Case study:Bury Lodge Wetlands: Difference between revisions
No edit summary |
No edit summary |
||
(7 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
{{ | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
|Location=51. | |Location=51.632260949912, -0.07518178224359 | ||
}} | }} | ||
{{Project overview | {{Project overview | ||
Line 18: | Line 11: | ||
|Main contact forename=Ian | |Main contact forename=Ian | ||
|Main contact surname=Russell | |Main contact surname=Russell | ||
|Contact organisation=London Borough of Enfield | |||
|Partner organisations=London Borough of Enfield, Thames 21, Environment Agency | |Partner organisations=London Borough of Enfield, Thames 21, Environment Agency | ||
|Name of parent multi-site project=Case_study:Rewilding Enfield's Urban Rivers | |Name of parent multi-site project=Case_study:Rewilding Enfield's Urban Rivers | ||
|Multi-site=No | |Multi-site=No | ||
|Project summary=As part of the Thames21 project "the Salmons Brook Healthy River Challenge", it is proposed to create a flood storage area incorporating a wetland nature reserve, possibly involving the re-alignment of Salmons Brook. | |Project summary=As part of the Thames21 project "the Salmons Brook Healthy River Challenge", it is proposed to create a flood storage area incorporating a wetland nature reserve, possibly involving the re-alignment of Salmons Brook. The site is on council owned land, and occupies a former depot. Works include the construction of wetlands and a swale treating runoff from the A10 before it enters the Salmons Brook, designed by the London Borough of Enfield's watercourses team. The site could accommodate up to 5,000m3 of flood waters, benefitting properties downstream. The use of reeds and other aquatic plant species would serve to improve water quality in Salmons Brook by filtering out sediments and absorbing nutrients. Thus at the same time providing an area of educational interest and recreation by sensitively landscaping the area into an ecologically interesting site with habitat creation. Allowing use by a neighbouring school and as a safe linkage between two neighbouring communities as part of the creation of a green transport link along Salmons Brook from Little Bury Street right through to Edmonton Green. The key benefits include: • Reduction in flood risk to properties in Edmonton Green area downstream<br>• Enhanced wildlife habitat in the park and along the river corridor<br>• Creation of a new resource for the local community<br>• Improved water quality to Salmons Brook<br>• Provision footpath/cycleway along river would improve green transport links across the borough | ||
|Monitoring surveys and results=A Water Quality monitoring programme is in place with Thames21. | |Monitoring surveys and results=A Water Quality monitoring programme is in place with Thames21, measuring parameters such as: | ||
- Dissolved Oxygen and Biological Oxygen Demand | |||
-Nutrients (nitrates, phosphates and ammonia) | |||
- Heavy Metals: The concentration of heavy metals in the brook is indicative of road runoff. High levels of heavy metals can be damaging to wildlife, and may cause difficulties in the development of wildlife. The wetlands and swales will help to immobilise these by intercepting road runoff before it enters the stream. | |||
In addition, London Borough of Enfield has commissioned Ecological Assessments to monitor current species and species diversity as the project advances | |||
}} | |||
{{Image gallery}} | |||
{{Case study image | |||
|File name=View looking East.jpg | |||
}} | |||
{{Case study image | |||
|File name=View looking West.jpg | |||
}} | |||
{{Case study image | |||
|File name=BL Construction.JPG | |||
}} | }} | ||
{{Image_gallery_end}} | {{Image_gallery_end}} | ||
{{Toggle_button}} | {{Toggle_button}} | ||
Line 43: | Line 55: | ||
{{Project background | {{Project background | ||
|Reach length directly affected=410 m | |Reach length directly affected=410 m | ||
|Project started=2012/08/06 | |||
}} | }} | ||
{{Motivations | {{Motivations |
Latest revision as of 13:15, 2 January 2019
Project overview
Status | In progress |
---|---|
Project web site | |
Themes | Environmental flows and water resources, Flood risk management, Habitat and biodiversity, Monitoring, Social benefits, Water quality, Urban |
Country | England |
Main contact forename | Ian |
Main contact surname | Russell |
Main contact user ID | |
Contact organisation | London Borough of Enfield |
Contact organisation web site | |
Partner organisations | London Borough of Enfield, Thames 21, Environment Agency |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
As part of the Thames21 project "the Salmons Brook Healthy River Challenge", it is proposed to create a flood storage area incorporating a wetland nature reserve, possibly involving the re-alignment of Salmons Brook. The site is on council owned land, and occupies a former depot. Works include the construction of wetlands and a swale treating runoff from the A10 before it enters the Salmons Brook, designed by the London Borough of Enfield's watercourses team. The site could accommodate up to 5,000m3 of flood waters, benefitting properties downstream. The use of reeds and other aquatic plant species would serve to improve water quality in Salmons Brook by filtering out sediments and absorbing nutrients. Thus at the same time providing an area of educational interest and recreation by sensitively landscaping the area into an ecologically interesting site with habitat creation. Allowing use by a neighbouring school and as a safe linkage between two neighbouring communities as part of the creation of a green transport link along Salmons Brook from Little Bury Street right through to Edmonton Green. The key benefits include: • Reduction in flood risk to properties in Edmonton Green area downstream
• Enhanced wildlife habitat in the park and along the river corridor
• Creation of a new resource for the local community
• Improved water quality to Salmons Brook
• Provision footpath/cycleway along river would improve green transport links across the borough
Monitoring surveys and results
A Water Quality monitoring programme is in place with Thames21, measuring parameters such as:
- Dissolved Oxygen and Biological Oxygen Demand
-Nutrients (nitrates, phosphates and ammonia)
- Heavy Metals: The concentration of heavy metals in the brook is indicative of road runoff. High levels of heavy metals can be damaging to wildlife, and may cause difficulties in the development of wildlife. The wetlands and swales will help to immobilise these by intercepting road runoff before it enters the stream.
In addition, London Borough of Enfield has commissioned Ecological Assessments to monitor current species and species diversity as the project advances
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Alma Road Rain Gardens, Enfield Town Park Wetlands, Glenbrook Wetlands, Grovelands Park Wetlands, Houndsden Road Rain Gardens, Laymer Road Silt Trap and Recreational Ground, Rewilding Enfield's Urban Rivers, Salmons Brook Flood Alleviation Scheme, Montagu Recreation Ground site, Salmons Brook River Restoration at Laymer Road, Salmons Brook at Grange Park
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|