 | Bank reprofiling | Fisheries Habitat and biodiversity Social benefits | ||||||||||
Dysart Park, Grantham Habitat Improvement | 9 January 2020 | Day lighting and addition of woody material to form narrowing berms | Volunteer work parties using the local community. | Habitat and biodiversity | |||||||||
Démantèlement de l’ouvrage du Pont Fourneau sur la Selle | 1 September 2010 | 28 February 2011 | Barrier removal Creation of mini-treshold Installation of fish caches Installation of geotextile Planting | Habitat and biodiversity Hydromorphology | |||||||||
Démantèlement de neuf ouvrages sur le cours de l’Aa | 1 July 2009 | 30 September 2009 | Dismantling of the gates that block the water current Creation of fish pass | Bottom racks and banks were kept in order to prevent erosion One gate was kept in the river to prevent erosion | Flood risk management Habitat and biodiversity Hydromorphology Social benefits | ||||||||
Dérivation et recréation du lit mineur du ruisseau de Bel Orient au droit de quatre plans d’eau à Gueltas | 1 September 2009 | 31 December 2011 | Installation of a distribution structure and monks Creation of a bypass Filling of drainage ditches rehabilitation of ponds Three tresholds are removed or redevelopped Removal of ponds Bank protection | Meandering channel | The level of the water bodies is lowered during two months in summer and are completely drained every three to five years. | Flood risk management Habitat and biodiversity Land use management - agriculture | |||||||
EDF Weir removal | 1 January 2010 | Weir removal | Fisheries | ||||||||||
ERCIP - European River Corridor Improvement Plans | Economic aspects Flood risk management Habitat and biodiversity Hydropower Land use management - forestry Social benefits Spatial planning Water quality | ||||||||||||
East Devon Diffuse Pollution Project | 19 August 2015 | 1 August 2016 | Restored species-rich wet grasslands | Land use management - agriculture Water quality | |||||||||
East Mascalls Fish Pass | Creation of fish passes | Fisheries | |||||||||||
East Tullos Burn Environment Improvements Project | Economic aspects Environmental flows and water resources Flood risk management Habitat and biodiversity Hydromorphology Monitoring Social benefits Water quality Urban | ||||||||||||
Eastridge Estate restoration project | 1 October 2013 | Creation of fish passes Introduction of gravel | lowering river bank | Channel narrowing Introducing large woody debris | Environmental flows and water resources Fisheries Habitat and biodiversity Hydromorphology | ||||||||
Eau Blanche River (Walphy - LIFE project) | 1 January 2009 | 31 December 2014 | Creation of fish spawn nursing places | Habitat diversification | Creation of meanders Reconnection of cutoff meander | Habitat and biodiversity Hydromorphology Monitoring | |||||||
Ecclesbourne Farm project | 1 April 2014 | 31 March 2015 | Installing riverside fencing pasture pumps trackway improvements | Fisheries Habitat and biodiversity Land use management - agriculture Water quality | |||||||||
Eddleston water | 2009 | 1 May 2013 | Introducing large woody debris Embankment renaturalization | Connection to wider floodplain Floodplain creation | Meandering channel | Flood risk management Habitat and biodiversity Hydromorphology Land use management - agriculture Monitoring Social benefits Water quality | |||||||
Eden Crayfish Restoration Project | 20 July 2012 | Planting Installing riverside fencing | Agricultural/Farming improvements Best practice for river habitat restoration | Economic aspects Fisheries Habitat and biodiversity Land use management - agriculture Monitoring Social benefits Water quality | |||||||||
Eden crayfish eDNA project | Habitat and biodiversity Hydromorphology Water quality | ||||||||||||
Edgeware Brook, Honeypot Lane | Deculverting | Habitat and biodiversity | |||||||||||
Eel Pass over tilting weir at Ravensbury Park | 1 January 2012 | Weir modification | Fisheries | ||||||||||
Effacement du seuil de Carayon sur le Thoré | 1 July 2011 | 30 November 2011 | Removal of treshold Removal of supply canal to protect the banks Arches have been cleared Placement of stone walls dry work by setting up a cofferdam to temporarily deflect flow of the watercourse | Realization of an electric fishing of backup | Flood risk management Habitat and biodiversity Hydropower Hydromorphology Land use management - agriculture Urban | ||||||||
Effacement du seuil de Chelles Basse sur le Miodet | 1 June 2010 | 31 July 2010 | Abundant sand was being put on the banks Barrier removal Blocks were used to diversify the flow | Cutting trees that could be a potential danger Setting up of a diversion channel | Flood risk management Habitat and biodiversity Hydropower Hydromorphology Land use management - agriculture | ||||||||
Effacement du seuil du Moulin d’Hatrize sur l’Orne | 1 March 2011 | 31 October 2011 | Removal of spillway Destruction of large part of the dike Implantation of vegetated banquettes Bank stabilisation Planting | Creation of meanders Development of a flow control structure tightening of the minor bed | Flood risk management Habitat and biodiversity Land use management - agriculture Social benefits | ||||||||
Effacement du seuil du moulin du Bourg sur le Vicoin | 1 June 2011 | 31 October 2012 | Removal of central slab valves and spillway Creation of ramp Placing of mini-treshold in order to stabilise banks Tree planting Planting of grass | Environmental flows and water resources Fisheries Habitat and biodiversity Hydromorphology | |||||||||
Effacement partiel de 14 seuils sur le Mutterbach et l’Hosterbach à Holving et Hoste | 1 September 2009 | 30 November 2009 | Creation of notches Planting of grass Tree planting | Laying of drinking troughs and the creation of pits to house the fish fauna. | Maintenance of anchorages and other structures | Flood risk management Habitat and biodiversity Hydromorphology Water quality | |||||||
Effacement partiel de cinq seuils sur le ruisseau du Bagas | 1 October 2009 | 30 November 2009 | Partially deletion of barriers Building of armourstone downstream of the structure was built to consolidate the bank and create a channel preferential flow to guide the fish | The work was carried out dry by temporary diversion of the watercourse (cofferdam pumping and return of water downstream site) to limit their impact on the environment. | Environmental flows and water resources Habitat and biodiversity Hydromorphology Land use management - agriculture | ||||||||
Effacement partiel du seuil Cros sur la Dunière | 1 August 2009 | 31 December 2009 | Removal of a part of the dam up to 1 m Installation of three mini tresholdsto prevent erosion realization of a fishery backup and dry work with the installation of a cofferdam to temporarily deflect the flows Installation of geotextile Bank protection | Flood risk management Habitat and biodiversity Hydromorphology | |||||||||
Effacement partiel du seuil de Vas sur le Céans | 1 October 2007 | 31 October 2007 | Partially deletion of barriers Deposition of blocks to counter erosion and create a diverse profile | Preservation of side walls to prevent erosion | Economic aspects Environmental flows and water resources Habitat and biodiversity Hydromorphology Land use management - agriculture | ||||||||
Elgin Flood Alleviation Scheme | 1 January 2005 | Bank improvement Channel reprofiling Creation of berms Depth variation | Lowering of floodplain Creation of wetland Removal of embankments | Creation of new channel | Community Education Community consultation | Economic aspects Fisheries Flood risk management Habitat and biodiversity Hydromorphology Monitoring Social benefits Water quality Urban | |||||||
Elimination of a pond along the Erve River and conservation of the historical heritage in Sainte-Suzanne-et-Chammes | 1 May 2010 | 31 August 2010 | Emptying reservoir Removal of flap gate Removal of spillway Dam removal Creation of side leats Implementation of distribution structures | Planting of banks | Environmental flows and water resources Habitat and biodiversity Hydromorphology Social benefits Water quality | ||||||||
Elmbridge Meadows | Aesthetics Recreation | Fisheries Flood risk management Habitat and biodiversity | |||||||||||
Emergency works after breach on Lough Neas Drain (Cloghcor) | Bed raising rock groynes Channel reprofiling Creation of pools and riffles | Removal of a flap valve | Fisheries Flood risk management | ||||||||||
Emmanuel’s Common Reconnection Project | 2 June 2014 | 14 November 2014 | Reinstating old channel Remeandering | Fisheries Habitat and biodiversity Hydromorphology | |||||||||
Ems floodplain | 1 January 2004 | Removal of bank reinforcements | Develop riparian forest Protect/restore riparian zone | Channel widening Lengthening of channel | Wildlife improvement | Habitat and biodiversity Hydromorphology Monitoring Social benefits | Fish: Abundance Fish: Species composition | Channel pattern/planform | Public use of trails | ||||
Enfield Town Park Wetlands | Environmental flows and water resources Flood risk management Social benefits Urban | ||||||||||||
Enhancement of the River Crouch following a pollution incident | 21 December 2012 | 10 October 2014 | Bank reprofiling | Woody-debris flow deflectors | Interpretation boards | Fisheries Habitat and biodiversity Hydromorphology Social benefits | |||||||
Enhancements in Hampstead Heath | 1 January 2008 | Creation of wetland | Flood risk management Habitat and biodiversity Social benefits | ||||||||||
Enler River enhancement project | 4 November 2013 | 25 April 2014 | Deflectors Creation of groynes Riffle creation Introduction of spawning gravels Fish habitat restoration | Fisheries Habitat and biodiversity Hydromorphology | Fish | Channel pattern/planform Freshwater flow regime Width & depth variation | |||||||
Ennerdale Mill Weir Removal | 4 January 2017 | 31 July 2019 | Weir removal | Environmental flows and water resources Fisheries Habitat and biodiversity Hydromorphology Urban | |||||||||
Essex Healthy Headwaters River Restoration Project | 1 July 2012 | 1 March 2015 | Bank reprofiling Diversification of in-channel features | Farm infrastructure interventions | Community involvement | Economic aspects Habitat and biodiversity Hydromorphology Monitoring Social benefits | |||||||
Essex Wharf | 1 January 2008 | Reedbed creation | Economic aspects Fisheries Habitat and biodiversity Social benefits | ||||||||||
European Fisheries Fund | 1 September 2009 | 1 August 2012 | Habitat restoration Removal of fish barriers Cut back of trees | Fisheries Habitat and biodiversity | |||||||||
Evenlode Catchment Project | 2016 | Runoff pathway management | Flood risk management Habitat and biodiversity Hydromorphology Land use management - agriculture Land use management - forestry Monitoring Water quality | ||||||||||
Exmoor Mires Partnership | 2010 | Moorland restoration Surface drainage systems improved | Flood risk management Habitat and biodiversity Hydromorphology Land use management - agriculture Land use management - forestry Monitoring Social benefits Water quality Peat | ||||||||||
Eycott Hill | 2014 | Surface drainage systems improved | Flood risk management Habitat and biodiversity Hydromorphology | ||||||||||
Fairham Brook Restoration Project | 2 April 2012 | 31 March 2015 | Diversification of in-channel features Creation of fish passes Cut back of trees | Tree management | Environmental flows and water resources Fisheries Flood risk management Habitat and biodiversity Land use management - agriculture Water quality | ||||||||
Fairlop Plain and Fairlop Water | Deculverting Removing of concrete structures | Habitat and biodiversity | |||||||||||
Farm Irrigation Trials | |||||||||||||
Farming For Water | 1 April 2015 | Land use management - agriculture Water quality | |||||||||||
Farming with water - Ullswater Catchment | |||||||||||||
Fazakerley Brook Wetland | |||||||||||||
Fender River Restoration Project - Bidston, Wirral | 1 April 2018 | Habitat and biodiversity | |||||||||||
Ferry Lane North drainage realignment | Improved public access | Habitat and biodiversity Social benefits | |||||||||||
Fingringhoe Managed Realignment | 2015 | Salt marsh and mudflat restoration | Flood risk management Habitat and biodiversity Land use management - agriculture Social benefits Water quality | ||||||||||
Firs Farm Wetlands | Deculverting Ponds and pools inside the wetland | Creation of wetland Creation of wet woodland Creation of pond Creation of side channel Deculverting Extensive planting Sustainable urban drainage ponds (SUDs) Floodplain creation | Community Education Community involvement Engagement with schools Public amenity and perception | Environmental flows and water resources Flood risk management Habitat and biodiversity Monitoring Social benefits Water quality Urban | |||||||||
Fish and Flow at Arcadia - Phase 2 | |||||||||||||
Fish migration aid KW Melk | Habitat and biodiversity Hydropower Monitoring | ||||||||||||
Fishery/habitat enhancement on the Grand Union Canal | 1 January 2010 | Creation of backwater | Fisheries Habitat and biodiversity | ||||||||||
Flood channel creation and reconnection between riverbed and its floodplain on Vezouze river | Riverbank revegetation Removal of bank reinforcements | Floodplain reconnection Creation of a flood expansion area | Channel widening | Surface drainage systems improved | Flood risk management | Quantity & dynamics of flow | hydrography, topography and geology of site | ||||||
Flood detention basin (HRB) Ickern-Mengede | 1 January 2005 | removal of bottom slab formwork Adding sinuosity | Increase water retention area Connection to wider floodplain Wetland habitat | Channel naturalisation Enabling dynamics Improvement of channel morphology Meandering channel | Community involvement | Habitat and biodiversity Hydromorphology | Fish Invertebrates Macrophytes | Channel pattern/planform Structure & condition of riparian/lake shore zones Width & depth variation | Nutrient concentrations Oxygen balance PH Salinity Temperature | ||||
Flood management and ecological restoration in the Dijle valley | Flood risk management Habitat and biodiversity Hydromorphology | ||||||||||||
Floodplain restoration in the River IJssel at Gelderland | Habitat and biodiversity | ||||||||||||
Floodplain restoration in the River Traisen | Environmental flows and water resources Hydromorphology | ||||||||||||
Force Crag Mine Remediation | Vertical flow pond which uses compost limestone and woodchips to remove metals from the water without the need for added energy or chemicals | Habitat and biodiversity Water quality | |||||||||||
Fordmill weir | Bank reprofiling Removing of concrete structures Weir removal | Fisheries Habitat and biodiversity | |||||||||||
Forest Halt, Saltburn Valley Gardens | 11 October 2017 | 4 September 2018 | Economic aspects Flood risk management Social benefits | ||||||||||
France Farm (Phase 1) A 9 | 1 September 2013 | 1 October 2013 | opening up of hatches to reconnect reaches of the river | Environmental flows and water resources Fisheries Habitat and biodiversity Hydromorphology | |||||||||
Free the Frome | Economic aspects Environmental flows and water resources Flood risk management Habitat and biodiversity Social benefits Spatial planning Water quality Urban | ||||||||||||
Freiston Managed Realignment Scheme | Managed realignment (Three 50m wide breaches were created in the outer sea wall) | Habitat and biodiversity | |||||||||||
Fresh Wharf | Reedbed creation | Economic aspects Habitat and biodiversity Social benefits | |||||||||||
Friary Park | 1 January 2008 | Recreation | Habitat and biodiversity Social benefits | ||||||||||
Friends of Afon Llwyd (FOAL) | 1 March 2010 | Removal of invasive plants Gravel traps Bank improvement Cut back of trees | Litter picking | Environmental flows and water resources Fisheries Habitat and biodiversity Monitoring | |||||||||
Friends of Bottesford Beck | 24 January 2017 | Riverbed restoration | Planting Creation of pond | Rain gardens Removal of rubbish | Creation of a path alongside the river Improved public access | Flood risk management Habitat and biodiversity Social benefits Water quality | |||||||
Friern Barnet Former Sewage Works | 1 January 2008 | Deculverting | Aesthetics Community Education Recreation | Habitat and biodiversity Social benefits | |||||||||
Frog Island | Removing of concrete structures | Fisheries Flood risk management Habitat and biodiversity Social benefits | |||||||||||
Garratt Park | 1 January 2008 | Bank reprofiling Removing structures | Habitat and biodiversity Social benefits | ||||||||||
Gastersche Diep | Habitat and biodiversity Hydromorphology Monitoring | ||||||||||||
Gategill Beck: Abandoned Metal Mines | 2010 | Deculverting Sealing the culvert | Dam lowering | Lowering of impoundment Pipe through dam for mine water to travel to future treatment scheme | Clean up pollution with Defra funding Passive treatment potential locations for a treatment system to be constructed research on how to capture mine water reviewed treatment technologies | Environmental flows and water resources Habitat and biodiversity Monitoring Water quality | |||||||
Gaywood restoration project | 1 April 2018 | Habitat and biodiversity | |||||||||||
Giving up the Weed | 1 October 2007 | Removal of invasive species | Community Education | Habitat and biodiversity Monitoring | |||||||||
Glaisdale Beck Restoration Project | 31 May 2016 | Cattle drinkers | Fencing Livestock fencing Buffer strips Tree planting Restoring riparian vegetation | Habitat and biodiversity Land use management - agriculture Monitoring Water quality | |||||||||
Glaisdale Beck diversion scheme | 21 September 2007 | 1 October 2014 | River channel diversion | Environmental flows and water resources Fisheries Habitat and biodiversity Hydromorphology Land use management - agriculture Monitoring Water quality | Channel pattern/planform Continuity of sediment transport | ||||||||
Glenbrook Wetlands | 1 September 2012 | Bed raising | Tree management Creation of swales and wetland basin | n/a | n/a | Opening of tree canopy to encourage varied ground flora | Community Education Community consultation Community involvement Improved public access Interpretation boards | Flood risk management Habitat and biodiversity Monitoring Social benefits Water quality Urban | |||||
Goldrill Beck River Restoration | 2018 | embankment removal | floodplain reconnection | ditch restoration drain blocking re-meandering | wet woodland restoration through channel blocking | NE & LDNPA as well as the tenant farmer; community engagement including with the local school; site visits hosted to share project success and lessons partnership working with organisations including the EA | Flood risk management Habitat and biodiversity Hydromorphology Monitoring Social benefits Water quality | ||||||
Goodmayes Park, Mayes Brook | Deculverting | Improved public access | Fisheries Habitat and biodiversity | ||||||||||
Goresbrook Park | 1 January 2008 | Bank reprofiling Deculverting | Creation of wetland | Environmental flows and water resources Fisheries Flood risk management Habitat and biodiversity Social benefits | |||||||||
Goresbrook and Ship and Shovel Sewer | 1 August 2008 | Flood risk management Habitat and biodiversity Social benefits | |||||||||||
Goshen Weir removal project, River Roch, Bury | Weir removal/modification for easement of fish passage | Fisheries Flood risk management Habitat and biodiversity Hydromorphology | |||||||||||
Gottar Water weir fish barrier easement | 1 March 2015 | Feasibility and Optioneering study nearing completion. Preferred option yet to be identified. | Fisheries Habitat and biodiversity | ||||||||||
Grantham Blue Green - Urban Reach | 7 January 2021 | Tree Hinging adding gravel berm creation daylighting. | Urban wetlands and wildflower meadows | Big engagement programme with local community. | Habitat and biodiversity | ||||||||
Great Ryburgh End Restoration Scheme | Diversification of in-channel features Soft erosion solutions Introducing large woody debris | Tree planting Creation of backwaters | Fisheries Habitat and biodiversity Hydromorphology | ||||||||||
Greater Thames Estuary Fish Migration Roadmap | Economic aspects Fisheries Flood risk management Habitat and biodiversity Monitoring Social benefits Spatial planning Urban | ||||||||||||
Greatham Managed Realignment Scheme | Flood risk management Habitat and biodiversity Water quality Estuary Fisheries Urban | ||||||||||||
Greatham Marsh Restoration | Estuary Fisheries Flood risk management Habitat and biodiversity | ||||||||||||
Greenwich Peninsula | 1 January 1997 | Bank improvement creation of intertidal terraces | Flood risk management Habitat and biodiversity Hydromorphology Social benefits Spatial planning Urban Estuary | Fish | |||||||||
Groote Beek | Habitat and biodiversity Hydromorphology | ||||||||||||
Grote Aa | Habitat and biodiversity Monitoring Water quality | ||||||||||||
Grovelands Park Wetlands | 1 February 2014 | 10 July 2015 | Deculverting | Creation of swales and wetland basin stream allowed to find new course | Meandering channel | Community Education Community consultation Community involvement Improved public access Interpretation boards | Environmental flows and water resources Flood risk management Habitat and biodiversity Hydromorphology Monitoring Social benefits Water quality Urban | ||||||
Guash Habitat Restoration Project (Phase 1 and 2) | 1 May 2012 | 1 March 2014 | Habitat enhancement | Channel narrowing Removal of channel blockages | Environmental flows and water resources Fisheries Habitat and biodiversity Hydromorphology Water quality | ||||||||
Guisborough Flood Alleviation Scheme | 2015 | Offline storage areas | Flood risk management Habitat and biodiversity Hydromorphology Land use management - agriculture Land use management - forestry | ||||||||||
Gunnerside Gill: Abandoned metal mines | 2012 | Catchment Characterisation Programme Options for remediation Spot flow gauging | Environmental flows and water resources Habitat and biodiversity Monitoring Water quality | ||||||||||
Gunville Phase I | 1 June 2012 | 13 December 2012 | Restoring gravel bed Introducing large woody debris | lowering river bank Wetland habitat | Enhancing flow diversity Habitat restoration Meandering channel | Flow management | Awareness raising | Environmental flows and water resources Fisheries Habitat and biodiversity Hydromorphology | |||||
Guphill Brook Riverine Enhancement | 1 October 2014 | Bank reprofiling | Creation of backwaters Lowland meadow Creation of pond | Creation of wooden deflectors | Fisheries Flood risk management Habitat and biodiversity Hydromorphology Social benefits Water quality Urban | ||||||||
HLS New Forest | Bed raising Removal/retreat of embankments | Re-instatement of old course Re-meandering | Habitat and biodiversity Monitoring | Fish: Species composition Invertebrates: Abundance | Channel pattern/planform | ||||||||
Habitat Enhancements, River Glaven at Wiveton, Norfolk | Habitat and biodiversity Hydromorphology Water quality | ||||||||||||
Habitat Enhancments, Reepham Stream, River Blackwater, Norfolk | Habitat and biodiversity Hydromorphology Water quality | ||||||||||||
Habitat Improvement: Stonebridge River Reserve, Og and Marlborough Fish Migration | 1 July 2012 | 1 March 2015 | Bank reprofiling Removal of fish barriers Creation of fish passes | Fisheries Hydromorphology | |||||||||
Habitat Improvements on the River Colne at West Drayton | 1 January 2008 | Installation of coir rolls Introduction of gravel | Creation of backwater | Fisheries Habitat and biodiversity | |||||||||
Habitat enhancement of the River Waveney through Bressingham | Fisheries Habitat and biodiversity Hydromorphology | ||||||||||||
Habitat improvements in the upper Kennet | 1 July 2012 | 1 March 2015 | Creation of meanders | Community Education Community involvement Engagement with schools Improved public access | Habitat and biodiversity Social benefits Water quality | ||||||||
Habitat restoration of the Kleine Net Valley | 1 January 2011 | 31 December 2015 | Habitat and biodiversity | ||||||||||
Hackbridge Restoration | 1 January 2009 | Bank reprofiling Deflectors Installation of coir rolls | Fisheries Habitat and biodiversity Social benefits | ||||||||||
Hackbridge weir notch | 1 January 2008 | Deflectors Installation of coir rolls Removal of sediment | Fisheries Habitat and biodiversity Social benefits Urban | ||||||||||
Hackney Marsh recreation grounds | Bank reprofiling | Habitat and biodiversity | |||||||||||
Hackney Marshes - Wick Field recreation ground | Creation of wetland | Flood risk management Habitat and biodiversity | |||||||||||
Hadfield Weir Fish Pass | 11 February 2013 | Eel pass Creation of fish passes | Economic aspects Fisheries Flood risk management Habitat and biodiversity | ||||||||||
Hainburg River Restoration | Flood risk management Habitat and biodiversity Hydromorphology | ||||||||||||
Hale Wharf | Aesthetics | Economic aspects Fisheries Habitat and biodiversity Social benefits | |||||||||||
Hall Place weir modification | Flow management | Fisheries | |||||||||||
Haltwhistle burn; a total catchment approach | 17 September 2012 | Barrier removal | Tree planting | Improve forest management and agricultural Management of organic and inorganic sediments | Awareness raising Engagement with schools | Flood risk management Habitat and biodiversity Hydromorphology Land use management - agriculture Land use management - forestry Monitoring Water quality | |||||||
Hampton Court Palace | 1 January 2009 | Bank reprofiling | Habitat creation Reedbed creation | Aesthetics | Flood risk management Habitat and biodiversity Monitoring Water quality Urban | ||||||||
Harbertonford Flood Alleviation Scheme | 1999 | Bed lowering Creation of pools and riffles Weir modification | Containment bund to prevent flooding Construction of flood wall | Channel widening | SUDS Surface drainage systems improved | Community Education Engagement with schools | Flood risk management Social benefits | ||||||
Harrow Lodge Park | 1 January 2008 | Deculverting Removing of concrete structures | Fisheries Habitat and biodiversity | ||||||||||
Haynes Park | Removing of concrete structures Weir removal | Social benefits | |||||||||||
Healthy Rivers | 1 April 2015 | Weir removal Weir modification | Barrier removal Habitat creation | Monitoring strategy Walkover surveys and water sample data collection | Community Education Community involvement | Environmental flows and water resources Fisheries Habitat and biodiversity Social benefits | |||||||
Hedleyhope Burn | 2012 | 1 September 2012 | creation of rock pools downstream of culvert | Fisheries | |||||||||
Heiligenbergerbeek | Habitat and biodiversity Water quality | ||||||||||||
Help for the Forgotten Farms Upper Lune (Plugging the gap) | Hydropower Water quality | ||||||||||||
Herefordshire Asset Restoration Project (HARP) | 1 August 2010 | 31 December 2011 | Developing angling infrastructure | Resolving angler/ canoeist conflict | Environmental flows and water resources Fisheries Habitat and biodiversity | ||||||||
Herinrichting Beekloop | 1 January 2010 | Dood hout Vispassages | Beschaduwing | Afspraken met belanghebbende waterverdeling | Environmental flows and water resources Fisheries Hydromorphology Land use management - agriculture | Fish Macrophytes | Flow velocities Width & depth variation | Nutrient concentrations Oxygen balance PH Salinity Specific synthetic pollutants Temperature Transparency | |||||
Herinrichting beekdal Tongelreep | 1 January 2007 | Dood hout Grind bedden | Bouwen met Natuur | Environmental flows and water resources Fisheries Habitat and biodiversity Hydromorphology | Fish Macrophytes | Flow velocities Width & depth variation | Nutrient concentrations Oxygen balance PH Salinity Specific synthetic pollutants Temperature | ||||||
Hesketh Out Marsh Managed Realignment | 2014 | Salt marsh and mudflat restoration | Economic aspects Flood risk management Habitat and biodiversity Hydromorphology Land use management - agriculture Social benefits Water quality | ||||||||||
Heybarnes Recreation Ground Cole Restoration | Flood risk management Habitat and biodiversity Hydromorphology Land use management - agriculture Water quality | ||||||||||||
Hierdense Beek | 2013 | Sand deposit dead wood deposit | Shading | Mowing management | Habitat and biodiversity Hydromorphology Land use management - agriculture Land use management - forestry Monitoring | Fish Macrophytes | Flow velocities Quantity & dynamics of flow Width & depth variation | Acid neutralising capacity Oxygen balance PH Temperature Transparency | |||||
Highland Water at Warwickslade Lawn | 1 June 2009 | 1 November 2009 | Planting Introduction of gravel | Re-meandering | Flood risk management Habitat and biodiversity | ||||||||
Hightown Sand Dune Restoration | Sand dune restoration | Flood risk management Habitat and biodiversity Monitoring Social benefits | |||||||||||
Hills to Levels | 1 January 2015 | Bank stabilisation habitat creation | Floodplain reconnection floodplain scrapes floodplain woodland planting | Opening long sections of culverts leaky woody dams | Run-off interception attenuation diversion | Soil managment and land use to improve infiltration and water quality | Working with Parish Councils and Flood Action Groups | Flood risk management Habitat and biodiversity Land use management - agriculture Land use management - forestry Monitoring Water quality | |||||
Historic Mill Restoration Project | Economic aspects Habitat and biodiversity Social benefits | ||||||||||||
Hoffer Brook | 1 February 2013 | 1 May 2014 | Bed lowering at impoundment and bed raising with gravel (and mesh) Bank reprofiling Sensitive desilt Livestock fencing Tree management Cattle drinkers | Habitat and biodiversity Hydromorphology | |||||||||
Hogsmill River Connectivity Project | 1 August 2012 | 31 October 2013 | Weir removal Deculverting Weir modification | Community involvement | Environmental flows and water resources Fisheries Flood risk management Social benefits | ||||||||
Hogsmill Sewage Treatment Works phase 1 | 1 January 2011 | Bank reprofiling | Creation of wetland | Creation of backwater | Economic aspects Flood risk management Habitat and biodiversity Social benefits | ||||||||
Hogsmill river enhancement | 1 April 2018 | Flood risk management Habitat and biodiversity | |||||||||||
Hollyoak Wood and Willersley Park | 1 January 2008 | Bank reprofiling | Aesthetics Improved public access | Habitat and biodiversity Hydromorphology Social benefits | |||||||||
Holmsley Inclosure Stream Restoration | 1 July 2002 | 31 December 2006 | Bed raising Tree management | Environmental flows and water resources Habitat and biodiversity Hydromorphology Monitoring | |||||||||
Holnicote multi-objective flood risk management demonstration project | 1 April 2009 | 31 March 2015 | Large woody derbis dams | Creation of a flood expansion area Interventions in direct/rapid flow pathways on hillsopes & connectivity to watercourses | Grip blocking Moorland restoration Woodland extension | Implementation of best practice land & soil management | Economic aspects Environmental flows and water resources Flood risk management Habitat and biodiversity Hydromorphology Land use management - agriculture Land use management - forestry Monitoring Social benefits Water quality | ||||||
Hoo Brook root plates | 4 January 2018 | Flood risk management Habitat and biodiversity | |||||||||||
Hooge Raam | Hydromorphology | ||||||||||||
Horne Way Weir | Weir removal | Habitat and biodiversity | |||||||||||
Hospital Bridge Road | 1 January 2011 | Creation of backwater | Fisheries Flood risk management Social benefits | ||||||||||
Houghton 'trout stream' enhancements | 1 May 2014 | Creation of wooden deflectors Cleaning of spawning gravels | Fencing Tree planting | Fisheries Hydromorphology | Fish | ||||||||
Houndsden Road Rain Gardens | 6 August 2012 | Creation of swales and wetland basin | Opening of tree canopy to encourage varied ground flora | Community consultation Community involvement Improved public access Interpretation boards | Flood risk management Habitat and biodiversity Social benefits Water quality Urban | ||||||||
Hoveton Wetlands Restoration Project | Habitat and biodiversity Hydromorphology Water quality | ||||||||||||
Hull and East Riding Catchment Partnership | Volunteer engagement | Economic aspects Environmental flows and water resources Fisheries Flood risk management Hydromorphology Land use management - agriculture Monitoring Social benefits Water quality Urban | |||||||||||
Humber Estuary Erosion Protection Programme | 2017 | Salt marsh and mudflat restoration | |||||||||||
Hunze bij Torenveen | Environmental flows and water resources Habitat and biodiversity Hydromorphology Monitoring Water quality | ||||||||||||
Hurst Bridge (downstream) | Fisheries Habitat and biodiversity Hydromorphology | ||||||||||||
Hurst Park | 1 January 2008 | Habitat creation Creation of wetland | Aesthetics | Environmental flows and water resources Flood risk management Habitat and biodiversity Social benefits | |||||||||
INTERREG MED WETNET - Membership card of the Verdier Marshes-Rhone Delta Wetland Contract | 1 November 2016 | 31 October 2019 | Maintain the South dike; Respect the natural hydrological functioning of the South basin (rain fed) to favor the installation of a vegetation characteristic of temporary low-salt marshes and vegetation of salt meadows | Add signage and interpretation on birds in the observatory | Ensure compliance with hunting regulations (ensure guarding) | Develop new artistic activities (drawing classes); Organize meetings with site users and children to discuss and promote local know-how; Maintain the monthly meetings of the association | Environmental flows and water resources Social benefits | ||||||
Improvement of the River Varde at the Wadden Sea estuary | Habitat and biodiversity | ||||||||||||
Improving conservation condition of the National Trust managed river test SSSI | Monitoring strategy | Fisheries Habitat and biodiversity | |||||||||||
Improving the Conservation Status of Freshwater Pearl Mussel Targeting the Clun SAC and Upstream Waters | Riparian habitat restoration Tree planting Cut back of trees | Livestock access | Livestock exclusion Sustainable livestock watering | Environmental flows and water resources Fisheries Habitat and biodiversity Hydromorphology Land use management - agriculture Land use management - forestry Monitoring Social benefits Water quality | |||||||||
Improving water quality in Loweswater | 1 July 2012 | Non/agricultural business changed its way of working | Community involvement | Economic aspects Habitat and biodiversity Social benefits Water quality | |||||||||
Inchewan Burn Bed restoration | 1 September 2007 | Removal of artificial wire/stone bed Replicated upstream boulder bed step/pool sequence | Removal of non-native species Large scale planting of native species | In-channel placement of boulders to provide flow diversity | Student Education | Fisheries Habitat and biodiversity Hydromorphology | Fish | ||||||
Inspiring Water Action in the Torne (iWAIT) | 2016 | establishment of woodland | Flood risk management Habitat and biodiversity Social benefits Water quality | ||||||||||
Investigating the Impacts of Upland Land Use Management on Flood Risk at Pontbren, Wales | 2005 | establishment of woodland | Economic aspects Flood risk management Habitat and biodiversity Hydromorphology Land use management - agriculture Monitoring | ||||||||||
Investigating the impact of floodplain woodland on flood flows in the River Cary catchment, Somerset | establishment of woodland | Flood risk management Habitat and biodiversity Land use management - forestry Monitoring Water quality | |||||||||||
Investigating the impact of upland conifer afforestation on catchment hydrology at Coalburn, northern England | establishment of woodland | Flood risk management Habitat and biodiversity Land use management - forestry Monitoring Water quality | |||||||||||
Investigating the interaction between semi-natural floodplain woodland and flood flows at Great Triley Wood | 2005 | establishment of woodland | Flood risk management Habitat and biodiversity Land use management - forestry Monitoring Water quality | ||||||||||
Ironbridge Farm | 1 April 2012 | Habitat restoration | Creation of backwaters Creation of wetland Creation of pond | Creation of backwater Habitat restoration | UK BAP habitat creation/restoration | Ensuring biodiversity Promoting riparian vegetation Woodland management | Habitat and biodiversity Water quality | ||||||
Isar-Plan | 1 January 1998 | Deepening of river floor Removal of bank reinforcements Creation of gravel banks Bank reprofiling | Large scale planting of native species Creation of a flood expansion area | Channel naturalisation Channel widening Creation of braided channel Creation of willow island | Creation of new bicycle path embedding of rootballs and tree trunks natural seating stones places on banks | Waste management provision of temporary toilet facilities | Information for the public | Fisheries Flood risk management Habitat and biodiversity Hydropower Hydromorphology Land use management - forestry Monitoring Social benefits Spatial planning Water quality Urban | Continuity of sediment transport Structure & condition of riparian zones | Public use | |||
Jufferbeek | Habitat and biodiversity Water quality | ||||||||||||
Kanaal van Deurne | Flood risk management | ||||||||||||
Keent | 1 January 2007 | 4 July 2014 | Connection between river channel and former side branches Riverbed dug out | Grazing | Creation of visitors centre Exposition about the past of Keent | Flood risk management Habitat and biodiversity Land use management - agriculture | |||||||
Kelham Island Weir Fish Easement | Creation of fish passes Improving fish migration | Fisheries Habitat and biodiversity Urban | |||||||||||
Kensworth Quarry Chalk Pit Restoration | Environmental flows and water resources Habitat and biodiversity | ||||||||||||
Kensworth Quarry Chalk Pit Site Restoration | |||||||||||||
Kensworth Quarry Chalk Pit Site Restoration 2 | |||||||||||||
Kentchurch Weir Removal | Weir removal Weir modification | Improving fish migration | Habitat and biodiversity | Bathymetric Survey Sediment Contamination Assessment | |||||||||
Kimpton Park | 1 January 2008 | Bank reprofiling | Creation of new channel Habitat creation | Aesthetics | Flood risk management Social benefits | ||||||||
King Georges Park | 1 January 2008 | Removing of sheet piling | Creation of meanders | Social benefits | |||||||||
King Georges Playing Field | 1 January 2008 | Tree management | Creation of backwater | Fisheries Habitat and biodiversity Social benefits | |||||||||
Kirkstall Valley Weir Fish Passes Project | 9 August 2012 | 25 June 2014 | Creation of fish passes | Community involvement | Environmental flows and water resources Fisheries Habitat and biodiversity Social benefits Urban | ||||||||
Kirkstone Beck River Restoration | 2019 | Embankment removal Diversification of in-channel features | Rejuvination of river delta widening of river channel | Widening to allow wandering sections | NE & LDNPA as well as the tenant farmer; site visits hosted to share project success and lessons partnership working with organisations including the EA | Flood risk management Habitat and biodiversity Hydromorphology Water quality | |||||||
Klassiek beekherstel Astense Aa | 2011 | Traditioneel beekherstel | Environmental flows and water resources Habitat and biodiversity Hydromorphology Water quality | ||||||||||
Kleblach-Side channel | 1 January 1992 | Planting | Removal of embankments | Creation of groynes Creation of side channel | Habitat and biodiversity Monitoring Hydromorphology Water quality | Fish: Abundance Fish: Species composition Invertebrates: Abundance Invertebrates: Diversity | Channel pattern/planform Flow velocities | ||||||
Kleine Aa, traject Smalwater Noord | 1 March 2008 | Habitat and biodiversity Spatial planning | Fish Macrophytes | ||||||||||
Kleine Beerze | Environmental flows and water resources Habitat and biodiversity Monitoring Water quality | ||||||||||||
Knepp Rewilding Project | 1 January 2006 | 31 December 2013 | Bank modification Re-profiling Creation of low flow channel Habitat restoration Barrier removal Creation of backwaters Introducing large woody debris Riverbed restoration | Floodplain reconnection Scrapes Increase water retention area Wetland habitat | Channel realignment Enhancing flow diversity Habitat restoration Meandering channel Re-meandering | Create more natural flow regime Improvement of natural flows Improving fish migration Selective removal of organic muds and sludge contaminated with toxic | Flow management | Environmental flows and water resources Flood risk management Habitat and biodiversity Hydromorphology Land use management - agriculture Social benefits Water quality | |||||
Knock Burn low flow channel | 2 December 2010 | 25 January 2011 | Creation of low flow channel | Re-meandering | Environmental flows and water resources Habitat and biodiversity Social benefits Urban | Fish Macrophytes | Channel pattern/planform | ||||||
Koningsdiep | Environmental flows and water resources Habitat and biodiversity Hydromorphology Monitoring Water quality | ||||||||||||
LARA (Lugg and River Arrow) | 15 August 2008 | 30 November 2010 | Creation of fish passes Bank improvement Cut back of trees Livestock fencing | Fisheries Habitat and biodiversity Water quality | |||||||||
LIFE IP IRIS Enns Mandling Restoration | Flood risk management Habitat and biodiversity Hydromorphology Monitoring Social benefits | ||||||||||||
LIFE+ Traisen | 1 January 2009 | Within the construction process the river was extended by 7.6 kilometres and the estuary of the Traisen River was relocated | Environmental flows and water resources Fisheries Habitat and biodiversity Monitoring | ||||||||||
LIFE03NAT/A/000009 Wachau | Habitat and biodiversity Monitoring | ||||||||||||
LIFE07 NAT/A/000010 Living space in the rivers of Mostviertel - Wachau | Habitat and biodiversity Hydromorphology Monitoring | ||||||||||||
Lactariabeek | Environmental flows and water resources Habitat and biodiversity Monitoring | ||||||||||||
Lady Island/Friars Meadow - Sudbury - River Stour | 1 April 2018 | Fisheries Habitat and biodiversity | |||||||||||
Lady's Bridge Fish Easement | Fisheries Habitat and biodiversity Urban | ||||||||||||
Ladywell Fields (QUERCUS) | 1 June 2006 | Planting Depth variation Removal of fencing | Creation of backwaters Creation of terraces New footpaths | Creation of meanders | cafe built and entrances to the park improved | Fisheries Flood risk management Habitat and biodiversity Hydromorphology Monitoring Social benefits Urban | Fish | Structure & condition of riparian zones Width & depth variation | Public Accessibility | ||||
Ladywell Fields Phase 2 | 1 January 2008 | Bank reprofiling Removing of concrete structures Weir removal | Creation of wetland | Creation of meanders Creation of pools and riffles | Flood risk management Habitat and biodiversity Social benefits | ||||||||
Ladywell Fields to Cornmill Gardens | 1 January 2008 | Bank reprofiling Removing of concrete structures | Creation of meanders Creation of pools and riffles Tree management | Improved public access | Fisheries Flood risk management Habitat and biodiversity Social benefits | ||||||||
Ladywell Fields toeboarding | 1 January 2009 | Bank reprofiling Toeboard removal | Habitat and biodiversity | ||||||||||
Lage Raam | Environmental flows and water resources Habitat and biodiversity Hydromorphology Monitoring | ||||||||||||
Lake District Foundation - Building future environmental investment | |||||||||||||
Land acquisition on the banks of the Ouche River | land acquisition | sensitization of the resident | Environmental flows and water resources Habitat and biodiversity Land use management - agriculture Spatial planning | Fish | |||||||||
Land at Buzzards Mouth Creek | 1 January 2008 | Bank reprofiling Deculverting | Creation of backwater | Flood risk management Habitat and biodiversity | |||||||||
Land opposite Wanstead Park | 1 January 2008 | Bund removal Creation of wetland | Fisheries Flood risk management Habitat and biodiversity Social benefits | ||||||||||
Langford Lakes project | 1 October 2002 | Planting Sediment trap building Morphological diversification Diversification of in-channel features Weir construction | Economic aspects Flood risk management Land use management - agriculture Social benefits Spatial planning | ||||||||||
Langonnet river | 1 January 2000 | Creation of pools and riffles Creation of groynes introduction of blocks Creation of berms | Develop riparian forest Tree plantation | Habitat and biodiversity Hydromorphology Monitoring Water quality | Fish: Species composition | Channel pattern/planform | Temperature | ||||||
Langor Beck (part of River Wensum SSSI) | 1 April 2018 | Habitat and biodiversity | |||||||||||
Laymer Road Silt Trap and Recreational Ground | Toeboard removal | Flood risk management Habitat and biodiversity Social benefits | |||||||||||
Lea Bridge Waterway Wall Improvements | 1 January 2010 | Sandmartin tubes installation | Habitat and biodiversity | ||||||||||
Lebendige Alster | 2011 | Habitat and biodiversity Hydromorphology Water quality Urban | |||||||||||
Lee Navigation by Walthamstow Marshes | Removing of sheet piling | Creation of wetland Reedbed creation Creation of pond | Habitat and biodiversity Social benefits | ||||||||||
Lek Bij Everdingen | Introduction of coil rolls to protect groynes | Habitat and biodiversity Monitoring Water quality | Fish: Abundance Invertebrates Macrophytes | ||||||||||
Letting the Dove Flow | 1 August 2014 | Allowing stone weirs and bank reinforcements to break down removing or breaching weirs and reinforcements | Installing large woody material | Encouraging tree growth and natural supply of large woody material | Engagement with a wide range of stakeholders - more planned. | Environmental flows and water resources Fisheries Habitat and biodiversity Hydromorphology | |||||||
Letting the Dove Flow 2 | 2015 | removing or breaching weirs and reinforcements Allowing stone weirs and bank reinforcements to break down Removal of bank reinforcements | Improvement of natural flows Improve longitudinal connectivity Introducing large woody debris r | Channel naturalisation Improvement of channel morphology Removal of impoundments | Monitoring strategy | Awareness raising Engagement with a wide range of stakeholders Improved leisure environment for angling and recreation | Fisheries Habitat and biodiversity Hydromorphology Social benefits | ||||||
Letting the Dove Flow 3 | Flood risk management Habitat and biodiversity | ||||||||||||
Levington Saltmarsh Restoration, Suffolk | 1997 | Salt marsh and mudflat restoration | Flood risk management Habitat and biodiversity Water quality | ||||||||||
Lewisham College weir | Removing of concrete structures | Habitat creation | Fisheries Habitat and biodiversity | ||||||||||
Lidl | 1 January 2008 | Installation of coir rolls Introduction of gravel | Habitat creation Reedbed creation Tree management | Community Education | Economic aspects Environmental flows and water resources Fisheries Flood risk management Habitat and biodiversity Social benefits | ||||||||
Limestone Ribble Restoration Project | 1 July 2012 | 1 March 2015 | Tree planting | Barrier removal The blocking of certain grips | Economic aspects Habitat and biodiversity Hydromorphology Social benefits Water quality | ||||||||
Linde | Habitat and biodiversity Hydromorphology Water quality | ||||||||||||
Linear Park | Bank reprofiling Removing of concrete structures Toeboard removal | Tree management | Creation of meanders | Fisheries Habitat and biodiversity Social benefits Urban | |||||||||
Lippeaue Klostermersch | 1 January 1996 | Bed raising Removal of rip-rap | Floodplain reconnection Tree planting Connection to wider floodplain | Former channel filled | More sensitive grazing | Economic aspects Flood risk management Monitoring | Fish: Abundance | Continuity of sediment transport Width & depth variation | |||||
Lippenbroek Regulated Tidal Exchange Scheme | Flood risk management Habitat and biodiversity | ||||||||||||
Litter Clear-Ups (Since 2004) | 2004 | Community Litter-picking work | Habitat and biodiversity Water quality | ||||||||||
Little Don Catchment Case Study | Environmental flows and water resources | ||||||||||||
Little Ponton | 2 January 2013 | brushwood mattress installation Hinged Trees Log Flow Deflectors and Vanes. | Improved stock fencing and ford refurbishment. | Fisheries Habitat and biodiversity | |||||||||
Little Waltham Meadows Back Channel creation | 1 October 2012 | 31 March 2015 | New sluice structures | Creation of backwaters Creation of wet woodland Protect/restore riparian zone | Volunteer engagement | Habitat and biodiversity Hydromorphology | |||||||
Livestreaming Leeds | 1 April 2018 | Habitat and biodiversity | |||||||||||
Living Vechte-Dinkel | Environmental flows and water resources Habitat and biodiversity Hydromorphology Water quality | ||||||||||||
Lodge Burn Flood Alleviation Scheme | 1 September 2008 | 1 July 2012 | Culvert replacement/repair silt-trapping weir installation habitat improvements Rock ramp construction Creation of fish passes | Construction of flood wall | Removal of pond to restore natural course and sediment transport. | Diversion of water main and supporting beam - obstruction to flow. | Flood risk management | ||||||
Lodge Burn cascade fish pass and culvert bed restoration (as part of the Lodge Burn FAS) | 1 May 2012 | 31 May 2012 | Creation of fish passes Bed reprofiling | Creation of pool cascade | Engagement with schools Media | Fisheries Flood risk management | |||||||
Logie Burn Restoration Project | Re-profiling construction of bunds Creation of revetments Bank stabilisation Bank protection | Creation of backwaters Creation of wetland Livestock fencing Fencing | Re-meandering | The meanders were cleared of sediment vegetation and organic debris | Flood risk management Habitat and biodiversity Hydromorphology Monitoring Water quality | Fish | Continuity of sediment transport Flow velocities Quantity & dynamics of flow Substrate conditions Width & depth variation | Nutrient concentrations | |||||
London Olympics Parklands | 1 January 2005 | 1 January 2012 | Marginal planting Habitat diversification | Reedbed creation Creation of wetland Creation of wet woodland | Awareness raising | Spatial planning | |||||||
Long Eau (Great Eau) | 1992 | 1 January 1996 | Displacement of flood defences Lowering of embankments | Creation of backwater | Flood risk management Habitat and biodiversity Land use management - agriculture | ||||||||
Long Preston Deeps Flood Plain Project | 1 January 2004 | Realignment of flood banks | River naturalisation Scrapes Reconnecting palaeo riverine features Floodplain reconnection | Environmental flows and water resources Fisheries Flood risk management Habitat and biodiversity Hydromorphology Land use management - agriculture Social benefits Water quality | |||||||||
Longbridge West | 2019 | Flood risk management Habitat and biodiversity Social benefits Spatial planning Water quality Urban | |||||||||||
Longford Community Nature Park Reedbed Restoration Project | Reedbed creation | Flood risk management Habitat and biodiversity Social benefits Water quality Urban | |||||||||||
Longstreet A 91a | 1 January 2013 | Gravel berms Riffle creation Bank reprofiling | Introducing large woody debris Lowering of impoundment Tree management | Fisheries Habitat and biodiversity | |||||||||
Looe Bathing Waters Project | Habitat and biodiversity Land use management - agriculture Water quality Urban | ||||||||||||
Louds Mill (Downstream)m Enhancement | 1 January 2013 | Bank reprofiling Re-profiling Cleaning of spawning gravels Introducing large woody debris Tree planting Marginal planting | Environmental flows and water resources Fisheries Habitat and biodiversity Hydromorphology | ||||||||||
Loutre BeLu: Restoration of European otter habitats (Belgium & Luxemburg) | 1 October 2005 | 1 March 2011 | Habitat and biodiversity Monitoring | ||||||||||
Love My River | Habitat enhancement Vegetation removal | Clean-up days Walkover surveys and water sample data collection | Community involvement Engagement with a wide range of stakeholders | Economic aspects Environmental flows and water resources Habitat and biodiversity Monitoring Water quality | |||||||||
Love My River Douglas | |||||||||||||
Love Your River Bromsgrove | Habitat and biodiversity Monitoring Social benefits Water quality Urban | ||||||||||||
Love Your River Telford | Flood risk management Habitat and biodiversity Monitoring Social benefits Water quality Urban | ||||||||||||
Low Gardens Bridge Weir Removal | Flood risk management Habitat and biodiversity Hydromorphology Water quality | ||||||||||||
Low Stanger Floodplain Reconnection Project | Lowering of embankments | Flood risk management Habitat and biodiversity Hydromorphology | |||||||||||
Lowdham NFM | 1 February 2018 | 1 March 2021 | Containment bund to prevent flooding Tree planting Floodplain reconnection Deculverting | leaky woody dams | Flood risk management Habitat and biodiversity Land use management - agriculture Monitoring Water quality | ||||||||
Lowdham NFM Project | 1 April 2018 | Habitat and biodiversity | |||||||||||
Lower Bockhampton | Fisheries Habitat and biodiversity Hydromorphology | ||||||||||||
Lower Darwen Weir Removal | Weir removal | Fisheries Hydromorphology | |||||||||||
Lower Otter Restoration Project | 4 January 2021 | Estuary Flood risk management Habitat and biodiversity | |||||||||||
Lower River Roding Regeneration Project | 1 May 2004 | 31 March 2006 | construction of new intertidal area | Improved public access Information panels for people | Flood risk management Habitat and biodiversity Social benefits Urban Estuary | ||||||||
Lower Thame Barbel Project | 1 April 2018 | Fisheries Habitat and biodiversity | |||||||||||
Lower Woodsford | Introducing large woody debris Removal of bank reinforcements | Tree planting Riparian planting Removal of embankments Scrapes | Re-profiled ditch | Habitat and biodiversity Hydromorphology | |||||||||
Lowering the weir of the Houël mill on the Leff River | 1 September 2010 | 30 September 2010 | Weir lowering Spreading of debris | Trimming of trees | Awareness raising by a sign Organisation of visits to the sites Production of a video | Habitat and biodiversity Social benefits | |||||||
Loxford Water | 1 January 2008 | Deculverting Removing of concrete structures | Fisheries Flood risk management Habitat and biodiversity | ||||||||||
Lugg & Arrow, Radnorshire | 1 June 2006 | 1 June 2008 | Removal of fish barriers Fencing | Supporting local fisheries through marketing initiatives | Economic aspects Fisheries Habitat and biodiversity | ||||||||
Lugton Water Fish Barrier Easement | 2 January 2015 | Weir modification | Fisheries Habitat and biodiversity | ||||||||||
Lullingstone Castle | 2009 | 31 December 2011 | Placement of faggots Deflectors Marginal planting | Channel narrowing Decrease sedimentation | Cut back of trees Tree management | Fisheries Habitat and biodiversity Hydromorphology | |||||||
Lullingstone Castle phase 2 | 1 January 2011 | Habitat creation | Fisheries Habitat and biodiversity | ||||||||||
Lunterse Beek | 2011 | Dead wood deposit Sand deposit | Environmental flows and water resources Habitat and biodiversity Hydromorphology Land use management - agriculture Monitoring Water quality | Fish Macrophytes | Channel pattern/planform Flow velocities Width & depth variation | Oxygen balance PH Salinity Temperature Transparency | |||||||
Lustrum Beck Flood Alleviation Scheme: Phase 2 | 2014 | Offline storage areas | Flood risk management Habitat and biodiversity Hydromorphology Land use management - agriculture Land use management - forestry | ||||||||||
Mackworth and Markeaton Brooks | 1 April 2018 | Habitat and biodiversity | |||||||||||
Mains of Dyce | 1 August 2009 | 1 September 2010 | step pool | Hydromorphology | |||||||||
Malden Golf Course | Toeboard removal | Flood risk management Habitat and biodiversity | |||||||||||
Malltraeth Marsh | 1993 | 1 January 1996 | excavation of historic channels Bed raising | Creation of wetland Floodplain reconnection | Habitat and biodiversity | ||||||||
Maltby WASH | 4 January 2018 | Habitat and biodiversity | |||||||||||
Manor House Gardens | 1 January 2008 | Removing of concrete structures | Economic aspects Fisheries Habitat and biodiversity Social benefits | ||||||||||
... further results |