Case study:West Amesbury: Difference between revisions
No edit summary |
No edit summary |
||
(11 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
{{Case study status | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
Line 44: | Line 44: | ||
{{Toggle button}} | {{Toggle button}} | ||
{{Toggle content start}} | {{Toggle content start}} | ||
{{Case study subcatchment}} | {{Case study subcatchment | ||
{{Site}} | |Subcatchment=Hampshire Avon (Upper) | ||
{{Project background}} | }} | ||
{{Motivations}} | {{Site | ||
{{Measures}} | |WFD water body code=GB108043022350, | ||
|WFD water body name=Hampshire Avon (Upper) | |||
|Heavily modified water body=No | |||
|Protected species present=No | |||
|Invasive species present=No | |||
}} | |||
{{Project background | |||
|Reach length directly affected=400m | |||
|Project started=2012/02/21 | |||
|Works started=2012/10/01 | |||
|Works completed=2013/12/02 | |||
|Total cost category=50 - 100 k€ | |||
|Funding sources=Catchment Restoration Fund, | |||
}} | |||
{{Motivations | |||
|Specific mitigation=Impoundments (not hydropower), | |||
|Hydromorphological quality elements=Flow velocities, Channel pattern/planform, Continuity of sediment transport, | |||
|Biological quality elements=Fish, Invertebrates, Macrophytes, | |||
}} | |||
{{Measures | |||
|Bank and bed modifications measure=Bed raising, Bank reprofiling, | |||
|Floodplain / River corridor=Wetland restoration, Habitat creation, | |||
|Planform / Channel pattern=Re-meandering, Improvement of natural flows, Creation of meanders, | |||
}} | |||
{{Hydromorphological quality elements header}} | {{Hydromorphological quality elements header}} | ||
{{End table}} | {{End table}} | ||
Line 60: | Line 83: | ||
{{Monitoring documents end}} | {{Monitoring documents end}} | ||
{{Additional Documents}} | {{Additional Documents}} | ||
{{Case study documents | |||
|File name=20150319 Project Record WCSP West Amesbury 2013.pdf | |||
|Description=Project Summary | |||
}} | |||
{{Additional Documents end}} | {{Additional Documents end}} | ||
{{Additional links and references header}} | {{Additional links and references header}} |
Latest revision as of 16:48, 2 January 2019
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Environmental flows and water resources, Habitat and biodiversity, Hydromorphology |
Country | England |
Main contact forename | Martijn |
Main contact surname | Antheunisse |
Main contact user ID | User:Martijnantheunisse |
Contact organisation | Wiltshire Wildlife Trust |
Contact organisation web site | http://www.wiltshirewildlife.org |
Partner organisations | Environment Agency, Natural England, Wessex Water, Wiltshire Fishery Association, The Piscatorial Society |
Parent multi-site project |
Case_study:Strategic Framework for Restoration of the River Avon (SFfRRA) |
This is a parent project encompassing the following projects |
No |
Project summary
The project’s aims were to undo the effects of detrimental physical alteration in the past, such as dredging and channelization; sediment issues; and loss of habitat for fish and plants. These aims were tackled through the following objectives:
Drought proofing rivers Mitigating climate change (hydrology, temperature) by reinstating natural processes of erosion and deposition and planting trees for shade and as a future source of natural woody debris.
Reducing the amount of sediment within the channel By promoting scour of the river bed through increasing flow velocity and by installing brushwood structures to act as sediment traps, the project will improve the site for salmonid spawning as well as helping to maintain the signature ‘gin clear’ waters of a chalk stream.
Create habitat for fish, plants The structures installed in this project are aimed to provide habitat for a variety of plants, fish, invertebrates, birds and mammals, either through the introduction of food in the form of woody debris and leaf matter, or the provision of spawning habitat and cover.
Monitoring surveys and results
The project site is being monitored by the Piscatorial Society. Monitoring involves invertebrate sampling, electro-fish survey and fixed point photography. Results have yet to be analysed.
Lessons learnt
Archaeological considerations and heavy rainfall/flooding both caused considerable delay and a change in the scope of this project. Due to the proximity of the Stonehenge World Heritage site, English Heritage was not happy with the original restoration plan, so the project was delayed to re-plan. During this time the area received record rainfall, leading to flooding which prevented work from being undertaken. For future projects, further time should be allowed to fully investigate potential archaeological issues and allow for bad weather/environmental delays.
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Gunville Phase I, Longstreet A 91a, River Avon Habitat Enhancement, Fifield, River Avon at East Chisenbury
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|