Case study:Greatham Marsh Restoration: Difference between revisions
(Created page with "{{Case study status |Approval status=Draft }} {{Location |Location=54.63305, -1.23743 }} {{Project overview |Project title=Greatham Marsh Restoration |Status=Complete |Themes=Estuary, Fisheries, Flood risk management, Habitat and biodiversity |Country=England |Main contact forename=Matthew |Main contact surname=Rountree |Contact organisation=Environment Agency |Multi-site=No }} {{Image gallery}} {{Image gallery end}} {{Toggle button}} {{Toggle content start}} {{Case stud...") |
No edit summary |
||
Line 1: | Line 1: | ||
{{Project overview | {{Project overview | ||
|Status=Complete | |Status=Complete | ||
|Themes=Estuary, Fisheries, Flood risk management, Habitat and biodiversity | |Themes=Estuary, Fisheries, Flood risk management, Habitat and biodiversity | ||
Line 13: | Line 6: | ||
|Main contact surname=Rountree | |Main contact surname=Rountree | ||
|Contact organisation=Environment Agency | |Contact organisation=Environment Agency | ||
|Partner organisations=The Hospital of God, Northumbrian Water | |||
|Multi-site=No | |Multi-site=No | ||
|Project summary=The Tees Estuary is one of the most heavily modified and developed estuaries in the UK, with less than 10% of the original intertidal habitats remaining. From 1740, large areas of saltmarsh have been enclosed to form freshwater grazing marsh. However, the industrialisation and systematic land take between 1830 and 1970s has resulted in significant habitat loss. It is estimated that the Tees Estuary has lost over two thirds of its intertidal habitat through waste disposal and infilling over the many years of modification, some 3,000ha, or 30km2. | |||
The Greatham Marsh Restoration project is centred on the restoration of intertidal habitat on the low-lying agricultural land near Greatham Village. Historically, the village was on the edge of the marshes but is now inland from the remaining intertidal areas. | |||
The land is currently protected by flood banks constructed in the 18th century and a tidal structure with tidal flaps constructed in 1980 by the former water authority. The alignment of Greatham Beck was rationalised in approximately 1981 when the original meandering tributary was infilled. | |||
The tidal structure was constructed under a licence that expires on 30 November 2029. A condition of the licence stipulates that on the expiry of the Licence, the structure is removed and riverbanks and foreshore reinstated. | |||
This alone would not restore the full extent of natural processes and habitats. The oversized Greatham Beck would become a deep tidal creek and the floodplain would be inundated for long periods of time as a result of historic embankments and ineffective drainage. | |||
So the Project intends to restore the former meandering channel of Greatham Beck and the network of tidal creeks within the floodplain. Areas of higher land within the field parcel are proposed to be managed as grasslands for conservation purposes. Habitats would be allowed to migrate inland as sea level rises. | |||
The project contributes to achievement of WFD objectives by implementing targets for WFD protected sites found within the conservation objectives of the SPA, and mitigation measures for the Tees Estuary water body. | |||
|Project title=Greatham Marsh Restoration | |||
}} | |||
{{Case study status | |||
|Approval status=Draft | |||
}} | |||
{{Location | |||
|Location=54.63305, -1.23743 | |||
}} | }} | ||
{{Image gallery}} | {{Image gallery}} | ||
{{Image gallery end}} | {{Image gallery end}} |
Revision as of 21:33, 9 December 2024
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Estuary, Fisheries, Flood risk management, Habitat and biodiversity |
Country | England |
Main contact forename | Matthew |
Main contact surname | Rountree |
Main contact user ID | |
Contact organisation | Environment Agency |
Contact organisation web site | |
Partner organisations | The Hospital of God, Northumbrian Water |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The Tees Estuary is one of the most heavily modified and developed estuaries in the UK, with less than 10% of the original intertidal habitats remaining. From 1740, large areas of saltmarsh have been enclosed to form freshwater grazing marsh. However, the industrialisation and systematic land take between 1830 and 1970s has resulted in significant habitat loss. It is estimated that the Tees Estuary has lost over two thirds of its intertidal habitat through waste disposal and infilling over the many years of modification, some 3,000ha, or 30km2.
The Greatham Marsh Restoration project is centred on the restoration of intertidal habitat on the low-lying agricultural land near Greatham Village. Historically, the village was on the edge of the marshes but is now inland from the remaining intertidal areas.
The land is currently protected by flood banks constructed in the 18th century and a tidal structure with tidal flaps constructed in 1980 by the former water authority. The alignment of Greatham Beck was rationalised in approximately 1981 when the original meandering tributary was infilled.
The tidal structure was constructed under a licence that expires on 30 November 2029. A condition of the licence stipulates that on the expiry of the Licence, the structure is removed and riverbanks and foreshore reinstated.
This alone would not restore the full extent of natural processes and habitats. The oversized Greatham Beck would become a deep tidal creek and the floodplain would be inundated for long periods of time as a result of historic embankments and ineffective drainage.
So the Project intends to restore the former meandering channel of Greatham Beck and the network of tidal creeks within the floodplain. Areas of higher land within the field parcel are proposed to be managed as grasslands for conservation purposes. Habitats would be allowed to migrate inland as sea level rises.
The project contributes to achievement of WFD objectives by implementing targets for WFD protected sites found within the conservation objectives of the SPA, and mitigation measures for the Tees Estuary water body.
Monitoring surveys and results
Lessons learnt
This case study is pending approval by a RiverWiki administrator.
Image gallery
Catchment and subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|