Case study:Rainham Creek and Thames Confluence: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
(7 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{Project overview | |||
|Status=Complete | |||
|Themes=Estuary, Flood risk management, Habitat and biodiversity, Social benefits | |||
|Country=England | |||
|Main contact forename=Jennifer | |||
|Main contact surname=Norman | |||
|Partner organisations=Fairview Ind Est (c/o Racefold Management), LDA, LTGDC, London Borough of Havering, London Riverside BID | |||
|Multi-site=No | |||
|Project summary=New bridge and road linking the Fairview Industrial Estate with the Ferry Lane industrial area. Associated improvements to the river banks.<br>Reasons for enhancement: Access and biodiversity | |||
}} | |||
{{Case_study_status | {{Case_study_status | ||
|Approval status= | |Approval status= | ||
Line 12: | Line 22: | ||
|Location=51.5077095031738, 0.174445778131485 | |Location=51.5077095031738, 0.174445778131485 | ||
}} | }} | ||
{{Image_gallery}} | {{Image_gallery}} | ||
{{Image_gallery_end}} | {{Image_gallery_end}} | ||
{{Toggle_button}} | {{Toggle_button}} | ||
{{Toggle_content_start}} | {{Toggle_content_start}} | ||
{{ | {{Case study subcatchment | ||
|Subcatchment= | |Subcatchment=Ingrebourne | ||
}} | }} | ||
{{Site | {{Site | ||
|WFD water body code=GB106037028130 | |||
|WFD water body name=Ingrebourne | |||
|Heavily modified water body=No | |||
|Protected species present=No | |||
|WFD water body code= | |Invasive species present=No | ||
|WFD water body name= | |||
|Heavily modified water body= | |||
|Protected species present= | |||
|Invasive species present= | |||
}} | }} | ||
{{Project_background | {{Project_background | ||
Line 158: | Line 110: | ||
}} | }} | ||
{{Motivations | {{Motivations | ||
|Specific mitigation=Urbanisation | |||
|Other motivation=Recreation | |||
|Specific mitigation= | |||
|Other motivation= | |||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Bank reprofiling | ||
|Social measures=Improved public access | |||
|Social measures= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} |
Latest revision as of 13:38, 16 September 2024
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Estuary, Flood risk management, Habitat and biodiversity, Social benefits |
Country | England |
Main contact forename | Jennifer |
Main contact surname | Norman |
Main contact user ID | |
Contact organisation | |
Contact organisation web site | |
Partner organisations | Fairview Ind Est (c/o Racefold Management), LDA, LTGDC, London Borough of Havering, London Riverside BID |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
Edit project overview to modify the project summary.
New bridge and road linking the Fairview Industrial Estate with the Ferry Lane industrial area. Associated improvements to the river banks.
Reasons for enhancement: Access and biodiversity
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
This case study is pending approval by a RiverWiki administrator.
Location: 51° 30' 27.75" N, 0° 10' 28.00" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Dovers Corner, Frog Island, Rainham Creek Tidal Sluice Removal
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|