Case study:Markway Stream Restoration: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
(3 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
{{Case study status | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
Line 31: | Line 31: | ||
|Name=Markway Stream | |Name=Markway Stream | ||
|WFD water body code=GB107042011360 | |WFD water body code=GB107042011360 | ||
|WFD water body name=Ober Water | |||
|Heavily modified water body=Yes | |Heavily modified water body=Yes | ||
|Protected species present=No | |Protected species present=No | ||
Line 40: | Line 41: | ||
|Project completed=2006/12/31 | |Project completed=2006/12/31 | ||
|Total cost category=10 - 50 k€ | |Total cost category=10 - 50 k€ | ||
|Funding sources=EU | |Funding sources=EU LIFE Programme, | ||
}} | }} | ||
{{Motivations | {{Motivations | ||
Line 46: | Line 47: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure=Excavation of bedrock, | |Bank and bed modifications measure=Excavation of bedrock, | ||
|Planform / Channel pattern=Creation of meanders, | |||
|Other technical measure=Installation of a clay plug | |Other technical measure=Installation of a clay plug | ||
}} | }} |
Latest revision as of 16:47, 2 January 2019
Location: 50° 50' 0.09" N, 1° 38' 46.43" W
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | http://www.newforestlife.org.uk/life3/life3index.htm |
Themes | Environmental flows and water resources, Hydromorphology, Land use management - forestry |
Country | England |
Main contact forename | Bryan |
Main contact surname | Boult |
Main contact user ID | |
Contact organisation | Hampshire County Council |
Contact organisation web site | http://www.hants.gov.uk/ |
Partner organisations | English Nature, Environment Agency, Forestry Commission, National Trust, RSPB |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Edit project overview to modify the project summary.
This site is a part of New Forest LIFE project. The aim of the project at this site was to develop a restoration scheme for the river that would balance the Commoner’s aspirations for floodplain grazing with the conservation objections of the New Forest SAC. Works contained the excavation and reinstatement of former meandering channel, installation of a clay plug 20-30cm higher than the surrounding floodplain and removal of weed from a 350m length of channel.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and referencesSupplementary InformationEdit Supplementary Information
|