Case study:Pow Beck Water Quality Improvement Programme: Difference between revisions

From RESTORE
Jump to navigation Jump to search
(XML import)
 
No edit summary
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
{{Case_study_status
{{Case study status
|Approval status=
|Approval status=Draft
   
 
 
   
      Draft
}}
}}
{{Location
{{Location
|Location=
|Location=54.496016,-3.5858192
   
   
      54.496016,-3.5858192
}}
}}
{{Project_overview
{{Project overview
|Status=
|Status=Complete
   
|Country=England
   
|Main contact forename=Environment
      Complete
|Main contact surname=Agency
|Project web site url=
|Contact organisation=Environment Agency
     
|Multi-site=No
|Themes=
|Project picture=Pow Beck 2.jpg
     
|Country=
      England
|Main contact forename=
      Environment
|Main contact surname=
      Agency
|Main contact id=
     
|Contact organisation=
      Environment Agency
|Contact organisation url=
     
|Partner organisations=
     
|Multi-site=
     
|Name of parent multi-site project=
     
|Project picture=
     
|Picture description=
     
|Project summary=
     
}}
}}
{{Image_gallery}}
{{Image gallery}}
{{Image_gallery_end}}
{{Case study image
{{Toggle_button}}
|File name=Pow Beck 2.jpg
{{Toggle_content_start}}
{{Case_study_subcatchment
|Subcatchment=
   
   
   
   
   
   
      River Eden
}}
}}
{{Site
{{Case study image
|Name=
|File name=Pow Beck 1.jpg
   
   
     
|WFD water body code=
     
|WFD (national) typology=
     
|WFD water body name=
     
|Pre-project morphology=
     
|Reference morphology=
     
|Heavily modified water body=
     
|Local site designation=
     
|Site designation=
     
|Protected species present=
     
|Invasive species present=
     
|Species=
     
|Dominant hydrology=
     
|Dominant substrate=
     
|River corridor land use=
     
|Average bankfull channel width category=
     
|Avrg bankfull channel width=
     
|Average bankfull channel depth category=
     
|Avrg1 bankfull channel depth=
     
|Mean discharge category=
     
|Mn discharge=
     
|Average channel gradient category=
     
|Avrg channel gradient=
     
}}
}}
{{Project_background
{{Image gallery end}}
|Reach length directly affected=
{{Toggle button}}
   
{{Toggle content start}}
   
{{Case study subcatchment
     
|Subcatchment=River Eden
|Project started=
     
|Works started=
     
|Works completed=
     
|Project completed=
     
|Total cost category=
     
|Total1 cost=
     
|Funding sources=
     
|Investigation and design cost category=
     
|Invst and design cost=
     
|Investigation and design Lead organisation=
     
|Investigation and design Other contact forename=
     
|Investigation and design Other contact surname=
     
|Stakeholder1 engagement cost category=
     
|stk engagement cost=
     
|Stakeholder engagement Lead organisation=
     
|Stakeholder engagement Other contact forename=
     
|Stakeholder engagement Other contact surname=
     
|Works1 and supervision cost category=
     
|Wrk and supervision cost=
     
|Works and supervision Lead organisation=
     
|Works and supervision Other contact forename=
     
|Works and supervision Other contact surname=
     
|Post-project1 management and maintenance cost category=
     
|Post-project2 management and maintenance cost=
     
|Post-project management and maintenance Lead organisation=
     
|Post-project management and maintenance Other contact forename=
     
|Post-project management and maintenance Other contact surname=
     
|Monitoring1 cost category=
     
|Monitoring2 cost=
     
|Monitoring Lead organisation=
     
|Monitoring Other contact forename=
     
|Monitoring Other contact surname=
     
|Supplementary funding information=
     
}}
}}
{{Motivations
{{Site}}
|Hydromorphological quality elements=
{{Project background}}
   
{{Motivations}}
   
{{Measures}}
     
{{Hydromorphological quality elements header}}
|Biological quality elements=
{{End table}}
     
{{Biological quality elements header}}
|Physico-chemical quality elements=
{{End table}}
     
{{Physico-chemical quality elements header}}
|Specific mitigation=
{{End table}}
     
{{Other responses header}}
|Other motivation=
{{End table}}
     
{{Monitoring documents}}
}}
{{Monitoring documents end}}
{{Measures
{{Additional Documents}}
|Bank and bed modifications measure=
{{Additional Documents end}}
   
{{Additional links and references header}}
   
{{Additional links and references footer}}
     
{{Supplementary Information}}
|Floodplain / River corridor=
{{Toggle content end}}
     
|Planform / Channel pattern=
     
|Other technical measure=
     
|Management interventions=
     
|Social measures=
     
|Wider stakeholder / citizen engagement=
     
}}
{{Hydromorphological_quality_elements_header}}
{{End_table}}
{{Biological_quality_elements_header}}
{{End_table}}
{{Physico-chemical_quality_elements_header}}
{{End_table}}
{{Other_responses_header}}
{{End_table}}
{{Monitoring_documents}}
{{Monitoring_documents_end}}
{{Additional_Documents}}
{{Additional_Documents_end}}
{{Additional_links_and_references_header}}
{{Additional_links_and_references_footer}}
{{Supplementary_Information
|Information=
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
     
}}
{{Toggle_content_end}}
{{Case_study_upload}}
{{Case_study_upload}}

Latest revision as of 15:52, 1 September 2022

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 54° 29' 45.66" N, 3° 35' 8.95" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes
Country England
Main contact forename Environment
Main contact surname Agency
Main contact user ID
Contact organisation Environment Agency
Contact organisation web site
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Project picture

Project summary

This case study hasn’t got any project summary, you can add some by editing the project overview.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


Pow Beck 2.jpg
Pow Beck 1.jpg
ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Eden and Esk
River basin

Subcatchment

River name River Eden
Area category
Area (km2)
Maximum altitude category
Maximum altitude (m)
Dominant geology
Ecoregion
Dominant land cover
Waterbody ID



Other case studies in this subcatchment: Eden crayfish eDNA project, Farming with water - Ullswater Catchment, Scales Farm, The Lowther catchment water vole project


Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information