Case study:New Forest Life III project: Difference between revisions
(Created page with "{{Case study status |Approval status=Draft }} {{Location |Location=50.8388182, -1.5812980000000607 }} {{Project overview |Project title=New Forest Life III project |Status=Com...") |
No edit summary |
||
(13 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
{{Case study status | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
Line 6: | Line 6: | ||
}} | }} | ||
{{Project overview | {{Project overview | ||
|Status=Complete | |Status=Complete | ||
|Themes=Habitat and biodiversity | |Project web site url=www.therrc.co.uk/sites/default/files/projects/1_newforest.pdf | ||
|Themes=Flood risk management, Habitat and biodiversity, Hydromorphology, Land use management - forestry, Monitoring | |||
|Country=England | |Country=England | ||
|Main contact forename=Maxine | |Main contact forename=Maxine | ||
|Main contact surname=Holden | |Main contact surname=Holden | ||
|Contact organisation=Environment Agency | |Contact organisation=Environment Agency | ||
|Contact organisation url= | |Contact organisation url=www.gov.uk/government/organisations/environment-agency | ||
|Multi-site=No | |Multi-site=No | ||
|Project picture=1 New Forest.png | |||
|Project summary=The New Forest is one of the largest remaining areas in western Europe supporting a mosaic of heathland, wetlands and semi-natural forest. It has been designated as a Special Area of Conservation (SAC) under the Habitats Directive in 2004 and has been a National Park since 2005. In 2003, with 40% EU LIFE 3 funding, a 4-year project began to restore the streams and wetlands within the Lymington River, Avon Water and Hampshire Avon catchments. This involved reinstating the characteristic sinuous course of the streams, adding large wood to channels, reconnecting floodplains and old meanders and restoring the characteristic wetlands and riparian forest. A total of 10 km of degraded, straightened rivers were restored through floodplain reconnection, reinstating or reconnecting old meanders, and adding wood to the channel (upper tributaries of the Lymington River only). These restoration measures together resulted in a 21% reduction of flood peak magnitude and a 33% increase in flood peak travel time for flows that were less than 1m3s-1 (equal to a 2-year recurrence interval). The project also resulted in the restoration of 261ha of riparian woodland, 18ha of bog woodland, 184ha of valley mires and 141ha of wetland habitats. | |||
|Project title=New Forest Life III project | |||
}} | }} | ||
{{Image gallery}} | {{Image gallery}} | ||
Line 21: | Line 24: | ||
{{Toggle content start}} | {{Toggle content start}} | ||
{{Case study subcatchment}} | {{Case study subcatchment}} | ||
{{Site}} | {{Site | ||
{{Project background}} | |Name=Lymington River | ||
{{Motivations}} | |Heavily modified water body=No | ||
{{Measures}} | |Protected species present=No | ||
|Invasive species present=No | |||
}} | |||
{{Project background | |||
|Project started=2002/01/01 | |||
|Total1 cost=£2.9m | |||
|Funding sources=EU LIFE Programme, Partnership contributions | |||
}} | |||
{{Motivations | |||
|Specific mitigation=Flood risk management | |||
}} | |||
{{Measures | |||
|Floodplain / River corridor=Habitat diversification | |||
|Wider stakeholder / citizen engagement=Monitoring and survey projects | |||
}} | |||
{{Hydromorphological quality elements header}} | {{Hydromorphological quality elements header}} | ||
{{End table}} | {{End table}} |
Latest revision as of 13:52, 1 November 2018
Project overview
Status | Complete |
---|---|
Project web site | http://www.therrc.co.uk/sites/default/files/projects/1_newforest.pdf |
Themes | Flood risk management, Habitat and biodiversity, Hydromorphology, Land use management - forestry, Monitoring |
Country | England |
Main contact forename | Maxine |
Main contact surname | Holden |
Main contact user ID | |
Contact organisation | Environment Agency |
Contact organisation web site | http://www.gov.uk/government/organisations/environment-agency |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The New Forest is one of the largest remaining areas in western Europe supporting a mosaic of heathland, wetlands and semi-natural forest. It has been designated as a Special Area of Conservation (SAC) under the Habitats Directive in 2004 and has been a National Park since 2005. In 2003, with 40% EU LIFE 3 funding, a 4-year project began to restore the streams and wetlands within the Lymington River, Avon Water and Hampshire Avon catchments. This involved reinstating the characteristic sinuous course of the streams, adding large wood to channels, reconnecting floodplains and old meanders and restoring the characteristic wetlands and riparian forest. A total of 10 km of degraded, straightened rivers were restored through floodplain reconnection, reinstating or reconnecting old meanders, and adding wood to the channel (upper tributaries of the Lymington River only). These restoration measures together resulted in a 21% reduction of flood peak magnitude and a 33% increase in flood peak travel time for flows that were less than 1m3s-1 (equal to a 2-year recurrence interval). The project also resulted in the restoration of 261ha of riparian woodland, 18ha of bog woodland, 184ha of valley mires and 141ha of wetland habitats.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|