Case study:Washwalk Wetland: Difference between revisions
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
{{Site | |||
|Heavily modified water body=No | |||
|Protected species present=Yes | |||
|Invasive species present=Yes | |||
}} | |||
{{Case study status | {{Case study status | ||
|Approval status=Draft | |Approval status=Draft | ||
Line 94: | Line 99: | ||
{{Toggle content start}} | {{Toggle content start}} | ||
{{Case study subcatchment}} | {{Case study subcatchment}} | ||
{{Project background}} | {{Project background}} | ||
{{Motivations | {{Motivations |
Revision as of 15:41, 21 October 2024
Site
Name | |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | No |
National/international site designation | |
Local/regional site designations | |
Protected species present | Yes |
Invasive species present | Yes |
Species of interest | |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | In progress |
---|---|
Project web site | |
Themes | Habitat and biodiversity, Land use management - agriculture, Land use management - forestry, Social benefits, Water quality |
Country | England |
Main contact forename | Patrick |
Main contact surname | Hadow |
Main contact user ID | User:Stabilize7399 |
Contact organisation | |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Beginning in 2022, the Washwalk Wetland project focuses on rewetting a 906m stretch of floodplain along the River Gara. The aim is to enhance the local environment by slowing water flow and reconnecting the channelised river to its floodplain through the felling of trees across and into the channel.
Monitoring surveys and results
Monitoring has been primarily based on personal observations. Family and friends involved in the project have reported positive changes, such as increased water variability and enhanced vegetation growth along the banks. The presence of indicator bird species is used to track the project's success, with hopes of attracting more wader species. So far, kingfishers, mallards, herons, and little egrets have been observed.
Lessons learnt
This is an ongoing project still in its early stages. One key lesson learned is the importance of patience and continual observation. While initial signs of success, such as increased vegetation and bird sightings, are encouraging, long-term outcomes will require sustained monitoring and adaptive management. Engaging family and friends has also proven valuable, offering diverse perspectives and shared commitment to the project’s goals.
Image gallery
Catchment and subcatchment
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|