Case study:Long Eau (Great Eau): Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
 
(11 intermediate revisions by 6 users not shown)
Line 1: Line 1:
{{Case study status
{{Case study status
|Approval status=Draft
|Approval status=Approved
}}
}}
{{Location
{{Location
Line 11: Line 11:
|Main contact forename=Nick
|Main contact forename=Nick
|Main contact surname=Elbourne
|Main contact surname=Elbourne
|Contact organisation=Lincolnshire Chalk Streams
|Contact organisation url=www.lincswolds.org.uk/chalk-streams/lincolnshire-chalk-streams
|Multi-site=No
|Multi-site=No
|Project picture=DSC02373.JPG
|Picture description=Long Eau floodplain 2005
|Project summary=Flowing from the Lincolnshire Wolds to the North Sea, the Long Eau drains a small catchment of 22.3 km2, but together with the Great Eau has a catchment area of 112.3 km2.  
|Project summary=Flowing from the Lincolnshire Wolds to the North Sea, the Long Eau drains a small catchment of 22.3 km2, but together with the Great Eau has a catchment area of 112.3 km2.  
Before restoration, the river had become embanked and channelised to protect adjacent agricultural land from flooding. The flood banks were steeply sloped directly into the channel. Dredging and removal of bankside vegetation was part of the maintenance regime, which had removed morphological features, in channel habitats and natural substrate. Historically the Long Eau had a history of washlands, regularly flooding the land adjacent to the river.  
Before restoration, the river had become embanked and channelised to protect adjacent agricultural land from flooding. The flood banks were steeply sloped directly into the channel. Dredging and removal of bankside vegetation was part of the maintenance regime, which had removed morphological features, in channel habitats and natural substrate. Historically the Long Eau had a history of washlands, regularly flooding the land adjacent to the river.  
Line 21: Line 25:
Performance 1995-2001-
Performance 1995-2001-
Since completion flood protection has increased, as water spills onto new floodplain when channel reaches 2.6m or above. Below this level 75% of floodplain will retain water up to 0.5m for up to 4 months. This provides an important habitat for wetland birds. Lapwing and redshank have bred at the site.  
Since completion flood protection has increased, as water spills onto new floodplain when channel reaches 2.6m or above. Below this level 75% of floodplain will retain water up to 0.5m for up to 4 months. This provides an important habitat for wetland birds. Lapwing and redshank have bred at the site.  
The Environment Agency estimates a saving of £400-500 a year on the previous maintenance regime.  
The Environment Agency estimates a saving of £400-500 a year on the previous maintenance regime.
 
}}
}}
{{Image gallery}}
{{Image gallery end}}
{{Toggle button}}
{{Toggle content start}}
{{Case study subcatchment
{{Case study subcatchment
|Subcatchment=Trent
|Subcatchment=Long Eau
}}
}}
{{Site
{{Site
|Name=Long Eau at Manby
|Name=Long Eau at Manby
|WFD water body code=GB105029061670
|WFD water body name=Long Eau
|Pre-project morphology=Embanked, Over-widened, Over deepened,
|Pre-project morphology=Embanked, Over-widened, Over deepened,
|Reference morphology=Set back defence,
|Reference morphology=Set back defence,
Line 34: Line 43:
|Protected species present=No
|Protected species present=No
|Invasive species present=No
|Invasive species present=No
|Dominant hydrology=Artificially regulated,  
|Dominant hydrology=Artificially regulated,
|River corridor land use=Intensive agriculture (arable), Improved/semi-improved grassland/pasture,  
|River corridor land use=Intensive agriculture (arable), Improved/semi-improved grassland/pasture,
}}
}}
{{Project background
{{Project background
|Reach length directly affected=900
|Reach length directly affected=900
|Project started=1992
|Works started=1995/05/01
|Works started=1995/05/01
|Works completed=1995/07/01
|Works completed=1995/07/01
|Project completed=1996/01/01
|Total cost category=50 - 100 k€
|Total cost category=50 - 100 k€
|Funding sources=environmental stewardship scheme  
|Funding sources=environmental stewardship scheme
|Works1 and supervision cost category=50 - 100 k€
|Works1 and supervision cost category=50 - 100 k€
}}
}}
Line 50: Line 61:
}}
}}
{{Measures
{{Measures
|Floodplain / River corridor=setback flood defences,  
|Floodplain / River corridor=Displacement of flood defences, Lowering of embankments,
|Planform / Channel pattern=Backwaters created,
|Planform / Channel pattern=Creation of backwater,
|Other technical measure=Embankments lowered,  
}}
}}
{{Hydromorphological quality elements header}}
{{Hydromorphological quality elements header}}
Line 64: Line 74:
{{Monitoring documents}}
{{Monitoring documents}}
{{Monitoring documents end}}
{{Monitoring documents end}}
{{Image gallery}}
{{Image gallery end}}
{{Additional Documents}}
{{Additional Documents}}
{{Additional Documents end}}
{{Additional Documents end}}
Line 71: Line 79:
{{Additional links and references footer}}
{{Additional links and references footer}}
{{Supplementary Information}}
{{Supplementary Information}}
{{Toggle content end}}

Latest revision as of 16:21, 2 January 2019

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 53° 21' 22.58" N, 0° 6' 55.08" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Flood risk management, Habitat and biodiversity, Land use management - agriculture
Country England
Main contact forename Nick
Main contact surname Elbourne
Main contact user ID
Contact organisation Lincolnshire Chalk Streams
Contact organisation web site http://www.lincswolds.org.uk/chalk-streams/lincolnshire-chalk-streams
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Long Eau floodplain 2005

Project summary

Edit project overview to modify the project summary.


Flowing from the Lincolnshire Wolds to the North Sea, the Long Eau drains a small catchment of 22.3 km2, but together with the Great Eau has a catchment area of 112.3 km2. Before restoration, the river had become embanked and channelised to protect adjacent agricultural land from flooding. The flood banks were steeply sloped directly into the channel. Dredging and removal of bankside vegetation was part of the maintenance regime, which had removed morphological features, in channel habitats and natural substrate. Historically the Long Eau had a history of washlands, regularly flooding the land adjacent to the river. Three sites were chosen along the Little ands Great Eau to demonstrate the relocation of flood banks and the provision of flood storage areas on neighbouring land. A secondary objective was to enhance habitats. An environmental stewardship scheme offered a ten year grant scheme to farmers/landowners, some of whom were already supportive of the idea of nature conservation. Long Eau at Manby- Left floodbank was lowered to just above ground level. The adjacent field was widened and flattened to act as an over spill area (1 in 10 slope). Material generated from embankment removal was used to infill and Internal Drainage Board drain which ran through flood storage area. This drain was re located behind the new embankment to maintain land drainage. The new embankment slopes were 3:1 to a height of 2.5-2.7 meters. Ledges and berms were created along the channel to increased habitat potential. Performance 1995-2001- Since completion flood protection has increased, as water spills onto new floodplain when channel reaches 2.6m or above. Below this level 75% of floodplain will retain water up to 0.5m for up to 4 months. This provides an important habitat for wetland birds. Lapwing and redshank have bred at the site. The Environment Agency estimates a saving of £400-500 a year on the previous maintenance regime.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Anglian
River basin Witham

Subcatchment

River name Long Eau
Area category 10 - 100 km²
Area (km2)
Maximum altitude category 100 - 200 m
Maximum altitude (m) 110110 m <br />0.11 km <br />11,000 cm <br />
Dominant geology Calcareous
Ecoregion Great Britain
Dominant land cover Arable and Horticulture
Waterbody ID GB105029061670



Site

Name Long Eau at Manby
WFD water body codes GB105029061670
WFD (national) typology
WFD water body name Long Eau
Pre-project morphology Embanked, Over-widened, Over deepened
Reference morphology Set back defence
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology Artificially regulated
Dominant substrate
River corridor land use Intensive agriculture (arable), Improved/semi-improved grassland/pasture
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 900900 m <br />0.9 km <br />90,000 cm <br />
Project started 1992
Works started 1995/05/01
Works completed 1995/07/01
Project completed 1996/01/01
Total cost category 50 - 100 k€
Total cost (k€)
Benefit to cost ratio
Funding sources environmental stewardship scheme

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision 50 - 100 k€
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure Flood risk management
Hydromorphology
Biology
Physico-chemical
Other reasons for the project secondary objective of habitat improvement


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor Displacement of flood defences, Lowering of embankments
Planform / Channel pattern Creation of backwater
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information