Case study:Stainby Road, Colsterworth: Difference between revisions
Dhutchinson (talk | contribs) (Created page with "{{Case study status |Approval status=Draft }} {{Location |Location=52.80026977522567, -0.6256366590738383 }} {{Project overview |Project title=Stainby Road, Colsterworth |Stat...") |
Dhutchinson (talk | contribs) No edit summary |
||
(12 intermediate revisions by the same user not shown) | |||
Line 6: | Line 6: | ||
}} | }} | ||
{{Project overview | {{Project overview | ||
|Status=Complete | |Status=Complete | ||
|Themes=Habitat and biodiversity | |Themes=Habitat and biodiversity | ||
|Country=England | |Country=England | ||
|Main contact forename= | |Main contact forename=Gail | ||
|Main contact surname= | |Main contact surname=Talton | ||
|Main contact id=N/A | |Main contact id=N/A | ||
|Contact organisation=Environment Agency | |Contact organisation=Environment Agency | ||
|Contact organisation url=Environment Agency | |Contact organisation url=eastmercia.org/ | ||
|Partner organisations=Environment Agency, | |||
|Name of parent multi-site project=Case_study:Upper Witham Restoration | |||
|Multi-site=No | |Multi-site=No | ||
| | |Project picture=Colsterworth October 2023.JPG | ||
|Picture description=October 2023 just after construction | |||
|Project summary=This project was delivered by East Mercia Rivers Trust on land owned by Buckminster Estates. Although the Upper Witham which flows through the site had retained a meandering course, the river had become very disconnected from its floodplain with very little gravel in the channel. The aim of the project was to improve the river’s connectivity with the floodplain and in the process, enhance both river and floodplain habitat across the site. This was achieved by the lowering of areas of floodplain across the site and the introduction of limestone gravel riffles and point bars. The selective addition of woody material at certain locations further improved habitat. | |||
A backwater was created along with floodplain ponds and the enhancement of spring tributaries from the valley sides allowed the creation of ground water fed scrapes. All material removed from the valley bottom was landscaped on the valley sides outside of the floodplain and planted with wildflower seed. | |||
|Monitoring surveys and results=Project is very recent so just establishing. We have baseline data for fish and river habitat survey as well as detailed drone topo. Post monitoring work will commence from 24 on wards. | |||
River condition assessment pre and post delivery has taken place. | |||
|Lessons learn=Allow plenty of time for the development and delivery of a large project such as this where the ecological window for delivery is very limited. Involve all stakeholders at the earliest possible stage of development. Due to the sensitivity of the site, archaeology was a major factor and where this is the case adequate funding should be accounted for to the help manage this risk. Future management of the site is very important to ensure that high quality floodplain habitats are created. Here, the tenant farmer will continue with low density, conservation cattle grazing. The project was carefully designed to not back up any water onto the field immediately upstream. | |||
|Project title=Stainby Road, Colsterworth | |||
}} | }} | ||
{{Image gallery}} | {{Image gallery}} | ||
{{Case study image | |||
|File name=Col 1.jpg | |||
|Caption=Newly installed Lincs Limestone Gravel Feature | |||
}} | |||
{{Case study image | |||
|File name=Col 2.jpg | |||
|Caption=Post construction October 2023 | |||
}} | |||
{{Case study image | |||
|File name=Col 3.jpg | |||
|Caption=New channel form post construction | |||
}} | |||
{{Case study image | |||
|File name=Col 4.jpg | |||
|Caption=New Ground Water Fed Wetland. | |||
}} | |||
{{Case study image | |||
|File name=Pic1.jpg | |||
|Caption=Pre project habitat photo. | |||
}} | |||
{{Image gallery end}} | {{Image gallery end}} | ||
{{Toggle button}} | {{Toggle button}} | ||
{{Toggle content start}} | {{Toggle content start}} | ||
{{Case study subcatchment}} | {{Case study subcatchment | ||
{{Site}} | |Subcatchment=Upper Witham | ||
{{Project background}} | }} | ||
{{Motivations}} | {{Site | ||
{{Measures}} | |Name=Stainby Lane Colsterworth | ||
|WFD water body code=GB105030051570 | |||
|WFD water body name=Witham - Headwaters to confluence of Cringle Brook | |||
|Pre-project morphology=Meandering planform but with very poor connectivity and no gravel. | |||
|Reference morphology=Lower Cringle Brook - Very well connected floodplain. Wood and gravel abundant. | |||
|Desired post project morphology=Floodplain connectivity improved, gravel and wood added. | |||
|Heavily modified water body=No | |||
|Protected species present=Yes | |||
|Invasive species present=No | |||
|Species=Native Crayfish / Brown Trout | |||
|Dominant hydrology=Ground Water Fed but quite responsive due to modifications. | |||
|Dominant substrate=Pre project - Clay and fine silts. | |||
|River corridor land use=Grazed - Cattle. | |||
}} | |||
{{Project background | |||
|Reach length directly affected=1300 | |||
|Total cost category=100 - 500 k€ | |||
|Total1 cost=318 | |||
|Funding sources=EA, Anglian Water | |||
|Investigation and design cost category=1 - 10 k€ | |||
|Invst and design cost=30 | |||
|Investigation and design Lead organisation=East Mercia Rivers Trust | |||
|Investigation and design Other contact forename=Gail | |||
|Investigation and design Other contact surname=Talton | |||
|Works1 and supervision cost category=100 - 500 k€ | |||
|Works and supervision Lead organisation=East Mercia Rivers Trust | |||
|Works and supervision Other contact forename=Gail | |||
|Works and supervision Other contact surname=Talton | |||
|Monitoring Lead organisation=East Mercia Rivers Trust | |||
|Monitoring Other contact forename=Gail | |||
|Monitoring Other contact surname=Talton | |||
}} | |||
{{Motivations | |||
|Specific mitigation=Land drainage, | |||
|Biological quality elements=Fish | |||
|Physico-chemical quality elements=Phosphate | |||
}} | |||
{{Measures | |||
|Bank and bed modifications measure=Bank Lowering, gravel and wood added | |||
|Floodplain / River corridor=Ground water fed wetlands | |||
|Planform / Channel pattern=In-set floodplains created, bend widening, bank reprofiling. | |||
|Management interventions=Conservation grazing | |||
}} | |||
{{Hydromorphological quality elements header}} | {{Hydromorphological quality elements header}} | ||
{{End table}} | {{End table}} | ||
Line 38: | Line 110: | ||
{{Monitoring documents end}} | {{Monitoring documents end}} | ||
{{Additional Documents}} | {{Additional Documents}} | ||
{{Case study documents | |||
|File name=Stainby Road Colsterworth - Restoration Project - Case Study.pdf | |||
|Description=Project case study. | |||
}} | |||
{{Additional Documents end}} | {{Additional Documents end}} | ||
{{Additional links and references header}} | {{Additional links and references header}} |
Latest revision as of 11:58, 27 February 2024
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Habitat and biodiversity |
Country | England |
Main contact forename | Gail |
Main contact surname | Talton |
Main contact user ID | User:N/A |
Contact organisation | Environment Agency |
Contact organisation web site | http://eastmercia.org/ |
Partner organisations | Environment Agency |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
This project was delivered by East Mercia Rivers Trust on land owned by Buckminster Estates. Although the Upper Witham which flows through the site had retained a meandering course, the river had become very disconnected from its floodplain with very little gravel in the channel. The aim of the project was to improve the river’s connectivity with the floodplain and in the process, enhance both river and floodplain habitat across the site. This was achieved by the lowering of areas of floodplain across the site and the introduction of limestone gravel riffles and point bars. The selective addition of woody material at certain locations further improved habitat.
A backwater was created along with floodplain ponds and the enhancement of spring tributaries from the valley sides allowed the creation of ground water fed scrapes. All material removed from the valley bottom was landscaped on the valley sides outside of the floodplain and planted with wildflower seed.
Monitoring surveys and results
Project is very recent so just establishing. We have baseline data for fish and river habitat survey as well as detailed drone topo. Post monitoring work will commence from 24 on wards.
River condition assessment pre and post delivery has taken place.
Lessons learnt
Allow plenty of time for the development and delivery of a large project such as this where the ecological window for delivery is very limited. Involve all stakeholders at the earliest possible stage of development. Due to the sensitivity of the site, archaeology was a major factor and where this is the case adequate funding should be accounted for to the help manage this risk. Future management of the site is very important to ensure that high quality floodplain habitats are created. Here, the tenant farmer will continue with low density, conservation cattle grazing. The project was carefully designed to not back up any water onto the field immediately upstream.
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Aubourn Rock Ramp and Habitat Works, Belton Floodplain Reconnection and River Restoration, Dysart Park, Grantham Habitat Improvement, Grantham Blue Green - Urban Reach, Little Ponton, Manthorpe Floodplain Reconnection, Papermill Weir Section in-channel restoration, River Witham Great Ponton, Syston and Barkston Restoration, Upper Cringle Floodplain Restoration Project... further results
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|