Case study:Roneo Corner: Difference between revisions
No edit summary |
No edit summary |
||
(6 intermediate revisions by 3 users not shown) | |||
Line 14: | Line 14: | ||
{{Project overview | {{Project overview | ||
|Status=Planned | |Status=Planned | ||
|Themes=Fisheries, Flood risk management | |Themes=Fisheries, Flood risk management, Social benefits | ||
|Country=England | |Country=England | ||
|Main contact forename=Becca | |Main contact forename=Becca | ||
Line 27: | Line 27: | ||
{{Toggle_button}} | {{Toggle_button}} | ||
{{Toggle_content_start}} | {{Toggle_content_start}} | ||
{{ | {{Case study subcatchment | ||
|Subcatchment= | |Subcatchment=Rom / Beam (Including Bourne Brook, from Watton's Green to confluence with Ravensbourne) | ||
}} | }} | ||
{{Site | {{Site | ||
|WFD water body code=GB106037028120 | |||
|WFD water body name=Rom / Beam (Including Bourne Brook, from Watton's Green to confluence with Ravensbourne) | |||
|Heavily modified water body=No | |||
|Protected species present=No | |||
|WFD water body code= | |Invasive species present=No | ||
|WFD water body name= | |||
|Heavily modified water body= | |||
|Protected species present= | |||
|Invasive species present= | |||
}} | }} | ||
{{Project_background | {{Project_background | ||
Line 160: | Line 110: | ||
}} | }} | ||
{{Motivations | {{Motivations | ||
|Specific mitigation=Riparian development | |||
|Specific mitigation= | |||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Removing of concrete structures | ||
|Planform / Channel pattern=Creation of meanders, | |||
|Planform / Channel pattern= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} |
Latest revision as of 16:45, 2 January 2019
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Planned |
---|---|
Project web site | |
Themes | Fisheries, Flood risk management, Social benefits |
Country | England |
Main contact forename | Becca |
Main contact surname | O’Shea |
Main contact user ID | |
Contact organisation | Environment Agency |
Contact organisation web site | http://www.gov.uk/government/organisations/environment-agency |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Restoring the Rom to allow it to meander through the course of the old river; removal of concrete banks and bed at upstream end; reconnect with its floodplain. This stretch has been straightened, deepened, the raised banks containing it within the manipulated channel, despite being located in open parkland. The course of the old river can be seen in places, forming wet depressions, so it may be possible to link these back up.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Chase Nature Reserve, Colliers Row, King Georges Playing Field, Raphael Park
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|